Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,601 members, 7,812,969 topics. Date: Tuesday, 30 April 2024 at 12:17 AM

How To Calculate Materials Needed For German Floor - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / How To Calculate Materials Needed For German Floor (52491 Views)

How Much Will Cost To Do German Floor In Itire Surulere / Pls What Is The Minimum Height Of Oversite Concrete(german Floor)? (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: How To Calculate Materials Needed For German Floor by HRich(m): 7:52am On Feb 26, 2017
3JLKQSM sad3JLKQSM
Re: How To Calculate Materials Needed For German Floor by money121(m): 7:54am On Feb 26, 2017
Nice one the Mod just have time to push it on front-page when egunmogaji himself don complete the project since...
Mod you no try at all... 2yrs old thread.. Not nice...


Call/WhatsApp 080-85-310-359 for your Roofing sheet

Or check current price here >> Current Price of Roofing Sheet in Nigeria.. See here >> https://www.nairaland.com/3364135/roofing-sheets-cost-various-types

1 Like

Re: How To Calculate Materials Needed For German Floor by AngelicBeing: 7:58am On Feb 26, 2017
smiley
Re: How To Calculate Materials Needed For German Floor by MMMscam: 8:05am On Feb 26, 2017
Can a builder give me a current estimate of building a 3 bedroom bungalow on a standard plot at Epe?
Re: How To Calculate Materials Needed For German Floor by saydfact(m): 8:10am On Feb 26, 2017
EgunMogaji:
Assuming a height of 4 inches.

The perimeter is 50 feet by 80 feet but there is 33 feet by 14'6" that will not have a german floor on it right in the center.

I want to know how many tons of granite, sharp sand or stone dust (undecided yet) and cement I will need. I will be using a concrete mixer (would love to hire KolaShangs mixer but only if it will come with a specific Engineer to make sure that we don't break it grin ).

Thanks.

I've done that calculation and breakdown for public consumption on the thread shown on my signature.. I'm lazy to recalculate it now... Check it out but if u still need help... . Quote me on this thread.. . I'll find time to.
Re: How To Calculate Materials Needed For German Floor by otohiba: 8:13am On Feb 26, 2017
There is nothing like German floor ask for flooring
Re: How To Calculate Materials Needed For German Floor by saydfact(m): 8:15am On Feb 26, 2017
MMMscam:
Can a builder give me a current estimate of building a 3 bedroom bungalow on a standard plot at Epe?

Varies... depending on your design..
But the major cost are Foundation about 600k
Windows and doors (with current market price) about 1m-1.5m
Roofing (depending on on your choice of roofing material) about 800k - 1.5m
Electrical and plumbing - 750k - more
Tiling about depending on ur pick 500k or more
Plastering, painting.. .. ... There's a lot to be estimated thou.
Re: How To Calculate Materials Needed For German Floor by 2tundeay(m): 8:17am On Feb 26, 2017
EgunMogaji:
Assuming a height of 4 inches.

The perimeter is 50 feet by 80 feet but there is 33 feet by 14'6" that will not have a german floor on it right in the center.

I want to know how many tons of granite, sharp sand or stone dust (undecided yet) and cement I will need. I will be using a concrete mixer (would love to hire KolaShangs mixer but only if it will come with a specific Engineer to make sure that we don't break it grin ).

Thanks.

Consult the QS.
Re: How To Calculate Materials Needed For German Floor by saydfact(m): 8:26am On Feb 26, 2017
sigmundfreud:
Abeg any info on the current workmanship cost for German floor?

Roughly 2500 per m3... The more, the more discount you remove.., practical only when u doing big works ie u can't use it for small task like columns etc.
Re: How To Calculate Materials Needed For German Floor by MMMscam: 8:27am On Feb 26, 2017
saydfact:


Varies... depending on your design..
But the major cost are Foundation about 600k
Windows and doors (with current market price) about 1m-1.5m
Roofing (depending on on your choice of roofing material) about 800k - 1.5m
Electrical and plumbing - 750k - more
Tiling about depending on ur pick 500k or more
Plastering, painting.. .. ... There's a lot to be estimated thou.


Thank you. So essentially, your estimate is about 5m?
Re: How To Calculate Materials Needed For German Floor by saydfact(m): 8:31am On Feb 26, 2017
MMMscam:



Thank you. So essentially, your estimate is about 5m?

