CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 2:48am On May 07, 2020
Greetings well meaning nairalanders. I just recently started my build 2weeks before the lockdown.

Client:Me
Contractor: Non nairalander
Contract Duration: 5 months
Estimated cost:?
Project location: Lagos.
Plot size: 60ft x 60ft


GROUND FLOOR
V.toil
Living Room
Dinning
Bedroom 1
Guest Bedroom
Kitchen
Store
Laundry
Gym area



FIRST FLOOR
Family Lounge
Bed 1
Bed 2
Master bedroom with a walk in closet.
All rooms have a study area and are ensuite



I would really need and would appreciate the help of the gurus in the Industry @skimanskii, mufutau and other geniuses to help me with useful advice and guide me through this project to make it a success.

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by sholatech(m): 2:52am On May 07, 2020
Nice..Registered for this class

2 Likes

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 3:32am On May 07, 2020
By the grace of God, construction work is soon to continue if all things go well and we arent locked down again by the federal government due to the COVID-19 pandemic ravaging our country.

I would be providing also an expense report on jobs done and price quotations for future jobs, in a bid to avoid the contractor ripping me off.

I really hope I get all the help I need from everyone on here to make this build a success.

So far what was achieved in the first two weeks of work on site.

The site didn't need any form clearing as it was for some reason without grass due to the fact that it was a prayer ground, so I believe the traffic there wouldn't allow for grasses to grow.

Purchased materials to kick start the foundation
Iron rods
Cement
Sand
Granite
Wooden stakes,sticks,nails....

Foundation type: A type of foundation where the points of the columns are dug some feet below the concrete that carries the block wall, Dont know what it is called.

A concrete batch mixer was used to pour the foundation concrete.The contractor made this recommendation saying he wants the mix to be solid and uniform and for the foundation concrete to properly bond.

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by mufutau55(m): 3:54am On May 07, 2020
We are here following. Wow! I could not beleive this building will fit on 60ft × 60ft land. But looks real nice.

Hajji M.

2 Likes

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 5:19am On May 07, 2020
mufutau55:
We are here following. Wow! I could not beleive this building will fit on 60ft × 60ft land. But looks real nice.

Hajji M.


Oh my goodness general Mufutau is on my thread. I am so loving this right now, Thank you so very much. Really look forward to your inputs. Dont mind me calling you a general.

I am humbled

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 5:44am On May 07, 2020
More pictures of work done this includes setting of block,sandfilling and German floor.

4 big trucks was used for the sand filling.
Again a batch mixer was used to pour the German floor.

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 5:51am On May 07, 2020
And then I visited the site yesterday to see the job done so far. I Can't say I am unimpressed cheesy

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by foxxydude: 6:33am On May 07, 2020
Congratulations OP

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by ConcNiggress56(f): 7:00am On May 07, 2020
Hey.. congrats

I love this house design.. can you share the plan with me via email?

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 11:02am On May 07, 2020
Sure no problem, you can drop your email address and I will forward it to you.
ConcNiggress56:
Hey.. congrats

I love this house design.. can you share the plan with me via email?
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by mufutau55(m): 12:36pm On May 07, 2020
patnas1990:

Oh my goodness general Mufutau is on my thread. I am so loving this right now, Thank you so very much. Really look forward to your inputs. Dont mind me calling you a general.
I am humbled

Thank you Sir.

Hajji M.
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by Powerexpert: 10:21am On May 08, 2020
Well done.

Driver drop me here!!!

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 10:34am On May 08, 2020
grin you are welcome
Powerexpert:
Well done.

Driver drop me here!!!
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by ConcNiggress56(f): 8:58pm On May 08, 2020
patnas1990:
Sure no problem, you can drop your email address and I will forward it to you.

thanks..

Please send to st787231 @ Gmail dot com..

Please join it together.. I don't want to be banned
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 9:30am On May 22, 2020
Greeting fellow nairalanders and to the professionals viewing this topic.

I visited the site today and work is ongoing. I need advice from the professionals here.

I have decided to use extra height doors and windows, I just love how they look and the beauty it adds to your home.

1. Is it advisable to use it for all the doors or just for the entrance.
2. What is the advantage or the disadvantage of using extra high doors cause I know for sure it's already demanding for more blocks to get to the desired height.


Also the contractor told me he would be taking the lintel round the house to 11 course of blocks, and then 2 course above the lintel to the decking.

What's your advice on this as this is going to draw up extra costs for me.

Please I need your expert advice.

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by pman096(m): 10:01am On May 22, 2020
Extra high doors when used in residential homes is mainly for the aesthetics, so using it at the entrance is would be nice but using it everywhere will incur more costs. If you're capable you can go for it as this will help your home standout aesthetically.
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 10:58am On May 22, 2020
pman096:
Extra high doors when used in residential homes is mainly for the aesthetics, so using it at the entrance is would be nice but using it everywhere will incur more costs. If you're capable you can go for it as this will help your home standout aesthetically.

Thank you very much. I would do a costing and see if I can afford it.

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by Hum2020: 12:41pm On May 22, 2020
patnas1990:


Thank you very much. I would do a costing and see if I can afford it.
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by Hum2020: 12:47pm On May 22, 2020
@ op you can afford it ok remember is once in life time the almighty God who give you the opportunity to start this very project will give you the grace to complete it congratulations brother i love this
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 12:49pm On May 22, 2020
Hum2020:
@ op you can afford it ok remember is once in life time the almighty God who give you the opportunity to start this very project will give you the grace to complete it congratulations brother i love this
thanks my oga. GOD bless you richly
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by 1stNumeroUno: 10:23pm On May 23, 2020
patnas1990:
Greeting fellow nairalanders and to the professionals viewing this topic.

