The New Apapa-Oshodi Expressway As Construction Works Continue - Photos - Travel (2) - Nairaland
Nairaland Forum › Nairaland General › Travel › The New Apapa-Oshodi Expressway As Construction Works Continue - Photos (39861 Views)
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Kyllahmc(m): 12:39pm On Oct 15, 2019 |
Ok |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by mysteryman2014: 12:39pm On Oct 15, 2019 |
I hope ducts for use by telecoms and other utilities are included in the design and construction of the road before request for Right of Way to lay cables et al are being made thereby resulting in damage to the roads. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by SocialJustice: 12:43pm On Oct 15, 2019 |
Impressive. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by mkoabiola: 12:44pm On Oct 15, 2019 |
Amuatulu:Is under Ogun state. I learnt d road is jus too bad now |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by ryloy: 12:53pm On Oct 15, 2019 |
Good job God bless Dangote God bless Minister of Work and Housing God President Muhammadu Buhari God bless Federal Republic of Nigeria |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by FinallyFamous: 1:00pm On Oct 15, 2019 |
Nice |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by wellmax(m): 1:01pm On Oct 15, 2019 |
EastGold:This is concrete road, it will last longer than coal tar |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by brownskilo(m): 1:19pm On Oct 15, 2019 |
Rigid pavement.... Nice one Mr Governor. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Grundig: 1:19pm On Oct 15, 2019 |
The finishing is good. Thickness should be between 6-9inches. However, work is extremely slow. My guess is they are not yet proficient with it unlike bitumen. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by JimohMomoh: 1:51pm On Oct 15, 2019 |
wellmax:False, that road won't last more than a year before it begins to fail. I have three reasons for saying so 1) There are no Expansion Joints Any road or bridge made of concrete & steel need gaps b/w certain distance for example gaps every 100m. The gap is needed because concrete & steel expands in size during hot sunny day and contracts(reduce) in size during cold. Engineers add gaps so that the road doesnt buckle up and crack during hot and cold day. I guess you must have experience bumps or seen these gaps whenever you pass through a bridge. 2) There is No Surface Cover Plain concrete road surface need Polishing or covering with coal tar or tarmac. This is because ordinary concrete surface wearout and produce tiny dust particles whenever tyres of vehicles pass through it. Exposed Cement surfaces easily reacts with acidic rain, garbages dumped on it, spills from Petroleum producs and fail. 3) Dangote Cement is not Manufactured Specifically for Road Construction. There are special type of cement meant for road construction, just like white cement is used for tiles and marble works. Most of the concrete road done in Nigeria by Julius Berger, Dumez and MotherCat uses special type of treated cement that can withstand bending without breaking or cracking, these roads have over 50yrs lifespan and they are seen in some parts of Lagos, Warri, Benin and PH. Apapa-Wharf road constructed by same Dangote with cement is aready having tiny cracks and have little wear & tear where heavy trucks are parked |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by arsenal33: 2:01pm On Oct 15, 2019 |
EastGold:which state are you from, is your state better and have you EVER held your governor to account? |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Dwizeone: 2:29pm On Oct 15, 2019 |
Auladimeji:I went to drop someone at the airport for 11am flight to Portharcourt. I left the airport around 10.40am, the person got to port harcourt, got to destination in PH, I was still in traffic returning, all because I took that route going towards Cele. The traffic is terrible. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by def111(m): 2:30pm On Oct 15, 2019 |
Op na old picture |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by wellmax(m): 2:38pm On Oct 15, 2019 |
JimohMomoh:. Tiny cracks means the road won't last. Nawa for village engineers |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by ghettochild(m): 3:00pm On Oct 15, 2019 |
where is the space for drainage ![]() ?? |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by teamarhO: 3:05pm On Oct 15, 2019 |
Auladimeji:I tell you! |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by adetes: 3:37pm On Oct 15, 2019 |
Lagos is too overated |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Realestatepro(m): 3:44pm On Oct 15, 2019 |