Cld blow beyond if your taste is expensive. .. But 5m shd do a lot or all..
Re: How To Calculate Materials Needed For German Floor by mutaalim(m): 8:54am On Feb 26, 2017
At eng mogaji I read all the comments so far how can the quantities of sand wil be more than the granite 1:2 : 4 mix?
Re: How To Calculate Materials Needed For German Floor by mutaalim(m): 9:04am On Feb 26, 2017
cement 170 bags sharp sand 40 tonnes granite 50 tonnes workmanship 100k

regards
Re: How To Calculate Materials Needed For German Floor by DeniyiBabasola(m): 9:09am On Feb 26, 2017
Concrete is base on mix ratio. For concrete floor, ratio 1:2:4 is the standard.

That's 1bag of cement, 4headpans of sharp sand, 8 headpans of granite.

The volume of concrete is 36 M cu.

Estimate 150bags of cement, 20tons of granite, 30tons of sand.

Workmanship should b about 100k.( subject to location).
Re: How To Calculate Materials Needed For German Floor by supajizy(m): 10:00am On Feb 26, 2017
brabus:
Estimating material requirement for the DPC @Sir EgunMogaji site.

I'm more comfortable using metres than feet. So, let's convert the building into metres.

Overall area of the building footprint
50' x 80' or 15m x 24m = 360m2

Overall area of the building footprint less the Courtyard
360m2 (Footprint) - 45m2 (Courtyard) = 315m2

Volume of Concrete required for the oversite
315m2 x 100mm (4in thickness) = 31.5m3

Assuming we are using 1:2:4 mix ratio



___________
Quantity of Cement required

For a 1:2:4 cement mixture, divide the volume (in this case 31.5m3) by 7 to get the resulting number of 4.5m3 of cement required for the project.

Therefore 4.5m3 / 0.035 = 128 bags of 50kg cement.

____________
Quantity of Sand required

For a 1:2:4 mix, divide the volume (in this case 31.5m3 by 7 to get 4.5m3 and multiply by 2 (which is the ratio of sand) to get 9m3 which is the quantity of sand required for the project.

To get tonnage, divide 9m3 by 0.654 which gives about 15tons. Allow for shortage, wastages while transporting/transferring sand and those sand that will be stucked in the mixer. Buy 20 full tons.

_____________
Quantity of Granite required

For a 1:2:4 mix, divide the volume (in this case 31.5m3 by 7 to get 4.5m3 and multiply by 4 (which is the ratio of sand) to get 18m3 which is the quantity of granite required for the project.

To get tonnage, divide 18m3 by 0.654 which gives about 28tons of granite. Buy 30 tons!


________
Oga, Abeg no ask me how I got this figures o! Head nearly blow to work this out. With 1:3:6, you'll use less quantity of cement (90 bags or thereabout). The same quantity of sand/granite should work.
Please are you a builder or a QS. We can't keep giving out free professional advise you are Killing the profession.

2 Likes

Re: How To Calculate Materials Needed For German Floor by Eyewonda: 10:42am On Feb 26, 2017
supajizy:
Please are you a builder or a QS. We can't keep giving out free professional advise you are Killing the profession.

Very correct! How can you render professional service on social media without benefits. Doctors would rather give basic info and advise you to consult your doctor for more. Tomorrow you will complain that the proffesion is not paying.

2 Likes

Re: How To Calculate Materials Needed For German Floor by k199192: 10:53am On Feb 26, 2017
supajizy:
Please are you a builder or a QS. We can't keep giving out free professional advise you are Killing the profession.
typical black man.. An advise can't kill your profession except you don't know your job..

8 Likes

Re: How To Calculate Materials Needed For German Floor by k199192: 10:57am On Feb 26, 2017
Eyewonda:


Very correct! How can you render professional service on social media without benefits. Doctors would rather give basic info and advise you to consult your doctor for more. Tomorrow you will complain that the proffesion is not paying.
not true at all... Go online YouTube and see how many surgeries are recorded there... How many things one can learn on YouTube and you see that our black skin is the problem we have... How can a useful advise kill an entire profession... Think..! Black man..! think..!

5 Likes

Re: How To Calculate Materials Needed For German Floor by Damikyla(m): 11:02am On Feb 26, 2017
Flourish Royal Garden Estate located at okunfolu just 2min from the LA campaign tropicana Resort Beach @ibeju lekki Lagos
This estate was selling for 700k per plot with a promo of buy 5 plot and get 1 free some weeks ago.
Now it's 850k per plot....... Buy now before it's 1m per plot, save your money wisely in landed properties..... It's never depreciate
Call Michael for inspection and more information
+2348063067857
Re: How To Calculate Materials Needed For German Floor by tushbobo(m): 11:09am On Feb 26, 2017
supajizy:
Please are you a builder or a QS. We can't keep giving out free professional advise you are Killing the profession.

