Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by maupe: 11:09pm On Jun 07, 2016
The Minister for Transportation, Mr. Rotimi Amaechi, Tuesday, assured Nigerians that the proposed Lagos-Ibadan segment of Lagos-Kano rail line project will be ready and operational within the next two and half years.

Also to be ready within the projected period, according to Amachi, is the Port Harcourt-Calabar rail line. Both rail lines will, daily, move thousands of passengers across the affected cities.

Amaechi, who disclosed this at a maiden lecture series, themed; “Migrating workforce: the challenges of mass transportation,” organised by the Lagos Traffic Radio (96.1 FM), at Lagos Television, LTV, ground, Ikeja, said the aim is to reduce the current pressure on road infrastructure with resultant accidents and avoidable loss of lives, properties.

The minister also directed the Railway Command of the Nigeria Police Force to stop forthwith, the practice of passengers hanging on moving trains to avoid loss of lives.

The minister said it is the responsibility of the government to protect lives of its citizens,and that it will be better to allow passengers who cannot afford the transport fare to sit in the train than for them to lose their lives.

According to the minister, the rail lines apart from easing transportation difficulties on the affected axes, will also throw up other opportunities including jobs and auxiliary services that will add to boosting the economy.

Amaechi told the audience that the federal government plans to open up the rail transportation system to the active participation of the private sector. He said a bill to realise this had been forwarded to the National Assembly and currently receiving consideration.

The minister said the plan is to ultimately ensure that the rail system takes the centre stage in the nation’s public transportation system, with the private sector playing a pivotal role, unlike in the past where this segment of transportation was the exclusive of the public sector.

According to Ameachi, there are also plans to further open up the maritime space for private sector involvement.

He disclosed that proposals had been received from entities indicating interest to ply the water transportation system, and called on the Lagos State Government to take advantage of the open window by partnering with the federal in the development of the inland waterways.

Speaking on the theme of the lecture, Amachi noted that the process of migrating workforce and people who commute from one location, area, state to another for the purpose of engaging in employment is still very difficult in the country, saying the present government is making frantic effort to make transportation easy in the country.

The minister said, “In fact, as families migrate due to employment purposes, they are compelled to move with children who require transportation to attend schools. Where transportation is lacking, the level of distress for the working parents and children becomes increased.

“Studies of the travel behaviour of the migrating workforce in the United Kingdom, UK, and US10 for example show that Migrants are concentrated in metropolitan areas where public transport provision is high.

“In the UK in particular, 40 percent of the non-EEA migrant population live in London compared to UK Nationals. Researchers in the US on the other hand reveal that migrants would prefer residential locations that are well served by public transport.

“The research further reveals that in developing countries, Migrants’ travel is strongly associated with the use of non-car-driving modes of travel, which include: public transport such as buses, trains, underground/light rail, walking, cycling and car sharing.

“Therefore, availability of efficient and affordable transportation in a location is a major consideration for the choice migrants make to look for employment and places of residence.”



According to him, as far as mass transportation is concerned, there is evidence to show that inadequacy in transport infrastructure and services had contributed significantly to the prevalence of poverty across various Nigerian communities in both urban and rural areas.

The minster explained that the problems of Nigerian transport system cut across various sub-sectors, including; air, water, rail and road transport.

Lagos State Commissioner for Transportation, Dr. Dayo Mobereola, highlighting plans by the state government to grow the sector, said an inter-modal transportation master plan is already being implemented to link the rail, road and water such that by 2032, no resident of Lagos will need to walk more than 80 kilometres from his home to board any means of transportation.

Mobereola said apart from the blue line rail ongoing on Orile-Mile 2 corridor, six other light rail systems and a monorail line had been identified, with 20 water routes, 14 Bus Rapid Transit (BRT) and 450 routes for high capacity buses, aimed at changing the face of public transportation in the megacity.

