Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 8:41pm On May 07, 2016
tbaba1234:
All these Jonathan fans def... Mambilla was cancelled in 2013 due to the failure of Nigeria to meet their part of the agreement.

http://sweetcrudereports.com/2013/12/26/nigeria-admits-failure-to-award-mambilla-hydro-contract/

The deal was renegotiated by Buhari.
http://thenewsnigeria.com.ng/2015/12/buhari-woos-china-over-20-3b-rail-projects-mambilla-dam/
Lol! Sambo aptly replies you
http://www.informationng.com/2015/01/buhari-lied-mambilla-power-project-already-revived-by-fg-sambo-•says-jonathan-approved-n30bn-for-power-transmission-distribution-in-taraba.html
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by bolanto24(m): 8:42pm On May 07, 2016
ALISMILE:
That why I said steps! Note the plurality! Tthe govt is serious about diversifying the economy! Its gonna take time! But I believe the govt can do it! The unpredictability of oil prices and the unprovoked militant activities re already enough motivation for the govt!
Did u say unprovoked militant activitieshuh Something must be wrong with you.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Ghost01(m): 8:43pm On May 07, 2016
playtheblues:
You dig oil from South south to develop the North. Thank you.
Cry me a river.

Every one is tired of the whole Niger Delta militants menace.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f):
mikolo80:
those teething problems is why we jona's name will not be recognised.na who commision the project we know
Who is ? Hope its not Buhari as the Mambila Hydro cannot be commisioned in 8 years even if it started last week! An average 2 weeks contract in Nigeria is delivered in 5 weeks minimum; talkless of where a contractor told you six years. LOL....
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by micktoxin(m): 8:49pm On May 07, 2016
hmuhammad:
what is the load demand in lagos?
Lagos is massively underpowered. Using the western diversity factor a typical 3 bed house in Lagos should be allocated 2KVA or 1.3KVA for 2bed. Now do the maths for all the houses in Lagos and you will see 3GW isn't that much.
The thing is people are being conservative in their load usage because of lack of stable electricity. So the real load is definitely higher than what everyone is currently using.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Ebukaokeke5: 8:56pm On May 07, 2016
Great one!!!.May the lord see u 2ru its completion sir.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Opomulero88: 8:59pm On May 07, 2016
oduastates:
Step in the right direction.
No more gas plants until other sources of gas are tapped.
All those gas Wells in the benue and Niger basin,that the government sealed off in the 70's,should be brought back to play.

Potential sites for hydro power in yorubaland.some are small and some are massive. They can supply between 10MW and 1000MW each. Supply the energy generated to local communities and feed the excess into the grid. Hopefully an autonomous or independent yoruba country.


OGUN STATE


Eriwe Fish Farm Reservoir
Farm Complex Reservoir
Oyan River Dam
Texagari Dam

ONDO STATE

Awara Dam
Egbe Dam
Ero Dam
Erusu Dam
Ogbese Dam
Owena Dam

OYO STATE

Name
Asejire Reservoir
Ede/Oshogbo Reservoir
Eko-Ende Reservoir
Erelu Reservoir
Eruwa Reservoir
Esa-Odo Reservoir
Eni-Osa Ojoo Dam
I.I.T.A. Reservoir
Model Fish Farm Reservoir
Ogbomoso Reservoir
Ogunpa Reservoir
Otiki Reservoir
Shaki Dam
Egbe and Ero dams are in Ekiti State
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by mikolo80: 8:59pm On May 07, 2016
chudionu58:
Who is ? Hope its not Buhari as the Mambila jydro cannot be commisioned in 8 years even if it started last week! An average 2 weeks contract in Nigeria is delivered in 5 weeks minimum; talkless of where a contractor told you six years. LOL....
Shebi we're looking
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 9:00pm On May 07, 2016
chudionu58:
Lol! Sambo aptly replies you
http://www.informationng.com/2015/01/buhari-lied-mambilla-power-project-already-revived-by-fg-sambo-•says-jonathan-approved-n30bn-for-power-transmission-distribution-in-taraba.html
Link does not work.

