| Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by NAIJAHITPLAY(op): 10:08am On Nov 19, 2018 |
IT is disgraceful that the deadline for the completion of the Lagos-Ibadan Expressway has been shifted to 2021. Work resumed this year, but Julius Berger, the contractor handling the Lagos-Sagamu intersection end of the highway, has now dashed any hope of its completion anytime soon. Citing lack of funding and additional designs, it stated that the December 2019 completion date was no longer feasible. This is a severe blow. It betrays a spectacular lack of understanding on the dynamics that underpin a country’s socio-economic development by the Muhammadu Buhari administration. Being Nigeria’s most notable road asset, the news of the postponement for another three years is devastating for the users. With a vehicular traffic of 25,000 per hour, the Federal Road Safety Commission says it is the busiest highway in the country. Ordinarily, this pivotal element ought to have compelled the Federal Government to expedite action on its reconstruction. That it did not, portrays the government as bewildered and unable to get its priorities right. The rigmarole began in 2009, when the Umaru Yar’Adua administration concessioned the project to Bi-Courtney Highway Services. Valued then at N86.5 billion, Bi-Courtney was to build, operate and transfer to government after 25 years. With nothing concrete achieved, the Goodluck Jonathan government terminated the contract in 2012, by which time, the cost had risen to N112 billion. Oddly, that government wagged the dog on the project. The 127.6-kilometre road, now in a sorry state, was opened in 1978. Eventually, Jonathan realised his unforgivable ineptitude and inaugurated the repairs in 2013 at the cost of N167 billion, which was to be undertaken by Julius Berger and Reynolds Construction Company. He pledged that the reconstruction would last four years. As expected, the inauguration elicited optimism. But it turned out to be a mere political gambit ahead of the 2015 elections: absurdly, in the last budget of his tenure, the Federal Ministry of Works had a capital vote of only N11 billion. The unending farce has brought untold pain to those who pass through the road. The Buhari government, which succeeded Jonathan, has made efforts to complete the project, but the pace of work is too slow, owing primarily to poor funding. It allocated only N31 billion to the road in the 2017 budget. However, by then, it owed the contractors N15 billion. But even this inadequate sum was consumed by the bitter ethnic politics in the Senate. Some lawmakers mischievously argued that the road “belonged to the South-West.” Therefore, the lawmakers irresponsibly slashed the vote to N10 billion and used it to fund their corruption-driven constituency projects. The parliamentarians have continued to play petty politics with such a critical economic livewire that connects Lagos – Nigeria’s commercial hub – with other regions of the country. Although Kabiru Gaya, the Chairman of the Senate Committee on Works, pontificated about the delay when Julius Berger officials told the senators about the 2021 completion during their latest oversight visit, that trip was all about playing to the gallery. Interestingly, in the 2018 budget, the National Assembly unilaterally knocked off an aggregate of N11.5 billion from funds allocated to some capital projects, including the Lagos-Ibadan Expressway, the Second Niger Bridge and the Itakpe-Ajaokuta rail project. Consequently, there is daily gridlock on the route these days, creating chaos, helplessness and insecurity. That the government is not mindful of this mayhem and is proposing 2021 as the new completion date is baffling. Click here to read full details >>> http://www.naijahitplay.com/2018/11/disgraceful-lagos-ibadan-road.html?m=1 Indeed, Nigeria has serious infrastructural deficit.
|
| Re: Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by iammo(m): 10:11am On Nov 19, 2018 |
Saraki kept on cutting the budget for capital project, only to replace it with constituency project.... Twice, fashola wailed and yelled but now is their time to lament after PDP's serial election losses |
| Re: Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by OfficialAPCNGR: 10:19am On Nov 19, 2018 |
iammo:But saraki couldn't cut the illegal withdrawals by nnpc or the allocation by President Buhari or Acting President Osinbajo all in multiple trillions of Naira? Shut up! SARAKI IS ALSO WHY EFCC IS DEFENDING OSHIOMOLE IN THESE CORRUPTION CASES!! dutchbruv: |
| Re: Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by iammo(m): 10:23am On Nov 19, 2018 |
OfficialAPCNGR:Lol, you don't even know how government works... Goto court to seek an injunction and use the freedom of information right to understand how NNPC operates. Talk is cheap!! |
| Re: Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by OfficialAPCNGR: 10:25am On Nov 19, 2018 |
iammo:WE ARE IN COURT ALREADY TO GET OUR SHIAMAN OSHIOMOLE TO FACE JUSTICE ON CORRUPTION AND STEALING ISSUES... BUT SURPRISINGLY EFCC IS THE ONE DEFENDING OSHIOMOLE IN COURT!! Seedutchbruv: |
| Re: Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by iammo(m): 10:35am On Nov 19, 2018 |
OfficialAPCNGR:Then be civilised enough to wait for the outcome of a court rather than all this ridiculous noise making |
| Re: Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by Ovamboland(m): 10:58am On Nov 19, 2018 |
While the Saraki led Senate was playing ethnic politics and cutting funding for SW based projects, many wailers were hailing him as the best Senate president checking the executive recklessness and dictatorship. I don't know how many of them have died or got maimed for life on that critical road due to non completion. |
| Re: Disgraceful, Lagos-ibadan Road Completion Date Shifted To 2021 by Cajal(m): 11:02am On Nov 19, 2018 |
Saraki ...see ur life |