‘All these routes in water, road and rail will connect to different communities across Lagos,” said Mobereola. He added this will ensure that travel time for residents is reduced to maximum of 60 minutes from the current average of three to four hours.


http://www.vanguardngr.com/2016/06/lagos-ibadan-rail-line-ready-in-2-years-amaechi-assures/

1 Share

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by favourmic(m): 11:16pm On Jun 07, 2016
Let wait and see
Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by ganisucks(f): 11:17pm On Jun 07, 2016
Shouldn't Y̶̲̥̅̊ø̲̣̣̥ǖ have been at the all stakeholders security meeting organised by the Acting President. Or Y̶̲̥̅̊ø̲̣̣̥ǖ are no more a South-South Indigene.

1 Like

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by 989900: 11:33pm On Jun 07, 2016
This will be major . . .!

Who will want to go by road, when you can do a safer LA-IB by rail in an hour or less?

And most people I know, would rather do 4-5 hours rail to Abuja from Lagos @ N10,000-N15,000 than flying.

10 Likes 2 Shares

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by jaymejate: 11:38pm On Jun 07, 2016
Wait o, LAGOS to IBADAN as how. Are they planning to Renovate the existing track or construct another one? Cos i travel by train a lot and the line is from KANO to IBADAN, the same line goes from IBADAN to ABEOKUTA to LAGOS.

Probably that would be for UP TRAIN , LAGOS - IBADAN - KANO. But serious it won't make any difference, train time would still remain.

6 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by SuperS1Panther: 11:43pm On Jun 07, 2016
Will it still be the same 1823 locomotive train or a modern and faster train?

I hope it will be possible to make Ibadan in 10-15mts. That will be great.

7 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by obailala(m): 12:03am On Jun 08, 2016
jaymejate:
Wait o, LAGOS to IBADAN as how. Are they planning to Renovate the existing track or construct another one? Cos i travel by train a lot and the line is from KANO to IBADAN, the same line goes from IBADAN to ABEOKUTA to LAGOS.

Probably that would be for UP TRAIN , LAGOS - IBADAN - KANO. But serious it won't make any difference, train time would still remain.
The planned rail is a standard gauge rail line which can accommodate modern high speed trains; not the refurbished pre-1960 narrow gauge line which you are presently riding on now which can only support slow trains.

If the present government can achieve just this, then it will be a nice achievement.

31 Likes 5 Shares

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by jaymejate: 12:05am On Jun 08, 2016
obailala:
The planned rail is a standard gauge rail line which can accommodate modern high speed trains; not the refurbished pre-1960 narrow gauge line which you are presently riding on now which can only support slow trains.

Okay then. Nice one

2 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Nobody: 12:19am On Jun 08, 2016
This project might just be the one to take Oyo and Ibadan in particular to the promise land

Soo much potentials

5 Likes 1 Share

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by rolchi(m): 12:28am On Jun 08, 2016
It will take more than 2.5 years to build a PHC/Calabar Rail Line!

1 Like

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Nobody: 5:05am On Jun 08, 2016
Nice one
Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by aminho(m): 5:18am On Jun 08, 2016
ganisucks:
Shouldn't Y̶̲̥̅̊ø̲̣̣̥ǖ have been at the all stakeholders security meeting organised by the Acting President. Or Y̶̲̥̅̊ø̲̣̣̥ǖ are no more a South-South Indigene.
madam with due respect i always like what you are writing but the characters are really irritating.the fact is its childish

15 Likes 6 Shares

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by DaBullIT(m): 6:44am On Jun 08, 2016
All before 2019


People will beg APC to remain in power


Quote me in 2019

2 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by naijaboy756: 6:54am On Jun 08, 2016
DaBullIT:
All before 2019


People will beg APC to remain in power


Quote me in 2019
I pity for you. Using the last strength remaining to blindly re-assure

10 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by greatiyk4u(m): 6:56am On Jun 08, 2016
ganisucks:
Shouldn't Y̶̲̥̅̊ø̲̣̣̥ǖ have been at the all stakeholders security meeting organised by the Acting President. Or Y̶̲̥̅̊ø̲̣̣̥ǖ are no more a South-South Indigene.

That one no concern him ministry, he is doing his job!

