Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,479 members, 7,999,158 topics. Date: Sunday, 10 November 2024 at 07:04 PM |
Nairaland Forum / Nairaland / General / Politics / Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt (26247 Views)
DSS Arrests A Popular Pastor Who Prophesied Against Tinubu’s Incoming Govt / #EndSARS: Traffic Gridlock In Rivers As Pro-Buhari Protesters Take Over / Kwara Assembly Stops Incoming Govt. From Dissolving LG Councils (2) (3) (4)
(1) (2) (3) (4) (Reply) (Go Down)
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 10:12pm On May 22, 2019 |
anonimi: Mass communication or fabricated narratives cannot generate what you never achieved, the projects that you did not execute or complete or erase the ones that you abandoned for decades. After accumulating huge oil money for 16 years and still didn't start and complete the so-called project that was your idea while another man showed up 16 years later to start and complete it in less than 3 years with little funds and smaller budget, you are obviously incompetent. Your ideas on the railway drawing board cannot move passengers, goods and services from point A to point B unless you are competent enough to start and complete the project instead of abandoning the project. Abandoning projects meant to serve the people is not competence, it's an abdication of responsibilities and official incompetence. 3 Likes |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 10:15pm On May 22, 2019 |
anonimi: The only education I need from you is you listing the major rail projects they started and completed. Let's start from there. 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by kayusely70(m): 10:26pm On May 22, 2019 |
A Commendable move that will boost the city's and the state's economies |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by garfield1: 10:33pm On May 22, 2019 |
EngrKem:Watch your words mr.the best governor in the south south is obaseki,udom is one of the worst.best governor in Nigeria is ambode. |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 10:58pm On May 22, 2019 |
Meanwhile n the SE. |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by DisGuy: 10:59pm On May 22, 2019 |
Blue3k: Doubt there's an access road ready, even though theyve been planning an inland port for a very long time. Now they will make it all seem very urgent and hike the cost as usual. Ibadan to Kano will take a very long time, the next segement is Kano-Kaduna which is about 300km, then Ibadan to Abuja(im sure this is also broken into segments) if you consider Lagos-Ibadan 180KM took a very 'serious' FG 2.5-3years. I understand the chinese counterpart are pushing for the whole Ibadan-Kano segment at once but I doubt the govt can find the funds without interrupting works. Lagos-Ibadan Expressway is still trudging along after all these years 2 Likes 1 Share |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by seguno2: 11:24pm On May 22, 2019 |
DisGuy: What is stopping them from completing the road but they are making so much noise about the half done railways that were contracted out by the previous administration? What could be the problem 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 11:49pm On May 22, 2019 |
seguno2: OBJ awarded the first contract for the project back in 2006 and GEJ re-awarded or did another MOU in 2012, now, of what use is any awarded contract that you can not start and complete? Is awarding and abandoning contracts for decades an achievement and something to beat chest with? I don't know why you people love to hold up failure as a badge of honour. 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by Nobody: 11:52pm On May 22, 2019 |
plaindealer: What rail has been completed in less than 3yrs? The govt is rounding up four years next week and the rail hasn't been completed so what are you talking abt? If you think the PDP achieved nothing, I'll say that's how you wish to see it. But you should know that APC has not done any better by whatever yardstick you may wish to measure governance. I stand by that!! 2 Likes |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by Nobody: 12:00am On May 23, 2019 |
anonimi:God bless you for this. Don't mind the idiotic APC rats. They enjoy turning facts on its head forgetting we all live in this country together. Imagine saying APC is better than PDP. If you say they're the same, I have no arguments with you. But to say APC is better is a stupid lie even APC themselves know. Nigeria has performed worse on every indices of development since APC came to power!! 2 Likes |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 12:12am On May 23, 2019 |
Buckubuck: Don't worry about what I wish to see, just prove me wrong by showing us the rail projects they started and completed while in office for 16 years. Lagos Ibadan rail project commenced in 2017 and slated to be completed this year, 2019. Please explain to us why this project was abandoned and never even see the light of the day since 13 years ago when OBJ awarded the first contract? You have a great opportunity to show us the wonderful rail and other major projects the PDP started and completed in less than 3 years. 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by Nobody: 12:19am On May 23, 2019 |