I visited the site today and work is ongoing. I need advice from the professionals here.

I have decided to use extra height doors and windows, I just love how they look and the beauty it adds to your home.

1. Is it advisable to use it for all the doors or just for the entrance.
2. What is the advantage or the disadvantage of using extra high doors cause I know for sure it's already demanding for more blocks to get to the desired height.


Also the contractor told me he would be taking the lintel round the house to 11 course of blocks, and then 2 course above the lintel to the decking.

What's your advice on this as this is going to draw up extra costs for me.

Please I need your expert advice.

I'll suggest you maintain common/standard door and windows throughout.
Though higher doors usually look pretty but I'm afraid it'll come with some issues considering artisans ignorance/negligence/incompetence (sometimes). If you're constructing the front/main door from welder you can shoot it.

But check if what you really want is more head room in the building, you can increase the course to 3 after lintel.
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 10:12pm On May 28, 2020
Very insightful, thank you so much. I have put a lot of factors into consideration.

I have decided to use high windows,normal doors for the interiors and extra high doors for the entrance and exit doors.

1stNumeroUno:


I'll suggest you maintain common/standard door and windows throughout.
Though higher doors usually look pretty but I'm afraid it'll come with some issues considering artisans ignorance/negligence/incompetence (sometimes). If you're constructing the front/main door from welder you can shoot it.

But check if what you really want is more head room in the building, you can increase the course to 3 after lintel.
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 10:49am On Jun 01, 2020
Greetings fellow nairalanders and all the professionals viewing this thread. So far so good work hasn't been moving at a speedy rate due to rainfalls in the past week. But we have arrived at the lintel.

So far from the German floor to this level an exact 458,000
has been spent on blocks, cement, sand and labour. We did a little expansion of the living room as well all this is included in the 458,000 spent so far.

Now a quotation was given to me by my project contractor to do the lintel and columns. I attached a screenshot of the PDF sent to me. Please I need your expert opinions on this.

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 10:58am On Jun 01, 2020
Entry way

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by Hum2020: 11:57am On Jun 01, 2020
@pstnas1990 from your statements u mean that the sum 458,000 is what you have spend from foundation to this very stage the work has being done because from start of this project you did not state the amounts which spent on foundationto dpc ,well for me quotation of using plank for lintel and Columus is ok

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by mufutau55(m): 5:27pm On Jun 01, 2020
.
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by mufutau55(m): 5:32pm On Jun 01, 2020
I agreed with Hum2020 that you did not give cost for the foundation/DPC. Reading your last post one would think you mean the 458k included the foundation/DPC.
Now, for the cost of lintel, it seems good to me, the quantity of materials needed andvthe respective labor cost. There are more work involved in casting the pillars and the lintel. This is a granite, cement, sand and concrete work.
Go for the wood planks method for 445k. You may even use the wood planks for other things later... Using marine board is not any better. God will provide the fund.

Hajji M.
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by loffers(m): 7:59pm On Jun 01, 2020
I will go wit planks, since the planks are reusable
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 11:59pm On Jun 01, 2020
Truly sorry I have not been able to give a lowdown on expenses made so far from the foundation to the German floor, i haven't really had the time to compute it. I will do that in due time.

The 458,000 is what has been spent so far from the German floor to the current level it is(lintel).

Hum2020:
@pstnas1990 from your statements u mean that the sum 458,000 is what you have spend from foundation to this very stage the work has being done because from start of this project you did not state the amounts which spent on foundationto dpc ,well for me quotation of using plank for lintel and Columus is ok
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by patnas1990: 12:05am On Jun 02, 2020
Thanks my oga for following.
Truly sorry if my last post wasnt really clear, I am not so conversant with a lot terms used in construction just trying my best, though I have been making my research on the most common terms used in the profession so as to understand very well what the project contractor gives me.
Thanks for your valid input as well. I think I would just go for the wood planks afterall.





mufutau55:
I agreed with Hum2020 that you did not give cost for the foundation/DPC. Reading your last post one would think you mean the 458k included the foundation/DPC.
Now, for the cost of lintel, it seems good to me, the quantity of materials needed andvthe respective labor cost. There are more work involved in casting the pillars and the lintel. This is a granite, cement, sand and concrete work.
Go for the wood planks method for 445k. You may even use the wood planks for other things later... Using marine board is not any better. God will provide the fund.

Hajji M.

1 Like

Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by scorpio1(m): 1:04am On Jun 21, 2020
@OP

How is the project going?
How much did you buy 30tons of Granite currently?
Re: CONSTRUCTION DIARY OF A 5 BEDROOM ALL ENSUITE DUPLEX by loffers(m): 1:28am On Aug 06, 2020
patnas1990:
Truly sorry I have not been able to give a lowdown on expenses made so far from the foundation to the German floor, i haven't really had the time to compute it. I will do that in due time.

Any luck on this?

The 458,000 is what has been spent so far from the German floor to the current level it is(lintel).


Any luck with the breakdown?

(1) (Reply)

Cost Of Foundation For A Twin Duplex / 6 Acres Of Land At Ikeja, Gra Price:2.7b-net Tittle C Of O / Plaster Of Paris Ceiling Design

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 56
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.