5 Likes 2 Shares

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Rose2014: 6:57am On Jun 08, 2016
To Campaign no de tire APC grin
Even after one year in office

11 Likes 2 Shares

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Wildrage: 7:10am On Jun 08, 2016
Amaechi should just deliver without making stupid promises of deadlines. How can someone who could not deliver 3km of rail in 8yrs be shamelessly giving deadline of 2yrs for 100km rail

10 Likes 2 Shares

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by hub5hour: 8:26am On Jun 08, 2016
This will be major . .

1 Like

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by allanphash7(m): 8:26am On Jun 08, 2016
I dont just trust Nigeria Politician

2 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by tscoff(f): 8:26am On Jun 08, 2016
Make sure to use fast modern trains like you promised
Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Firefire(m): 8:28am On Jun 08, 2016
Very Good. (VG)
Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by chimah3(m): 8:30am On Jun 08, 2016
A thief is a thief!!!

3 Likes 1 Share

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by OneManLegion(m): 8:30am On Jun 08, 2016
The first two years of Lincoln's leadership were extremely hard times; the US was being routed by the confederates and the US fell from one economic woe to another.

But Lincoln had nothing if he didn't have resolve. He rose above the challenges and today, he's known as the greatest president US has ever produced.

He was also mocked when his administration was yet in its nascence.




Do you see the similarities between Lincoln and Buhari and the US of then and the Nigeria of now?

9 Likes 1 Share

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Ijaya123: 8:33am On Jun 08, 2016
ganisucks:
Shouldn't Y̶̲̥̅̊ø̲̣̣̥ǖ have been at the all stakeholders security meeting organised by the Acting President. Or Y̶̲̥̅̊ø̲̣̣̥ǖ are no more a South-South Indigene.

His portfolio is now at the federal level. Not regional again.

2 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Feranchek(m): 8:40am On Jun 08, 2016
Talk is cheap
Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Nobody: 8:40am On Jun 08, 2016
quemod:
I can beat my chest anywhere and say this is another Goodluck Ebele Azikiwe Nnasari Jonathan initiative.

Everything was thought of by Jonathan. He was a genius extraordinaire exceeding Einstein by a long chalk. For the next 100 years generations yet unborn will sing his name every morning before having their bath.

I completely agree with you.

3 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by TomjoTM(m): 8:46am On Jun 08, 2016
quemod:
I can beat my chest anywhere and say this is another Goodluck Ebele Azikiwe Nnasari Jonathan initiative.
whether it be Jonathan's initiative or heck it might even be ooni's initiative, so far it's development and it affects our lives, we should support not start ascribing names to it. Let's start changing that mindset. God bless Nigeria.

6 Likes 1 Share

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by gloryman91: 8:48am On Jun 08, 2016
These man should just bring all traffic agencies under his ministry this month.
Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by Google63(m): 8:48am On Jun 08, 2016
greenpasture:


Everything was thought of by Jonathan. He was a genius extraordinaire exceeding Einstein by a long chalk. For the next 100 years generations yet unborn will sing his name every morning before having their bath.

I completely agree with you.
Your sense of humour and sarcasm is out of this world.

10 Likes

Re: Lagos-ibadan Rail Line Ready In 2 Years, Amaechi Assures by agitator: 8:48am On Jun 08, 2016
ok na grin grin grin

rolchi:
It will take more than 2.5 years to build a PHC/Calabar Rail Line!

Wildrage:
Amaechi should just deliver without making stupid promises of deadlines. How can someone who could not deliver 3km of rail in 8yrs be shamelessly giving deadline of 2yrs for 100km rail

What do you expect from APC? They know their supporters are zombies and will like to hear and mastbate over such news. It keeps them happy in these trying times.

I am still imagining how Calabar-Lagos rail line can be completed within two years. They have not started compensation, preliminary survey works, etc and here is somebody mentioning 2-years delivery period, for their supporters to gloat about.

Several posters on nairaland before the elections analysed why it will not be possible to pay jobless youths N5k, and also provide free feeding for school children but same supporters used their abracadabra economics to explain how it will be possible. Now they are all disappointed but the die-hard supporters always put a spin to explain it.

You can see them dancing on another impossible promise. undecided undecided undecided

2 Likes

(1) (2) (Reply)

Dependant Visa Application In The UK / Lagos Council To Roll Out 200 Electric Mini Cabs In March / Norway Admission And Free Tuition Fees

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)