plaindealer:You keep talking like an apologist. Why don't you let the project be completed before counting the days. By that same yardstick, we can say Abj-Kaduna was completed in 3 years since it was started in 2013 and completed 2016 don't you think? This should also help you anonimi: 2 Likes 1 Share |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 12:20am On May 23, 2019 |
Buckubuck: You live in Nigeria, but you missed the fact that VP Osinbajo flagged off the rail project in 2017 and not in 2015? You live in Nigeria, but you still don't know for a fact that the PDP awarded the first contract for this project 13 years ago and totally left and abandoned the project on the drawing board? You in Nigerian and you still did not know for a fact that past governments including the PDP abandoned Warri Itakpe railway for 30 years before the current administration completed the project in less than 3 years? Sounds like you live under a rock in Afghanistan. |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by DisGuy: 12:20am On May 23, 2019 |
seguno2: Most of these politicians are major shareholders of Julius Berger. you rarely hear of a project awarded to Julius Berger that is completed on time and budget! funny enough you will never hear anything from the contractors themselves, just politicians telling us all the excuses on their behalf- Nigerian engineers still using Rainfall as an excuse to delay projects, the usual slow release of funds etc Most of the equipment for the railways were imported doubt there is anything JB and RCC needs to import for road construction yet they will tell you how 'technical' it is 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 12:22am On May 23, 2019 |
Buckubuck: I was actually waiting for you to show us the rail projects started and completed by the PDP after 16 years in office and hundreds of billions in oil earnings. This is all I need from you. |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by Nobody: 12:31am On May 23, 2019 |
plaindealer: Like I told you before, all these rail projects were part of the rail masterplan conceived by OBJ in 2005. It was broken segments by GEJ in 2011 due to funding issues which even this adminstration is battling with so talk of abandonment does not exist except in your mind. BTw, Abuja to Kaduna was started in 2011 and completed in 2014. That osinbajo flagged off Lag to Ibadan segment is a direct consequence of the already existing contract with CCECC since the time of OBJ and GEJ. This link should help you https://www.railway-technology.com/projects/abuja-kaduna-rail-line 2 Likes 1 Share |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by seguno2: 12:42am On May 23, 2019 |
DisGuy: I thought that with the corruption fight that Julius Berger story would have changed but it obviously has not. The imported railways equipment seems to confirm that the contract was in place and paid for by the previous administration. Can this be true 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 12:58am On May 23, 2019 |
Buckubuck: You are wrong, the ongoing Lagos Ibadan railway is a new contract with a dfferent price tag. 1. The contract for Lagos Ibadan railway was first awarded in 2006 by OBJ, but OBJ refused to start the project, he left it for dead on the drawing board. 2. GEJ re-awarded the same project in 2012, but he refused to start the project, he left it for dead on the drawing board. 3. The contract was renegotiated and re-awarded at a reduced price by Amaechi under the current administration. Awarded and awarded contracts left for dead on the drawing board or abandoned for decades is of no use to the society, it's called incompetent and dereliction of duty. I hope you don't end up in any official position charged with such responsibilities since the culture of incompetence and abandoning projects tickles your fancy. |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 1:06am On May 23, 2019 |
They drew up plans, they made a lot of money from 1999-2015 and did not complete anything in 16 years, but they still want us to believe that they are better than the people that not only started and completed a major rail project in less than 3 years, but actually completed the ones they the PDP abandoned. What kind of backward, corrupt and warped logic is that? |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by anonimi: 2:26am On May 23, 2019 |
Buckubuck: That is why they need the lies and propaganda to cover up their looting and performance failures. Since 1999, that is what Tinubu and APC have always done. Samples below on this topic. kodded: munas: 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by anonimi: 2:33am On May 23, 2019 |
plaindealer: Looks like you also need some education about federal allocation formula which gives states 43% (including the 20% for LGAs that they hijack) and only 53% to the federal government. You should also know that the price of oil started dropping in 2012 hence the 36 state governors were putting pressure to cushion the effect with ECA draw downs since we all rejected their subsidy removal, which the dullard has now implemented. www.nairaland.com/attachments/2578022_iweala_jpeg0858fd35c7757170d8155dae6623e1c2 FG, States, LGs Share N568.4 Billion for Oct 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by anonimi: 2:38am On May 23, 2019 |
