Ready for the concrete cast........
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:00pm On Aug 07, 2020 |
Spreading nylon sheets on the foundation.....
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:02pm On Aug 07, 2020 |
Get ready, go.......
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 1:32pm On Aug 08, 2020 |
Continue with the concrete cast of the DPC
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 1:37pm On Aug 08, 2020 |
More concrete to the floor cast...........
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 8:03pm On Aug 08, 2020*. Modified: 9:34pm On Aug 08, 2020 |
More pictures from our works in this house today........
|
| Re: The Making Of The "White Penthouse" In Anambra by BBBB20(m): 7:57am On Aug 09, 2020 |
Please what on take on this, to support 600mm cantilever wall to roof with concrete facial, 2bar 16 mm bottom and 4 bar 16mm top and extra 16mm for starter bar
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 4:49pm On Aug 09, 2020 |
Completing the concrete cast of the DPC........
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:42pm On Aug 10, 2020 |
Formation of block walls for this house........
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:48pm On Aug 10, 2020*. Modified: 8:39am On Aug 12, 2020 |
Making column bars for the continuation of the pillars at this stage.......
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:53pm On Aug 10, 2020 |
More forming.......
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:01pm On Aug 10, 2020 |
Front of the house..........
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:17pm On Aug 10, 2020 |
Raising block walls in this house.......
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:23pm On Aug 10, 2020 |
More blocks laid.......
|
| Re: The Making Of The "White Penthouse" In Anambra by Austinosconst: 9:02pm On Aug 10, 2020 |
spyder880:please is it compulsory to apply nylon before casting? |
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 9:25pm On Aug 10, 2020 |
Austinosconst:No, it depends on the results you want to achieve. |
| Re: The Making Of The "White Penthouse" In Anambra by Austinosconst: 9:28pm On Aug 10, 2020 |
spyder880:ok. Like in this case, what results do you want to achieve that made to use DPM? |
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:41am On Aug 11, 2020 |
Austinosconst:Better concrete curing because of water retention. |
| Re: The Making Of The "White Penthouse" In Anambra by Austinosconst: 4:30pm On Aug 11, 2020 |
spyder880:ok. Thanks alot |
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:45pm On Aug 11, 2020 |
Today at this site.........
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 8:39pm On Aug 12, 2020 |
More work was done in this house today, more pictures tomorrow. |
| Re: The Making Of The "White Penthouse" In Anambra by loffers(m): 7:29am On Aug 13, 2020 |
Austinosconst:In some cases, the reason is to prevent upward movement of dampness/moisture |
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:53pm On Aug 13, 2020 |
We have raised all the walls to lintel levels........
|
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:00pm On Aug 13, 2020 |
From the side......
|
| Re: The Making Of The "White Penthouse" In Anambra by michlins(m): 7:02pm On Aug 13, 2020 |
spyder880:the rate this building is rising with eh |
| Re: The Making Of The "White Penthouse" In Anambra by nextstep(m): 4:58am On Aug 14, 2020 |
Austinosconst:Personally, I always do it on every building I'm working on, even on so-called "dry land". It keeps moisture from wicking up into the walls and later causing issues with mould or moss, weakening, or peeling.. Not necessary, but for 20-30k, I feel it removes a whole class of problems from the building in the future, and we're seeing best practices being used in all oga's constructions. |
| Re: The Making Of The "White Penthouse" In Anambra by Austinosconst: 6:35am On Aug 14, 2020*. Modified: 7:53am On Aug 14, 2020 |
nextstep:Please is it advisable to continue brick laying after foundation backfill without DPC then DPC comes later, maybe after roofing |
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 11:02am On Aug 14, 2020 |
nextstep:Thank you Sir. |
| Re: The Making Of The "White Penthouse" In Anambra by nextstep(m): 2:56pm On Aug 14, 2020 |
Austinosconst:The point of the DPC (or DPM) is to keep moisture from the ground entering the bricks/walls. The nylon has to be in place before any walls are set... |
| Re: The Making Of The "White Penthouse" In Anambra by loffers(m): 8:29pm On Aug 14, 2020 |
spyder880:Nice one bro, please like how much was spent on the Foundation and also from foundation level to this stage. |
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:58am On Aug 15, 2020 |
loffers:About N4.5m average. |
| Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 8:06am On Aug 15, 2020 |
Updates from our work here yesterday.........
|
OFFPLAN PROPERTY. Luxury 3 Bedroom + BQ (penthouse) In Camberwall Advantage 1 • The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra • The Making Of The "Owerri Royal Manor" • 2 • 3 • 4
Current Price Of Roofing Sheets, Building Materials In Lagos, Rest Of Nigeria • Fire Guts A Building In Ketu, Lagos (Photos, Video) • Pictures Of Kolapo Isola Estate, Best Estate In Ibadan