Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract - Politics (2) - Nairaland
Nairaland Forum › Nairaland General › Politics › Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract (3845 Views)
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 11:58pm On Jul 29, 2020 |
This is nothing but consultancy job and training.
How much will Nigeria pay? |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 12:35am On Jul 30, 2020 |
Thank God these are German investors, I love Frankfurt. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 6:51am On Jul 30, 2020 |
Rossikki:read what you wrote again ![]() |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by seunmsg(m): 8:32am On Jul 30, 2020 |
Omooba77:Abba Kyari went to Germany to negotiate the deal and contracted vivid-19 in the process. He died as a result of covid-19 complications and not the deal. I don’t know the cost of the project but I am sure it will cost much. Do you expect a project that intends to provide 25,000MW to be cheap? If we don’t spend heavily to build power infrastructure, what should we spending on? Siemens AG is the largest industrial conglomerate in Europe. How did you come to the conclusion that such a reputable company has little to contribute? Are you aware that this project is backed by the German government? See, we won’t move forward if we continue to criticize blindly. You don’t understand the deal and you’re already running it down simply because you hate the current president. Hatred for Buhari won’t develop Nigeria and whether you like it or not, he will remain the president till 2023. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by byinks(f): 8:45am On Jul 30, 2020 |
It's really important to power 5G agenda. It's not a white elephant project. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by abduljabbar4(m): 9:34am On Jul 30, 2020 |
Buhari has failed to meet my expectations in a lot of areas but infrastructure is an exception. With adequate infrastructure, Nigeria is likely to smile in the next decade to come |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 9:37am On Jul 30, 2020 |
seunmsg:Oga, this is pre engineering, hope you know what this phase mean in contract sir? Do you know GE has been in this country for years? My personal opinion, this is just pure wastage! |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by seunmsg(m): 10:10am On Jul 30, 2020 |
Omooba77: Read and understand, it won’t kill you. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 10:21am On Jul 30, 2020 |
seunmsg:Still increase operational to 7000MW, when will have been having audio 10000 MW. So in the agreement we are still at less than 7500MW. Why is government signing this kind of agreement when it has been sold off? As for me Siemens should have been given a new outlay as an investor, rather than meddle in the existing arrangement. Sir it WILL not work, let them start their own afresh. Many atimes will do things with sentiment and in order clime this is not the norm. Who will be running the affair, Discos or Siemens, dont you know their will be infractions |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by seunmsg(m): 10:26am On Jul 30, 2020 |
Omooba77:You are beyond redemption, go away with your hatred. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 10:30am On Jul 30, 2020 |
seunmsg:I have added to this post. Sometimes supporting an ideal thus not make it right sir? |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 10:48am On Jul 30, 2020 |
seunmsg:Sir, if I hate Nigeria, I will not be here.. Nobody is paying me to make my contributions and I dont work for government. God keeping us alive after 3 years we will Evaluate it. Government is not supposed to handle everything. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 11:27am On Jul 30, 2020 |
flyingpig:My own take too. Discos already in charge.... How will the arrangement work? |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 11:33am On Jul 30, 2020 |
favor914:so says favour419 Look at your username ![]() |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 11:35am On Jul 30, 2020 |
Superwave:herdsmen sponsored by buhari are too many in middle belt and the south |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 11:35am On Jul 30, 2020 |
Rossikki: ![]() |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by flyingpig: 11:36am On Jul 30, 2020 |
kolaaderin:and APC is killing Nigerians with herdsmen ![]() |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 12:14pm On Jul 30, 2020 |
Hope someone has read this Siemens agreement thoroughly and we are not playing to gallery in the name of politics. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 12:44pm On Jul 30, 2020 |
In the words of one of the ministers, if we probe too much the money will not be released.......La la lai... lol |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 1:28pm On Jul 30, 2020 |
seunmsg:See, we won’t move forward if we continue to criticize blindly. You don’t understand the deal and you’re already running it down simply because you hate the current president. Hatred for Buhari won’t develop Nigeria and whether you like it or not, he will remain the president till 2023. I dont hate him, but I hate his inactions of standing aloof and keeping mute when things are not going on well. Not just issuing terse statements everytime. Where the word of the king is, there is power. Nigeria belong to All of us by God's grace. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 5:01pm On Jul 30, 2020 |
byinks:Why not allow Siemens to start from scratch? |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 7:15pm On Jul 30, 2020 |
Lalasticlala |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 2:02pm On Jul 31, 2020 |
How many years. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Bbbwings: 6:45pm On Sep 15, 2021 |
Abohboy:Your mumu is legendary |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 11:27am On Sep 16, 2021 |
seunmsg:This was my comment in 2020.Hope you heard Markel..... When Chimanda asked her.... For now, we may not need foreign companies for our power supply. Wasting millions without find solution to transmission and distribution is a waste of resources. My own kobo........ |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Omooba77(op): 11:31am On Sep 16, 2021*. Modified: 12:55pm On Sep 16, 2021 |
Bbbwings:Most of them are paid to spew thrash. Same way in 2015 some of them were shouting, Dangote refinery will be ready in 2019. I told them then; 2021, nothing will be on ground. Solar energy in the North will solve our problem of power in two years, Renewable energy. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Yorubasareslave: 1:53pm On Sep 22, 2021 |
The last i heard this project like everything buhari is involved in has entered voice mail. |
| Re: Siemens Begins Work On 25,000MW Project As FG Approves Pre-engineering Contract by Abohboy: 2:03pm On Sep 22, 2021 |
Omooba77:I mean you're only half right in terms of the refinery there is a lot on ground up to 67% completion rate and in terms of solar energy Nigeria doesn't have the money for it, Nigeria if we had 100% connectivity for electricity we would need 180 000MW of energy and to build enough solar plants to produce that much energy would cost up to 100-130 billion dollars ( Bevause we'd have to import all the equipment as well ) And added to that is the transmission infrastructure which would run the cost up to 200-300 billion dollars or more so for now we should depend on cheap energy solutions like gas or coal and hydroelectric |
Ogun State Begins Work On Ojodu Abiodun, Akute Road (Photos) • 2 • 3 • 4
Tears As Buhari Go Home Protest Goes Wrong _ Video • Behold The Next President Of Nigeria. Insha'allah. (pictures) • APC Changes Strategy As Supreme Court Adjournes New/old Naira Note Circulation