Revived with not a single stone on the ground and they are still going to negotiate with the state government??... OBJ tried to revive it too.. GEJ tried too... Yet there is no stone on the ground..

This is not the only agreement that Nigeria failed to meet their side... It happened with rails as well..

In 2013, it was cancelled because of our failure to meet our side.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by persius555(m): 9:01pm On May 07, 2016
If we had started this project in 2012, by next year 2017 the country would be preparing to commision the power plant.
For good sixteen years, we had a PDP government that was bereft of ideas, led by greedy demons who can never be of any good to hell.
We will surely get there.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by hmuhammad(m): 9:02pm On May 07, 2016
micktoxin:
Lagos is massively underpowered. Using the western diversity factor a typical 3 bed house in Lagos should be allocated 2KVA or 1.3KVA for 2bed. Now do the maths for all the houses in Lagos and you will see 3GW isn't that much.
The thing is people are being conservative in their load usage because of lack of stable electricity. So the real load is definitely higher than what everyone is currently using.
which of d discos supplies lagos?
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Khez: 9:06pm On May 07, 2016
Sixty what months?

Jezzz shocked
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by ZUBY77(m): 9:09pm On May 07, 2016
ALISMILE:
This govt is wise in taking steps to gradually move away from oil dependence! It will get to a stage our oil in d ND will no longer be relevant!
We have been hearing the same crap since forever.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by oduastates: 9:23pm On May 07, 2016
Opomulero88:
Egbe and Ero dams are in Ekiti State
Old Ondo state.
I have removed the state heading.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 9:31pm On May 07, 2016
tbaba1234:
Link does not work.

Revived with not a single stone on the ground and they are still going to negotiate with the state government??... OBJ tried to revive it too.. GEJ tried too... Yet there is no stone on the ground..

This is not the only agreement that Nigeria failed to meet their side... It happened with rails as well..

In 2013, it was cancelled because of our failure to meet our side.
http://thenationonlineng.net/jonathan-sambo-buhari-lied-mambilla-dam/
...And it was reactivated late 2014 under Jonathan but Buhari wants to simply renegotiate probably based on his "zero corrupt" government's inability to fulfil the 15%! not that work can't go on based on what was negotiated earlier. APC can deceive you guys not me!!
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 9:34pm On May 07, 2016
chudionu58:
http://thenationonlineng.net/jonathan-sambo-buhari-lied-mambilla-dam/
...And it was reactivated late 2014 under Jonathan but Buhari wants to simply renegotiate probably based on his "zero corrupt" government's inability to fulfil the 15%! not that work can't go on based on what was negotiated earlier. APC can deceive you guys not me!!
What was reactivated in 2014 was negotiation not the contract.

Nigeria started renegotiating but nothing was concluded before GEJ left.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by juman(m): 9:35pm On May 07, 2016
Hope its not just propaganda news.

Because this is unserious country.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 9:36pm On May 07, 2016
pheliciti:
Jona planned to, wanted to etc it's all irrelevant now as he didn't. Imagine you saying they couldn't fund 15%? But they had enough to steal sha? Listen to yourself and see what hatred has reduced you to. So bad that you now contradict yourself. You better quit wailing. ..it's killing you.
Tar! so why can't the government that is not stealing unable to pay the 15% but are rather seeking desperately a 'whole contractor finance'?? So who's contradictory herehuh
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by oduastates: 9:38pm On May 07, 2016
tbaba1234:
Link does not work.

Revived with not a single stone on the ground and they are still going to negotiate with the state government??... OBJ tried to revive it too.. GEJ tried too... Yet there is no stone on the ground..

This is not the only agreement that Nigeria failed to meet their side... It happened with rails as well..

In 2013, it was cancelled because of our failure to meet our side.
You are talking about stone. Where will you put the stone?
Not a plot of land acquired for their phantom dam by the corrupt Jonathan government.
You are talking to some of the most uninformed people in that country.
They believe the crap that they are constantly fed.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by playtheblues(f): 9:46pm On May 07, 2016
Why is gold cheaper in Kano?

