₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,155 members, 8,420,593 topics. Date: Friday, 05 June 2026 at 06:15 AM

Toggle theme

Anambra Residents Commend Buhari On 2nd Niger Bridge - Politics (4) - Nairaland

Nairaland ForumNairaland GeneralPoliticsAnambra Residents Commend Buhari On 2nd Niger Bridge (35054 Views)

1 2 3 4 5 Reply (Go Down)

Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by yahmohy27: 3:01pm On Feb 01, 2018
ettybaba:
Buhari has lost my vote as long as the killings by the state sponsored terrorists (Fulani herdsmen) continues.
Don't worry by God's grace everything will soon be normal
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by yahmohy27: 3:04pm On Feb 01, 2018
sarrki:
Woe onto those that lied to us that 2nd bridge has been completed

Woe onto those that hates this man coz of religion, tribalism and ethnicity

Woe onto anyone that follow this road and still insult him

I want a advanced wailer to come forward and tell us what GEJ and PDP did for southeast to warrant that massive support ?

Aside hatred for the incorruptible president

Pmb fire from all cylinders

We gat your back
I dey gbadun you,bros.
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by tall2ce(m): 3:05pm On Feb 01, 2018
sarrki:
Gej knows how to toy with some peoples brain

How on earth will a geography class turns to bridge construction?

For the records that picture you showed above is geography lecture
Tell me how much you are paid to advertise this administration
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Xtopher123(m): 3:07pm On Feb 01, 2018
sarrki:
Why are you so comfortable to lie at will
You're Just Being a Shithole... Your Future was already sabotaged 3yrs ago so no need arguing with your likes...

Nigerians have moved on... We refuse to be taken backward...
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by dheilaw1(m): 3:12pm On Feb 01, 2018
hammer6F:
JUST IMAGINE, A PROJECT WAS STOPPED BY BUHARI IN 2015, CLAIMING HE WANT TO COMPENSATE LOCALS.


IF YOU READ THE ARTICLE, LOCALS ARE STILL NOT COMPENSATED


NOW HE IS RESTARTING GEJ ONGOING PROJECTS AND WANT PRAISE FOR CONTINUING A PROJECT THAT HE STOPPED.


IS BUHARI MAD?

Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Handsomecole(m): 3:29pm On Feb 01, 2018
Talk is cheap, to castigate is easy, propaganda will rise, to Join th insult band wagon is easy , but Buhari has demonstrated that he truly loves the Igbos. He has my vote come 2019 not even the bad wagon of looters called coalition can convince me.
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by juszoe82: 4:05pm On Feb 01, 2018
Fools will commends him. why didnt he start it the period he assumed office. He is doing it because election is around the corner and some fools will applaud for that. Again why did he cancel it after the formal administration awarded the contract. All the rubbish buhari is doing lately is all for election. My people perished because of lack of knowledge.
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Mhiztamurtala(m): 4:12pm On Feb 01, 2018
Ever8054:
he should start 3rd Niger bridge and finish in one week,his silence on the killings of innocent people by his kinsmen is enough to send him back to daura.....
just keep wailing ,i see no candidate beating buhari comes 2019.. #PMB 2023
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by sarrki(op): 4:24pm On Feb 01, 2018
yahmohy27:
I dey gbadun you,bros.
You Are a patriot
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by sarrki(op): 4:27pm On Feb 01, 2018
kernel504:
My brother it has never been said that second Niger bridge at any point was completed. In fact, Jonathan just did 10%, I heard him say that.

I can tell you second Niger bridge is a campaign promise, just like cleaning of oil spillage in Ogoni.
My brother

I will personally campaigned against them come October if 2nd Niger bridge is not delivered
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by colli247(m): 4:29pm On Feb 01, 2018
sarrki:
Some residents of Anambra State have commended President Muhammadu Buhari for ensuring the commencement of work at the Second Niger Bridge. Some of the residents told the News Agency of Nigeria (NAN) in separate interviews yesterday, that the president’s fulfillment of his promise indicated that it was dear to his heart. NAN reports that the idea of the Second Niger Bridge, awarded to Julius Berger Nig. Ltd, was envisaged to reduce the load and pressure on the existing Niger Bridge.