Sometimes you need to give free stuff to create value for your profession. People pay for value and if they do not understand your job,role or value you add to their life, you wouldn't get paid.
People are wired not to pay for what they do not understand. Hence explaining a little detail is very good.

4 Likes

Re: How To Calculate Materials Needed For German Floor by Nobody: 1:30pm On Feb 26, 2017
2tundeay:


Consult the QS.

Not on my site. A QS is a total waste on a small private build.

1 Like

Re: How To Calculate Materials Needed For German Floor by Nobody: 1:30pm On Feb 26, 2017
tushbobo:


Sometimes you need to give free stuff to create value for your profession. People pay for value and if they do not understand your job,role or value you add to their life, you wouldn't get paid.
People are wired not to pay for what they do not understand. Hence explaining a little detail is very good.

Bravo.

3 Likes

Re: How To Calculate Materials Needed For German Floor by Nobody: 1:31pm On Feb 26, 2017
k199192:
not true at all... Go online YouTube and see how many surgeries are recorded there... How many things one can learn on YouTube and you see that our black skin is the problem we have... How can a useful advise kill an entire profession... Think..! Black man..! think..!

You get it Sir.

Well done.

1 Like

Re: How To Calculate Materials Needed For German Floor by Nobody: 1:32pm On Feb 26, 2017
k199192:
typical black man.. An advise can't kill your profession except you don't know your job..

Very true.

Only hungry quacks will be intimidated.

2 Likes

Re: How To Calculate Materials Needed For German Floor by Nobody: 1:38pm On Feb 26, 2017
PqsMike:


Assist! Assist! Assist!...

Haba...some people actually went to school to study all this. Its like telling a Mechanic to assist you in fixing your car engine. Indirectly, we'll be killing this profession. Why not pay for the service of a Quantity Surveyor.

Meanwhile, for someone to assist you.. you'll need to provide the grade of the concrete.


Because I consider the services of a QS a waste on a small private build. No QS is forced to respond.
Re: How To Calculate Materials Needed For German Floor by usclem: 2:22pm On Feb 26, 2017
EgunMogaji:
Assuming a height of 4 inches.

The perimeter is 50 feet by 80 feet but there is 33 feet by 14'6" that will not have a german floor on it right in the center.

I want to know how many tons of granite, sharp sand or stone dust (undecided yet) and cement I will need. I will be using a concrete mixer (would love to hire KolaShangs mixer but only if it will come with a specific Engineer to make sure that we don't break it grin ).

Thanks.
Re: How To Calculate Materials Needed For German Floor by NoRetreat(m): 2:30pm On Feb 26, 2017
Somebody charge me 2m for the foundation without yhe filling at Shagotedo Area of Ajah. I hope he is not ripping me off?
Re: How To Calculate Materials Needed For German Floor by Nobody: 2:39pm On Feb 26, 2017
NoRetreat:
Somebody charge me 2m for the foundation without yhe filling at Shagotedo Area of Ajah. I hope he is not ripping me off?

It depends on the size of the foundation really. But that's still a shitload of money.
Re: How To Calculate Materials Needed For German Floor by usclem: 2:45pm On Feb 26, 2017
Assuming you are going for a concrete mix of 1:4:5, you will require 133bags of cement, 20 tonnes of sand and 40 tonnes of granite or any other durable coarse aggregate of your choice.
Re: How To Calculate Materials Needed For German Floor by breezeng: 2:46pm On Feb 26, 2017
There is nothing like German floor my brother. It is called oversite concrete. Convert your imperial measurement to metric to make it easy. Oversite concrete only have thickness which u referred to as height. Remove d area of d void space from d total area and multiply by thickness to get d volume of your concrete. From there u can get quantities of materials depending on your mix ratio.

1 Like

Re: How To Calculate Materials Needed For German Floor by usclem: 2:52pm On Feb 26, 2017
Assuming you are going for a concrete mix of 1:4:5, you will require 133bags of cement, 20 tonnes of sand and 40 tonnes of granite or any other durable coarse aggregate of your choice
Re: How To Calculate Materials Needed For German Floor by Nobody: 3:03pm On Feb 26, 2017
For those that might have missed it, this is an old thread.

The german floor (local terminology) was completed successfully.

Pic #1 The completed german floor. As expected but still shocking not to see a finished floor like we have here in the US.
Pic #2 The building at lintel level and ready for roofing.
Pic #3 The space in the middle for the ~500 square feet open courtyard.

Thanks to all contributors.

1 Like

(1) (2) (3) (Reply)

Story Of A 500-room House In Lagos Where Tenants Live As Prisoners (PICTURES) / These Are Stages Involved In Building A House / Neighbours Fight In Akwa-Ibom Because Of N300 Borehole Levy (photos)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 42
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.