Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,355 members, 7,808,241 topics. Date: Thursday, 25 April 2024 at 09:15 AM

Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria (43981 Views)

Angry Youths Shut Afam Power Station, Throw Rivers Into Darkness / Photos From 240MW Afam Power Plant Constructed By Buhari In Rivers State / See 40MW Kashimbila Hydro Power Dam In Taraba Delivered As Promised By Buhari (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by presidency: 3:10pm On Jul 06, 2017
These are three of the new power plants/capacity that will become operational in Nigeria in 2017 and 2018

12 Likes 3 Shares

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by EVarn(m): 3:15pm On Jul 06, 2017
How do we plan on improving on transmission and distribution?,I think those are the critical issues on ground.

61 Likes 4 Shares

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by ugosonics: 6:16pm On Jul 07, 2017
Ok oo

Check my signature for cheap internet data plan

3 Likes 1 Share

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by happney65: 6:16pm On Jul 07, 2017
In a country of almost 200Million People we are celebrating 320 MW..Isoriat.I made third to comment after many years...Na sign say i go see the murdafuckerrr wey i wan arrest,i go see am arrest tonight..Egberun saamu e ko li sa mo olorun lowo.. grin grin

38 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by ChiefSweetus: 6:17pm On Jul 07, 2017
280MW addition to the grid in THREE YEARS.

LMAO! grin grin grin

Fashola is a smello who couldn't fix Ago Palace Way in 8yrs. 280MW in 4yrs is what a province in Beinjin or Tianjin will achieve in 6-months I put that on my ex's life!!

Bloody jokers. I bet they don't even have a viable pipeline or GSPA in place. The Discos are moribund. Ikeja Disco hasn't given anyone power in EIGHT FUCĶING DAYS! And Fashola is forming technocrat in Abuja after leaving a 4km stretch of road for 8yrs because it's not Alimosho or because they are predominantly 5-percenters. But if na to follow nack Matharoo sisters....... undecided

99 Likes 8 Shares

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Fadman4real(m): 6:17pm On Jul 07, 2017
That's a little impressive

2 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by rayblings(m): 6:17pm On Jul 07, 2017
She she she shame

15 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Kenbubble(m): 6:17pm On Jul 07, 2017
Late comers

2 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by dolphinife: 6:18pm On Jul 07, 2017
It belong to GEj.....fashola shouldn't claim it......


















Waiting for some idiots to come make that claim

17 Likes 3 Shares

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Mrkumareze(m): 6:18pm On Jul 07, 2017
Poor distribution and inadequate equipment

3 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by tainot2002(m): 6:18pm On Jul 07, 2017
God Bless PMB


God Bless Osinbajo


God Bless Fashola


God Bless Federal Republic of Nigeria

51 Likes 4 Shares

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by livinus009(m): 6:18pm On Jul 07, 2017
Joke!!

5 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by etzskillz(m): 6:18pm On Jul 07, 2017
that doesn't mean NEPA will give us light 12hrs/day

4 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by SIRKAY98(m): 6:18pm On Jul 07, 2017
;DWhat of Khishiro plant?

2 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by nairaman66(m): 6:18pm On Jul 07, 2017
Is this the reason there has been no power at all?? Just an excuse for fashola..

4 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by NobleAngell(f): 6:19pm On Jul 07, 2017
Well, even though we are where we should have been 20years ago, at least we are crawling. Nice one!

3 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Nobody: 6:19pm On Jul 07, 2017
grin grin grin grin

Nigeria needs at least 40-50GW of power to revive the power sector una dey "plan" 5-15GW of which we are stuck at 5-6GW on a good day please, take this irrelevant posts to Ebutemeta.

20 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Nobody: 6:19pm On Jul 07, 2017
Speaking from my personal view. The light in my area is really improved now

Fashola is really trying

3 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Proudlyngwa(m): 6:20pm On Jul 07, 2017
Until we start thinking smaller, we won't make any headway,.
We have a long way to go in the power sector,

4 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Nobody: 6:20pm On Jul 07, 2017
APC will now want to take glory. These projects were started by Yaradua/GEJ. Let me hear what they have to say.

16 Likes 2 Shares

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by mannatech: 6:20pm On Jul 07, 2017
Click like if you actually clicked to see a almost completed power plant and was disappointed with this nonsense graph

Na graph go supply us the megawatts

8 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Benwems(m): 6:20pm On Jul 07, 2017
just additional 320MEGAWATTS. lol.... Is that the 20,000MG apc promised us?

4 Likes 1 Share

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by arthurous(m): 6:21pm On Jul 07, 2017
Nothing new is not yet working and they have started to announce it with out any date it will commence operation. Forget English what every Nigerian want is light at home and constant light

2 Likes 1 Share

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by 989900: 6:21pm On Jul 07, 2017
Fashola would deliver on power if supported.

There are more than these:

“The Afam 5 plant is currently being rehabilitated in collaboration with General Electric to restore 240 megawatts to the facility.