Ghost01:
Cry me a river.

Every one is tired of the whole Niger Delta militants menace.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 10:03pm On May 07, 2016
tbaba1234:
What was reactivated in 2014 was negotiation not the contract.

Nigeria started renegotiating but nothing was concluded before GEJ left.
http://www.nigeriaelectricityhub.com/?p=2274
http://energymixreport.com/fresh-hurdles-hit-nigerias-largest-hydro-power-project/
You are not entirely correct please, the designs and the funding mechanism was in place as at late 2014 but the CME wanted to be in the full picture(occasioned by the continued fall in oil prices) which caused a slight shift in the flag off date and that coincided with the election period which distracted the whole system....So, Buhari and his team are not bringing anything new apart from their whole contractor financing ish, which shouldn't generate noise as there are designs and funding mechanism already in place which they freely chose to alter.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 10:08pm On May 07, 2016
It won't be a bad idea to build 3,000MW in other zones of the country
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 10:21pm On May 07, 2016
chudionu58:
http://www.nigeriaelectricityhub.com/?p=2274
http://energymixreport.com/fresh-hurdles-hit-nigerias-largest-hydro-power-project/
You are not entirely correct please, the designs and the funding mechanism was in place as at late 2014 but the CME wanted to be in the full picture(occasioned by the continued fall in oil prices) which caused a slight shift in the flag off date and that coincided with the election period which distracted the whole system....So, Buhari and his team are not bringing anything new apart from their whole contractor financing ish, which shouldn't generate noise as there are designs and funding mechanism already in place which they freely chose to alter.
I am not incorrect... I have read those articles before.

We did start renegotiating in 2014. After we failed in 2013.

As at early 2015, we were going to start another round of negotiations especially with falling oil prices. We did not have the money to back it up.

Buhari came in and completed the process. Give credit where it is due
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Menakay(m): 10:22pm On May 07, 2016
kayfra:
The federal government has commenced discussions with the Taraba State Governor, Mr Dickson Ishaku to construct a 3050megawatts (mw) Mambilla Hydropower Plant in the state, Power Minister, Babatunde Fashola has announced.



“We have opened discussions with the Governor of Taraba State, Governor Dickson Ishaku, who incidentally was once a minister of state for power," he said.

“The first thing to do is to acquire the land and deal with compensation issues, which the governor has promised to deal with.”

He said the project would be “the single largest power plant with over 3,000mw in one place and it potentially takes us close to steady power" if built.

“The feasibility study has been done and so too the environmental impact assessment. We move one day at a time closer to starting Mambilla," he added.

The project has been valued at $5.732billion (about N1.140trillion) with the Engineering, Procurement and Construction (EPC) contract proposed for two Chinese companies, Gezhouba Construction Group Corporation (CGGC), and the Sinohydro Corporation.

An official said the project would take 63 months to complete and be handed over to the federal government.

Nigeria is expected to contribute 25 per cent of the project’s fund while the China Export Import Bank provides 75 per cent.


www-nigerianbulletin-com-threads-fashola-opens-talks-on-construction-of-3050mw-power-plant-in-taraba-210850
This government talks and promise too much while they do less, do more and talk less or let what you re doing speak for u.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by ALISMILE(m): 10:39pm On May 07, 2016
mikolo80:
oil will always be relevant for vehicular movt as well as power generation.we need at least 100GW to get to where we should be.how much hydro potential does the whole river niger and benue have
Countries that do not ve oil still some how manage to generate electricity! Don't they? This oil has really made us mentally lazy!
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Lordxeer(m): 10:58pm On May 07, 2016
gunuvi:
any sensible government should be able to fix power problems in 6 months...fashola, 2015

mambilla powerplant alone will be completed in 63 months....fashola, 2016
Heavy is the head that wears the crown. That's why its always very easier to pick bones in government policies than to profer solution or rather make it work. Its hard to see the frame when u are in the picture.
------
And that's said, I think starting the plant is the first step in the right direction, as we all know every mega project anywhere in the world takes time. As Warren Buffet rightly pointed it out, "no matter how talented, powerful or influential u may be, somethings just gat to take time. You can't produce a baby in a month by impregnating 9 women".
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 11:14pm On May 07, 2016
tbaba1234:
I am not incorrect... I have read those articles before.