goshen26:The stress yesterday was crazy. I left my house by 5am. Went through this oshodi, it was on lock down. Everywhere was blocked. I got to my office at festac by 11am. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by stzy(m): 3:50pm On Oct 15, 2019 |
From Cele to Iyana Isolo these days we pay 200-300 daily Something we pay 50box for The traffic on that road …. We can only endure to enjoy later once they don't introduce BRT lanes there |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by fykes(m): 4:01pm On Oct 15, 2019 |
wellmax:That guy made very salient points don't say what u don't know... Expansion joints are very necessary on concrete roads. The surface coating however is not as necessary as long as only pneumatic tires and no tracks ply Tue road. I don't know what he meant by Dangote cement not made for road, maybe hes talking of addictives and fibre mesh technology he must have seen being used during mixing. Overall, concrete roads should have a minimum of 5-8 years lifespan before repairs. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by fykes(m): 4:05pm On Oct 15, 2019 |
ghettochild:That is a federal highway... It's been reconstructed... Drainage on federal (major) roads are mainly designed to be underground drains. Check.. The road is cambered to one side. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by fykes(m): 4:14pm On Oct 15, 2019 |
JimohMomoh:Nice points... But on the third point, there's actually no special cement for road construction... What u talk about are addictive. The one u explain is a plasticider. It makes the concrete mix become monotonous by giving it plastic qualities. Others use fiber mesh in place of steel rods or any reinforcement. They all ensure durability of the concrete and good finishing. U should know however, like in all good things, they have downsides, An addictive improved concrete takes more time to cure and hence requires constant curing bcoz its mixed with little water and that's why it dries fast. U will have to keep curing it over 2 weeks unlike a mix without addictives |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by wellmax(m): 4:42pm On Oct 15, 2019 |
fykes:Of course, the engineers in charge are IT students, they don't know much. You can go and lecture them. I'm telling him because he seeing cracks on a road that's over a year old does not mean that the raid is bad. |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Olarewaju89: 4:54pm On Oct 15, 2019 |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by danhans(m): 5:19pm On Oct 15, 2019 |
AutoReportNG:. Edited pictures That where i pass everyday |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Legendguru: 5:19pm On Oct 15, 2019 |
Oh |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by ceasare: 5:27pm On Oct 15, 2019 |
Badonasty:I spent 6 good hours on that road yesterday even trying to Find a way out of d traffic jam to no avail. It shall not be well with hitech ,Lagos state govt and who ever Is supervising that road from d ministry ! Whatever happens to palliative measures on d service lanes To aid traffic flow from Toyota to cele. What's going on on that road amounts to genocide as telling you. Fixing a road isn't tantamount to killing the road users before fixing the road! |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Badonasty(m): 5:31pm On Oct 15, 2019 |
ceasare:We just have to be patient and keep praying for them to get it right |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by mistyebby(f): 6:01pm On Oct 15, 2019 |
Fuckthamods:This is the 3rd time Op is posting same Itire road. This project might not end till 2023 the way they are going about it |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by ceasare: 6:01pm On Oct 15, 2019 |
Badonasty:This is 2019 it's not prayers we need .we. Need sensitive,responsible and proactive Leaders and people at helms of affairs who ought to know that when constructing a new road you need to arrange an alternative road to ease the plight of the people you are building the road for! Do you know how many manhour ,money and time lost on that road daily? It's unquantifiable!!! |
| Re: The New Apapa-Oshodi Expressway As Construction Works Continue - Photos by Fuckthamods: 6:05pm On Oct 15, 2019 |
mistyebby:God forbid o... Going to work has become too horrible. No road and the little one we are suppose to manage those wicked trailers blocks it. |
Commuters Groan Over Gridlock On Lagos-Ibadan Expressway As Construction Resumes • Traffic On Abuja-Keffi Expressway As Army Blocks Road To Stop Shiites (Photos) • Trailer Loses Control, Crushes A Bus Along Apapa-Oshodi Expressway (Graphic Pics • 2 • 3 • 4