“All the turbine and equipment needed for the project are already in the country while the only challenge we are facing is the access road, logistic and few other things that we came to assess.

We think that we will add 240 megawatts and another 100 megawatts before December with addition of 276 megawatts in 2018 from Afam power plant alone,” he said.


What’s being done to achieve incremental power? With provision of funds and determination to fulfill the promises made at the media briefing on incremental power, resuscitation of the 29 MW DadinKowa hydro-power plant in Gombe state should be completed in November, [/b]going by the assurance given to the Minister in March this year, by the project manager. The 132KV lines to evacuate the power are in place. The [b]40 MW Gurara power station is expected to finish in the first quarter of next year and with the arrival of its standardisation equipment, the 10MW Katsina wind mill is expected to finish before quarter two. The diesel and gas dual fired 215MW power plant in Kaduna is also expected to finish this year. There is also another power emergency project that President Buhari approved for General Electric to give 240MW of power in Afam, Rivers state. It is also expected to finish this year. The 40 MW Kashimbilla hydro power plant, in Taraba state, has been revived and now 99% completed . The works on the evacuation of power including transmission lines, switch yards and substations from the power plant to Takum , Wukari and the existing substation in Yandev is expected to be completed by the second quarter of 2018 subject to availability of funds.


Work has resumed on the 700MW Zungeru hydroelectric power plant in Niger State, which was stalled by litigation for over three years .The nation moves closer to achieving power security with more alternatives to gas fired plants. Work on the 450MW Azura power plant in Benin, was also stalled because the approvals and agreements required by the private companies to source for funds could not be signed for more than one year. President Buhari finally signed the required on assumption of office and this enabled the investors to commence construction. So also, the mambilla hydro plant, which had been on the drawing board long before the coming of this government. The minister in an interview with the Daily Trust last week explained that significant progress had been made in terms of project planning by working with various stakeholders and with a “no objection “ certificate secured from the Bureau of Public Procurement on Monday 19th June ,work is set to commence on this long drawn yet all important project.
Electricity Regulation Commission (NERC) and the Rural Electrification Agency board on the governance side as well as the NBET’s N701 billion two-year payment assurance guarantee approved to ensure that all those who generate power to the grid are paid . The minister has, in exercise of his powers under section 27 of the Electric Power Sector Reform Act 2005 directed NERC to permit four categories of customers to buy power directly from a licensee other than their electricity distribution companies, once they are dissatisfied with the performance of the latter. As Fashola puts it, “it is like going to Nestle to get your products directly instead of waiting for the distributor.

There is also a five-year plan to boost power transmission capacity to 20,000MW beginning from 5,500MW to 10,000MW in the next three years. The plan targets transmission capacity of 8,200MW by 2018 and 10,000MW by 2019. To achieve this, the federal government is working on actual numbers of transmission towers that would take the nation from 7,000MW to 20,000MW in each growth plan; how many kilometers of cables, wires, breakers and tons of steel would be required in each stage as well as securing right of ways, settle compensation issues and every other issue that could possibly impede the implementation plan. Meanwhile, 59 expansion projects are currently being worked on across the country. The various transmission projects under the National Integrated Power Project (NIPP) are also being completed.


The positives are, if we had this kind of momentum in the past 10-15 years or more, power outages would have been a very rare occurrence in Nigeria.

13 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by lionness(f): 6:21pm On Jul 07, 2017
In as much as some babies of bitterness pray the Buhari government failed, and how much they passionately wish BRF should fail, the power situtation is getting better and better, although i wish Fash could solely focus on roads, and housing alone, and leave power to someone more qualified and determined. Did you all notice that the only Minister in this government that is working is ONLY fashola? The rest are as dead as the pressy.

10 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Proudlyngwa(m): 6:21pm On Jul 07, 2017
happney65:
In a country of almost 200Million People we are celebrating 320 MW..Isoriat.I made third to comment after many years...Na sign say i go see the murdafuckerrr wey i wan arrest,i go see am arrest tonight..Egberun saamu e ko li sa mo olorun lowo.. grin grin
Celebrating 300mw is not the issue.
The issue is the 300mw is set up wrongly.

3 Likes

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by SageTravels: 6:22pm On Jul 07, 2017
We should see pictures

1 Like

Re: Afam Power Plant, Kashimbila & Gurara Hydro Plants To Operate In Nigeria by Alphacom(f): 6:24pm On Jul 07, 2017
EVarn:
How do we plan on improving on transmission and distribution?,I think those are the critical issues on ground.
I think Generation is the main thing. How will you transmit and distribute what u don"t have.

3 Likes

(1) (2) (3) (4) (5) (6) (Reply)

Obasanjo ‘Outpaces’ Participants At Health Walk (Photo) / Obasanjo Tipped David Umahi As Next Igbo President / Kidnapped Lawmaker’s Daughter Jessica Edionwele Found With Lover - ThisDay

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.