We did start renegotiating in 2014. After we failed in 2013.

As at early 2015, we were going to start another round of negotiations especially with falling oil prices. We did not have the money to back it up.

Buhari came in and completed the process. Give credit where it is due
Completed the process by doing exactly what?? Has there being any formal agreement to that effect?? Was it mentioned in Fashola's "Chinese Takeaway"? It could have being signed a month ago in China if it was ready as you want us to believe.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 11:17pm On May 07, 2016
Lordxeer:
Heavy is the head that wears the crown. That's why its always very easier to pick bones in government policies than to profer solution or rather make it work. Its hard to see the frame when u are in the picture.
------
And that's said, I think starting the plant is the first step in the right direction, as we all know every mega project anywhere in the world takes time. As Warren Buffet rightly pointed it out, "no matter how talented, powerful or influential u may be, somethings just gat to take time. You can't produce a baby in a month by impregnating 9 women".
Yet, Jonathan was expected to solve all problems in record time. Hmmmmmm!
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by mikolo80: 11:17pm On May 07, 2016
ALISMILE:
Countries that do not ve oil still some how manage to generate electricity! Don't they? This oil has really made us mentally lazy!
they have hydro electric potential. large gradient drops, ours is limited. In fact the hydro potential in Congo can actually power a third of Africa but we don't control that. a thermal generator costs 10 naira while solar and wind cost 100 naira. which would you go for if you had a 1 naira budget
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 11:21pm On May 07, 2016
chudionu58:
Completed the process by doing exactly what?? Has there being any formal agreement to that effect?? Was it mentioned in Fashola's "Chinese Takeaway"? It could have being signed a month ago in China if it was ready as you want us to believe.
By renegotiating the contract and reaching a workable agreement. For over 30 years, we have been trying to do the project. Finally, it looks like something is about to start.

The renegotiation of Mambilla took place in December 2015 not on the last China trip and it was mentioned in the media.

"Buhari is expected to discuss the funding of the $12 billion 1402 kilometres coastal rail project, re-negotiate the stalled N8.3billion Lagos-Kano rail project as well as the Mambilla hydro power project."

http://www.dailytrust.com.ng/news/general/buhari-seeks-china-s-help-to-restart-n4tr-rail-projects/122647.html#tVhw72XFpMHDeap3.99

Lagos-Kano rail was also stalled because we could not pay.
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 11:44pm On May 07, 2016
tbaba1234:
By renegotiating the contract and reaching a workable agreement. For over 30 years, we have been trying to do the project. Finally, it looks like something is about to start.

The renegotiation of Mambilla took place in December 2015 not on the last China trip and it was mentioned in the media.

"Buhari is expected to discuss the funding of the $12 billion 1402 kilometres coastal rail project, re-negotiate the stalled N8.3billion Lagos-Kano rail project as well as the Mambilla hydro power project."

http://www.dailytrust.com.ng/news/general/buhari-seeks-china-s-help-to-restart-n4tr-rail-projects/122647.html#tVhw72XFpMHDeap3.99

Lagos-Kano rail was also stalled because we could not pay.
Here we go....
According to your gospel, Buhari has completed the process; while the link you provided showed... "Buhari is expected to"....Doesnt that sound contradictory?? By the way why was it not signed in China since it's being completed?
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 11:46pm On May 07, 2016
chudionu58:
Here we go....
According to your gospel, Buhari has completed the process; while the link you provided showed... "Buhari is expected to"....Doesnt that sound contradictory?? By the way why was it not signed in China since it's being completed?
There is movement.. lets see where it takes us.