plaindealer: What warped logic are you using to say that 70%/80% completed projects are abandoned You go school at all? Abi you be runaway like barawo bubu who joined the army on his principal's recommendation instead of writing his final exams? What a chronic dullard! Previous Govts Initiated ‘Most Of The Things This Administration Is Doing’ – Adesina 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 2:46am On May 23, 2019 |
anonimi: You mean the Lagos Ibadan railway was also 70-80% completed when construction started in 2017? I really need a sane and intelligent PDP mouthpiece to go back and forth with? |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 2:49am On May 23, 2019 |
anonimi: So, APC's 3 years in office was able to start and almost complete the Lagos Ibadan railway in less than 3 years because they made and shared more money than 16 years of PDP? I really don't get your logic, you are not making any sense? |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by anonimi: 2:58am On May 23, 2019 |
plaindealer: How many people do you want to hoodwink with your lies Rushing to launch a project is not the same as its completion. Why flag off an almost complete project and ask for people's vote as a form of payment? 50% completion because only a single lane was nearly done? APC is devilish and satanic! Barawo bubu and his thieving Amaechi did not even complete the Iju-Abeokuta section but you are telling lies of Lagos Ibadan. Are you okay? Amaechi apologises to Nigerians over suspension of free Iju-Abeokuta train ride Do you have comprehension problem or you are simply blind to facts 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by anonimi: 3:08am On May 23, 2019 |
FG flags off Lagos-Abeokuta train service, offers 3-month-free ride 8th February 2019 The Federal government says it will flag off the Lagos-Abeokuta railway transport and offer passengers three- months-free-of-charge service. Riding from Iju in Lagos State to Abeokuta in Ogun State to test the service were Governor Ibikunle Amosun, Minister of Transportation, Rotimi Amaechi; Chairman, Senate Committee on Land Transport, Gbenga Ashafa and some members of the National Assembly among others. On ground to receive the party on arrival were Nobel Laureate, Prof. Wole Soyinka; Alake of Egba land, Oba Adedotun Gbadebo, other traditional rulers and pockets of crowd that entertained the visitors, singing and dancing. Speaking during the ceremony, Amaechi commended the Abeokuta community for making the execution of the project hitch-free, noting that they were the only ones in Nigeria that did not demand compensation. “This is not a commissioning ceremony. We just decided to put the train on the track to convey passengers for three months free of charge. We are done here and we are grateful that Ogun State government organised this to welcome the third standard gauge in Nigeria. Itakpe-Warri is the first while Abuja-Kaduna is the second. “The first tunnel in Nigeria is in Ogun State. This work is not free of charge, you will have to pay for it and the only way to pay is for you to vote. If you want us to take the project from Ibadan to Kano, then we need your vote. “Vote for APC, that is all we are asking for but this train will run from Saturday free of charge and I will compel them to do about three trips a day so that more persons can go to work in the morning and come back in the evening. “We are also trying to build our stations and in a year’s time, we would have finished the stations and everything will be running normally and then you will be paying your money,” he said, promising to fix some of the issues raised by community members that the rail project passed through. https://www.sunnewsonline.com/fg-flags-off-lagos-abeokuta-train-service-offers-3-month-free-ride/ 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by anonimi: 3:13am On May 23, 2019 |
plaindealer: Did you specify Lagos Ibadan railway in your post that I replied Were you talking about PDP abandoning a project that was started in 2017? Trying to be clever by half only shows you to not be sane and intelligent despite your best efforts. Sorry. plaindealer: 1 Like |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 3:20am On May 23, 2019 |
anonimi: Post all the rubbish you like, it's still a stated and completed railway in less than 3 years, something your PDP masters could not do in 16 years. Why are you even ranting over the completion date? The question is, why was it abandoned and never started by the PDP while in power for 16 years? |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 3:25am On May 23, 2019 |
anonimi: It doesn't matter because the PDP did not complete any rail projects while in power for 16 years. They abandoned Warri Itakpe railway for 30 years, the current administration completed it in less than 3 years. Dance around and post all the irrelevant rubbish you desire, the PDP is still a lazy, incompetent and useless party with little or nothing to show for their 16 years in offie. |
Re: Light Rail: Prepare For Gridlock In Oyo, Amaechi Alerts Incoming Govt by plaindealer: 3:32am On May 23, 2019 |
anonimi: www.nairaland.com/attachments/2557938_img20150625133531_jpeg647ad554f94c5eebf3bbce76f76bd0f4 4 months later, In the same 2015 |
Akeredolu Picks Ayedatiwa As Running Mate / Pandora: Inside The Secret Offshore Companies, London Properties Of Bello-Koko / 20 Nigerian Celebrities Who Have Directly Or Indirectly Ventured Into Politics
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 118 |