A correspondent of NAN, who visited the project site to ascertain the level of work done, reports that some workers were seen operating a gigantic equipment used for piling. In his reaction, Prof. Dennis Aribodo of the Department of Public Health Parasitology, NnamdiAzikiwe University, Awka, described the bridge as a “necessary link to promote the economy of the country.” “The bridge invariably serves as an alternative if anything happens to old Niger Bridge.

It is an important economic project of huge benefit to the country,” he said. Aribodo stressed the need for proper supervision of the project to ensure that work was carried out to specification. Also, MrsAnthoniaUdem, a food vendor close to the project site, who expressed happiness over the project; however, decried the slow pace of work by the construction company.

Udem described the attitude of the construction firm as “419” (fraud). “I am happy about the work, just that these people want to play us 419 again. I say so because this work is supposed to be ready by now but they will work today and tomorrow they won’t work. “I want government to execute the project fast so that the bridge will be useful to us and everybody will be happy,” Udem said. On his part, MrChukwuemekaOkonkwo, a sand excavator near the project site, also decried the slow pace of work at the Bridge.

Okonkwo said based on the importance of this project, the work should be carried out both day and night to ensure early completion. “The federal government should provide the necessary logistics like money because when you mobilize and give them enough money, they will get more equipment and labour,” Okonkwo said. However, a top official of Julius Berger Nig. Plc, who pleaded anonymity, said work resumed fully at the site in November 2017.

According to the source, the community cannot dictate the pace of work. “Julius Berger has a peculiar way of working on site. Currently, we are doing mostly piling now on ground after the one done in the water. We have equally finished the piling on the Asaba side. “What we are doing now is what we call early works four, which means we have done that of one to three and these are preparation for the major work to begin. “Early works four will be completed by June or July for the major work to commence. “From what the Federal Ministry of Works has told us, there will be no stoppage until work is completed; meaning, funding will not interrupt the project or slow it down,” the source said. However, the source said the issue of compensation on affected communities cropped up occasionally, noting however, that the Federal Ministry of Works had equally promised to resolve the issue

https://leadership.ng/2018/01/30/second-niger-bridge-anambra-residents-commend-pmb/
OP picture of the 2nd niger bridge OP ANOTHER CAMPAIGN SCAM
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by colli247(m): 4:30pm On Feb 01, 2018
sarrki:
My brother

I will personally campaigned against them come October if 2nd Niger bridge is not delivered
OP picture of the 2nd niger bridge OP ANOTHER CAMPAIGN SCAM
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by colli247(m): 4:31pm On Feb 01, 2018
[quote author=dheilaw1 post=64696713][/quote]OP picture of the 2nd niger bridge OP ANOTHER CAMPAIGN SCAM
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by colli247(m): 4:32pm On Feb 01, 2018
yahmohy27:
Don't worry by God's grace everything will soon be normal
PLEASE OP picture of the 2nd niger bridge OP ANOTHER CAMPAIGN SCAM
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by waveman2: 4:38pm On Feb 01, 2018
Always trying to deceive the gullible masses. It's only election time you see them working. We don get sense.


Likei:
They want to use the project to campaign for 2019 elections.
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by waveman2: 4:42pm On Feb 01, 2018
Are you an engineer. What makes you feel the bridge will be completed by October. My bro that bridge will not be complete by next year even with prompt and adequate funding which you and I know it will not be possible.


sarrki:
My brother

I will personally campaigned against them come October if 2nd Niger bridge is not delivered
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by kernel504(m): 4:45pm On Feb 01, 2018
sarrki:
My brother

