₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,248 members, 8,420,960 topics. Date: Friday, 05 June 2026 at 03:20 PM

Toggle theme

Programmes To Mark Wike's 100 Days In Office (photo) - Politics (3) - Nairaland

Nairaland ForumNairaland GeneralPoliticsProgrammes To Mark Wike's 100 Days In Office (photo) (19045 Views)

1 2 3 Reply (Go Down)

Re: Programmes To Mark Wike's 100 Days In Office (photo) by Nobody: 9:01am On May 25, 2016
drshrewd:
grin wike have never done a road with underground drainage and pedestrian walk way in his life. grin Amaechi did Iwofe ole grin
Go to gbolokiri, Ameachi didn't touch that section of PH jst because the people were against him for destroying their houses, Wike has built all the bad roads in that Area.

Then Elioparawa road that was one of the worst roads in PH followed by Iwofe and Rumuigbo road, these are the once i can remember.
Re: Programmes To Mark Wike's 100 Days In Office (photo) by sosodevf(m): 9:21am On May 25, 2016
Truckpusher:
Demdem the dimwit , you're changing monikers like panties abi ?

Try harder , Wike is working - I came home today and was greeted with beautiful roads that are well built and drainages well taken care of . Just stop throwing your dirts into the gutters from that slum you call home. cheesy
Drainage?

Re: Programmes To Mark Wike's 100 Days In Office (photo) by Nobody: 9:25am On May 25, 2016
drshrewd:
the worst desaster to have ever happened to Rivers State
these are some of his newly constructed open gutter drainage roads

Rumuwara from Elimgbu to Eliozu

www.nairaland.com/attachments/3737841_7403_jpeg31a8c8fc81815868ab51a16a4bf3dee5
www.nairaland.com/attachments/3737842_7404_jpeg6df4bf24b08123e5430a90d06b6784d5

Psychiatric road
www.nairaland.com/attachments/3493708_psy5_jpeg7f714280de44ed8edcd0f70bea04db94
www.nairaland.com/attachments/3493710_psy7_jpeg5f0775898225bac8c3e95bd9165e1858

over N90b borrowed gone to the winds

Wike open gutter roads is causing more havoc than good. All waters leaving this section is directed into serene estates like Tony and treasure estate within the localities kindly see what open gutter Road has caused. Wike's open gutter is going no where. The people are crying.

Re: Programmes To Mark Wike's 100 Days In Office (photo) by Nobody: 9:33am On May 25, 2016
drshrewd:
grin show me one road started by wike with a modern drainage facilities yet he's spent over N300b shocked shocked shocked shocked

The fool can't simply because there is nothing to give. Wike is a fraud.
Re: Programmes To Mark Wike's 100 Days In Office (photo) by ricsman(m): 10:33am On May 25, 2016
drshrewd:
[b] grin wha is his one cappin do you reside in rivers a all. hose roads you mentioned were all ongoing project before Amaechi left office. the underground drainage for Iwofe road was completed and road was done almost beyound city crown hotel. the section of psychiatric road done by Amaechgi was done with underground drainage and pedestrian walk way as shown below
www.nairaland.com/attachments/3493694_psy2_jpeg34012221328b92e13a385e0756440c8b
www.nairaland.com/attachments/3493693_psy1_jpeg1a9eeb0c8b472ca2a6165d3c1a0a3838
www.nairaland.com/attachments/3493695_psy3_jpeg28a5e9574b6316aa75ba44a4e0e8681e

he secion of same road done by wike is just a quintessence of his usual mediocrity______narow road, open gutter drainage and poorly consruced road

www.nairaland.com/attachments/3493710_psy7_jpeg5f0775898225bac8c3e95bd9165e1858
www.nairaland.com/attachments/3493709_psy6_jpegbfa79edebfbe09886cab2961f86a07ad
www.nairaland.com/attachments/3493709_psy6_jpegbfa79edebfbe09886cab2961f86a07ad
note he has borrowed over N90b already cheesy
[/b]
bros e b like say u dey for from of my house snap ds second n third pics lol
Re: Programmes To Mark Wike's 100 Days In Office (photo) by dechriscool(op): 10:36am On May 25, 2016
ajealadick:
Ol boy! did you go to school? First see your topic: Wike's 100 days? ....... After how many months?