I will personally campaigned against them come October if 2nd Niger bridge is not delivered
Hahahah... I will remind you my brother, when the time is reap, do have a blissful day.
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by kayfra: 4:48pm On Feb 01, 2018
12submarine:
Keep quiet if you don't have anything to say. Some of you are the reasons Igbos are getting insulted. He should abandon the uncompleted bridge and start another one, is that what you are saying? I detest Buhari’s administration, but this your comment is damn embarrassing. I thought it was argued sometimes back that resumption of work at the 2nd Niger bridge is just a gimmick. Which one is 3rd Niger bridge again you are talking about? If you don't have anything you better keep quiet and stop embarrassing everybody here.
Brutal grin
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Deadlytruth(m): 4:49pm On Feb 01, 2018
hammer6F:
THE MISTAKE U PEOPLE MAKE IS FAILING TO KNOW THAT IGBOS DONT FORGET ANYTHING.
I am at loss as to exactly what you mean by "Igbos don't forget anything". If the meaning of "forget" has not changed, then Igbos remain the most forgetful Nigerians. Evidences as below:
1. After Igbos were slaughtered in thousands by Hausa-Fulanis in 1945 (Jos) and 1953 (Kano), Igbos decided at independence to align with the same Northernes in a manner that gave power to Hausa-Fulanis over Nigeria.
2. After being hounded and nearly killed by Hausa-Fulanis who chased him into exile in Abidjan, Ojukwu returned to Nigeria and joined the Hausa-Fulanis' party NPN.
3. After all that the North-East alliance of 1959/1960 cost Igbos in terms of innocent lives and marginalization, Igbos went into a North-East alliance again in 1979.
And lots more.
So how exactly did you arrive at your verdict that Igbos don't forget anything despite historical facts saying otherwise?
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Lanca: 4:50pm On Feb 01, 2018
Can we see d 2nd Niger Bridge �?
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by mechanics(m): 5:09pm On Feb 01, 2018
They should allow the construction company do their work, I know they won't do a shabby work, meanwhile a photo of the work should have been attached.
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by valentineuwakwe(m): 5:32pm On Feb 01, 2018
work don start no mean say work don end....atleast the people of the east should pray against the abandonment of the project....
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by uniqueogo(f): 6:30pm On Feb 01, 2018
hmmmmmm
i live very close to the niger bridge and i don't see any work commencing or going on around there for the second bridge



these bloggers will not kill someone with lies
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Angelawhite(m): 6:40pm On Feb 01, 2018
sarrki:
You started by mentioning Biafra
I think he's correct about your region being terrorists... I might be wrong though lipsrsealed
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Angelawhite(m): 6:42pm On Feb 01, 2018
sarrki:
.

Am a patriot parrot
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Solumtoonna(m): 7:01pm On Feb 01, 2018
sarrki:
Some residents of Anambra State have commended President Muhammadu Buhari for ensuring the commencement of work at the Second Niger Bridge. Some of the residents told the News Agency of Nigeria (NAN) in separate interviews yesterday, that the president’s fulfillment of his promise indicated that it was dear to his heart. NAN reports that the idea of the Second Niger Bridge, awarded to Julius Berger Nig. Ltd, was envisaged to reduce the load and pressure on the existing Niger Bridge.

A correspondent of NAN, who visited the project site to ascertain the level of work done, reports that some workers were seen operating a gigantic equipment used for piling. In his reaction, Prof. Dennis Aribodo of the Department of Public Health Parasitology, NnamdiAzikiwe University, Awka, described the bridge as a “necessary link to promote the economy of the country.” “The bridge invariably serves as an alternative if anything happens to old Niger Bridge.

It is an important economic project of huge benefit to the country,” he said. Aribodo stressed the need for proper supervision of the project to ensure that work was carried out to specification. Also, MrsAnthoniaUdem, a food vendor close to the project site, who expressed happiness over the project; however, decried the slow pace of work by the construction company.

Udem described the attitude of the construction firm as “419” (fraud). “I am happy about the work, just that these people want to play us 419 again. I say so because this work is supposed to be ready by now but they will work today and tomorrow they won’t work. “I want government to execute the project fast so that the bridge will be useful to us and everybody will be happy,” Udem said. On his part, MrChukwuemekaOkonkwo, a sand excavator near the project site, also decried the slow pace of work at the Bridge.

Okonkwo said based on the importance of this project, the work should be carried out both day and night to ensure early completion. “The federal government should provide the necessary logistics like money because when you mobilize and give them enough money, they will get more equipment and labour,” Okonkwo said. However, a top official of Julius Berger Nig. Plc, who pleaded anonymity, said work resumed fully at the site in November 2017.

According to the source, the community cannot dictate the pace of work. “Julius Berger has a peculiar way of working on site. Currently, we are doing mostly piling now on ground after the one done in the water. We have equally finished the piling on the Asaba side. “What we are doing now is what we call early works four, which means we have done that of one to three and these are preparation for the major work to begin. “Early works four will be completed by June or July for the major work to commence. “From what the Federal Ministry of Works has told us, there will be no stoppage until work is completed; meaning, funding will not interrupt the project or slow it down,” the source said. However, the source said the issue of compensation on affected communities cropped up occasionally, noting however, that the Federal Ministry of Works had equally promised to resolve the issue

https://leadership.ng/2018/01/30/second-niger-bridge-anambra-residents-commend-pmb/
False news everywhere, A bu m nwa-afor Anambra, o nwe ro ife ha n' aru there... Saraki abi na Saramkpi go enter bottle
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by everozone: 8:48pm On Feb 01, 2018
sarrki:
Keep quiet

45 million vote is guaranteed 2019
Haha 45 million votes indeed.Keep dreaming.If Buhari obtains 5 million votes in the election,then he should thank his Allah.We are ready to resist rigging.
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by biztip: 9:02pm On Feb 01, 2018
which Niger bridge. is it d one I pass everyday, don't be deceived nothing is ongoing there
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by megama: 9:44pm On Feb 01, 2018
sarrki:
Some residents of Anambra State have commended President Muhammadu Buhari for ensuring the commencement of work at the Second Niger Bridge. Some of the residents told the News Agency of Nigeria (NAN) in separate interviews yesterday, that the president’s fulfillment of his promise indicated that it was dear to his heart. NAN reports that the idea of the Second Niger Bridge, awarded to Julius Berger Nig. Ltd, was envisaged to reduce the load and pressure on the existing Niger Bridge.

A correspondent of NAN, who visited the project site to ascertain the level of work done, reports that some workers were seen operating a gigantic equipment used for piling. In his reaction, Prof. Dennis Aribodo of the Department of Public Health Parasitology, NnamdiAzikiwe University, Awka, described the bridge as a “necessary link to promote the economy of the country.” “The bridge invariably serves as an alternative if anything happens to old Niger Bridge.

It is an important economic project of huge benefit to the country,” he said. Aribodo stressed the need for proper supervision of the project to ensure that work was carried out to specification. Also, MrsAnthoniaUdem, a food vendor close to the project site, who expressed happiness over the project; however, decried the slow pace of work by the construction company.

Udem described the attitude of the construction firm as “419” (fraud). “I am happy about the work, just that these people want to play us 419 again. I say so because this work is supposed to be ready by now but they will work today and tomorrow they won’t work. “I want government to execute the project fast so that the bridge will be useful to us and everybody will be happy,” Udem said. On his part, MrChukwuemekaOkonkwo, a sand excavator near the project site, also decried the slow pace of work at the Bridge.

Okonkwo said based on the importance of this project, the work should be carried out both day and night to ensure early completion. “The federal government should provide the necessary logistics like money because when you mobilize and give them enough money, they will get more equipment and labour,” Okonkwo said. However, a top official of Julius Berger Nig. Plc, who pleaded anonymity, said work resumed fully at the site in November 2017.