Also several of your pictures are 'damaged' with bad spelling. This shows the type of crowd following the governor.
The 100 days in office is not my mistake,the MOD change my supposed topic to something more catching.
For the clown thing,if I tell you the personality of the person you are insulting,you will wish to be me.
Re: Programmes To Mark Wike's 100 Days In Office (photo) by Nobody: 11:06am On May 25, 2016
ricsman:
bros e b like say u dey for from of my house snap ds second n third pics lol

In otherwords he presented nothing but the truth. Shame to wike cocck suckers.
Re: Programmes To Mark Wike's 100 Days In Office (photo) by Nobody: 11:33am On May 25, 2016
drshrewd:
grin wike have never done a road with underground drainage and pedestrian walk way in his life. grin Amaechi did Iwofe ole grin
What are you laughing about? Amaechi awarded the contract but did not do a single thing (rumor is that it was because wike is from that area). Wike completed that project in less than 6 months. I work at Aker road before you start asking questions..
Re: Programmes To Mark Wike's 100 Days In Office (photo) by maimalari: 12:10pm On May 25, 2016
og2711:
What are you laughing about? Amaechi awarded the contract but did not do a single thing (rumor is that it was because wike is from that area). Wike completed that project in less than 6 months. I work at Aker road before you start asking questions..
Iwofe road was a single narrow road. Amaechi's govt demolished with compensation all the houses along d existing narrow word. He excavated the top soil upto 2meters and refilled with sharp sand. Completed the underground drainage, completed side walks, completed the dual carriage center divider with complete street lighting. Completed leveling and filled with granite aggregate. Started the asphalting from wimpey junction and has completed appreciable distance.
Infact, the truth is the road was 95% completion stage as at 29th may,2015
Re: Programmes To Mark Wike's 100 Days In Office (photo) by drshrewd: 1:49pm On May 25, 2016
og2711:
What are you laughing about? Amaechi awarded the contract but did not do a single thing (rumor is that it was because wike is from that area). Wike completed that project in less than 6 months. I work at Aker road before you start asking questions..
shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked shocked

maimalari:
Iwofe road was a single narrow road. Amaechi's govt demolished with compensation all the houses along d existing narrow word. He excavated the top soil upto 2meters and refilled with sharp sand. Completed the underground drainage, completed side walks, completed the dual carriage center divider with complete street lighting. Completed leveling and filled with granite aggregate. Started the asphalting from wimpey junction and has completed appreciable distance.
Infact, the truth is the road was 95% completion stage as at 29th may,2015
grin police thank you for catching thief grin

Arker Road worker ko arkas worker ni. who dash monkey banana cheesy
come and defend yourself00000000 grin
Re: Programmes To Mark Wike's 100 Days In Office (photo) by drshrewd: 2:23pm On May 25, 2016
Demmdemm:

Wike open gutter roads is causing more havoc than good. All waters leaving this section is directed into serene estates like Tony and treasure estate within the localities kindly see what open gutter Road has caused. Wike's open gutter is going no where. The people are crying.
shocked shocked shocked shocked shocked shocked shocked shocked shocked
Re: Programmes To Mark Wike's 100 Days In Office (photo) by Nobody: 2:43pm On May 25, 2016
drshrewd:
shocked shocked shocked shocked shocked shocked shocked shocked shocked

Believe u me. Residents of these serene estates are currently crying. They intend protesting when Wike comes on Saturday to commission the open gutter debacle he placed in their localty
Re: Programmes To Mark Wike's 100 Days In Office (photo) by danasjoe1: 3:11pm On May 25, 2016
Aare2050:
seems you are not staying in Enugu state.

I'm a Yoruba boy...

but I'm currently serving in Enugu state. nsukka to be precise.
I can upload pictures of the great work the government is doing in nsukka tomorrow for you to see.

the governor is working...

unlike Mr President.

get fact before you sprew words
is Nsukka the only town or LGA in enugu?my brother he is doing that because he is an Nsukka man and he won't want his people to come after him....Ugwuanyi is a scam to enugu people
Re: Programmes To Mark Wike's 100 Days In Office (photo) by danasjoe1: 3:13pm On May 25, 2016
Innovator90:
Is there a way that the Enugu House can impeach Ugwuanyi? I can't believe Enugu people known for electing good leaders will elect this man.
Ugwuanyi is a bad product sold to the good people of enugu..he better learn from wike n others or else he should forget second term
Re: Programmes To Mark Wike's 100 Days In Office (photo) by Nobody: 11:04am On May 26, 2016
maimalari:
Iwofe road was a single narrow road. Amaechi's govt demolished with compensation all the houses along d existing narrow word. He excavated the top soil upto 2meters and refilled with sharp sand. Completed the underground drainage, completed side walks, completed the dual carriage center divider with complete street lighting. Completed leveling and filled with granite aggregate. Started the asphalting from wimpey junction and has completed appreciable distance.
Infact, the truth is the road was 95% completion stage as at 29th may,2015
Guy, stop the lies. Street lights they just mounted last week? I'm not een sure they are done with that.

Completed what side walks? The centre divider and side walk were done late last year. The only thing completed was the drainage on one side.
They had only just scraped the surface when Wike came on board.
1 2 3 Reply

Presidency Reacts To Report On Buhari Avoiding Aso-rock Office(photo)President Buhari & Aisha Laughing In His Office (Photo)President Buhari Working In His Living Room Office (Photo)234

Moment Lai Mohammed Said Atiku Will Be Questioned Over Bank PHBGoodluck Jonathan Congratulates Obaseki For Emerging Victorious In Edo ElectionAbuja Body Of Comedians Gets New Leadership As Onome Da Saint, Amb. Wahala Emerg