According to the source, the community cannot dictate the pace of work. “Julius Berger has a peculiar way of working on site. Currently, we are doing mostly piling now on ground after the one done in the water. We have equally finished the piling on the Asaba side. “What we are doing now is what we call early works four, which means we have done that of one to three and these are preparation for the major work to begin. “Early works four will be completed by June or July for the major work to commence. “From what the Federal Ministry of Works has told us, there will be no stoppage until work is completed; meaning, funding will not interrupt the project or slow it down,” the source said. However, the source said the issue of compensation on affected communities cropped up occasionally, noting however, that the Federal Ministry of Works had equally promised to resolve the issue

https://leadership.ng/2018/01/30/second-niger-bridge-anambra-residents-commend-pmb/
Pictures
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by objobj: 9:58pm On Feb 01, 2018
hammer6F:
THIS WAS ENUGU INTERNATIONAL AIRPORT UNDER CONSTRUCTION BY GEJ.
Mr man do you know what is called model in design?
Re: Anambra Residents Commend Buhari On 2nd Niger Bridge by Nobody: 10:25pm On Feb 01, 2018
sarrki:
Some residents of Anambra State have commended President Muhammadu Buhari for ensuring the commencement of work at the Second Niger Bridge. Some of the residents told the News Agency of Nigeria (NAN) in separate interviews yesterday, that the president’s fulfillment of his promise indicated that it was dear to his heart. NAN reports that the idea of the Second Niger Bridge, awarded to Julius Berger Nig. Ltd, was envisaged to reduce the load and pressure on the existing Niger Bridge.

A correspondent of NAN, who visited the project site to ascertain the level of work done, reports that some workers were seen operating a gigantic equipment used for piling. In his reaction, Prof. Dennis Aribodo of the Department of Public Health Parasitology, NnamdiAzikiwe University, Awka, described the bridge as a “necessary link to promote the economy of the country.” “The bridge invariably serves as an alternative if anything happens to old Niger Bridge.

It is an important economic project of huge benefit to the country,” he said. Aribodo stressed the need for proper supervision of the project to ensure that work was carried out to specification. Also, MrsAnthoniaUdem, a food vendor close to the project site, who expressed happiness over the project; however, decried the slow pace of work by the construction company.

Udem described the attitude of the construction firm as “419” (fraud). “I am happy about the work, just that these people want to play us 419 again. I say so because this work is supposed to be ready by now but they will work today and tomorrow they won’t work. “I want government to execute the project fast so that the bridge will be useful to us and everybody will be happy,” Udem said. On his part, MrChukwuemekaOkonkwo, a sand excavator near the project site, also decried the slow pace of work at the Bridge.

Okonkwo said based on the importance of this project, the work should be carried out both day and night to ensure early completion. “The federal government should provide the necessary logistics like money because when you mobilize and give them enough money, they will get more equipment and labour,” Okonkwo said. However, a top official of Julius Berger Nig. Plc, who pleaded anonymity, said work resumed fully at the site in November 2017.

According to the source, the community cannot dictate the pace of work. “Julius Berger has a peculiar way of working on site. Currently, we are doing mostly piling now on ground after the one done in the water. We have equally finished the piling on the Asaba side. “What we are doing now is what we call early works four, which means we have done that of one to three and these are preparation for the major work to begin. “Early works four will be completed by June or July for the major work to commence. “From what the Federal Ministry of Works has told us, there will be no stoppage until work is completed; meaning, funding will not interrupt the project or slow it down,” the source said. However, the source said the issue of compensation on affected communities cropped up occasionally, noting however, that the Federal Ministry of Works had equally promised to resolve the issue

https://leadership.ng/2018/01/30/second-niger-bridge-anambra-residents-commend-pmb/
Where is the pictures n videos of the bridge?
1 2 3 4 5 Reply

El-zakzaky: House Of Reps Commend Buhari, DSS For Obeying Court Order (video)Reconstruction Work Begins On 109 Roads In Edo As Residents Commend Gov. ObasekiOperation Python Dance: Igbos March To Aso Rock Villa To Commend Buhari234

Amaju Pinnick And Akpo Mudiaga Odje In 1993 (Throwback Photo)DSS Tries To Arrest Pastor Isa Elbuba Over His Video On Buhari, Fulani HerdsmenEl-Rufai: "Yar'adua Fought Me, He Ended Up In the Grave" (Video)