On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:17pm On Aug 21, 2020
DESIGN ANALYSIS
Ground floor
Entrance porch
Ante- room
Visitor toilet
Sitting room
Stair hall
Dining
Kitchen
Store
Exit balcony
Laundry
Guest room with toilet

Upper floor
Family lounge
Master bedroom with sit out
Other 2 rooms all ensuite.

AREA OF THE BUILDING
120 345Sqmts.


LOCATION
Badagry Lagos State.

NATURE OF THE SITE
Very sloppy ground in terms of topography whereby 8 coaches at the front (lowest point) equate to 5 coaches at the back(highest point).

METHOD OF CONSTRUCTION
We decided to introduce double walling retaining wall at the lowest point where we have 8coaches.( I.e. reinforced wall/ground beam has taken care of 2coaches, then 5coaches of blocks on it then finally introduced another beam on it round.

In a nutshell, it was chained round before the construction of oversite concrete/German floor. Not forgetting the properly placement of 22 columns at the strategic places.pictures are as follow
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:23pm On Aug 21, 2020
Digging after setting out

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:24pm On Aug 21, 2020
Dig2

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:25pm On Aug 21, 2020
Dig3

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:27pm On Aug 21, 2020
Dig4

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:28pm On Aug 21, 2020
Dig5

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:29pm On Aug 21, 2020
Dig6

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:31pm On Aug 21, 2020
Dig7

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by qwertyboss(m): 1:41pm On Aug 21, 2020
Following
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Dicta18: 1:44pm On Aug 21, 2020
Following
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:49pm On Aug 21, 2020
Boarding of ground beam and placement of short columns.

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:50pm On Aug 21, 2020
2

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:51pm On Aug 21, 2020
3

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:52pm On Aug 21, 2020
4

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 1:53pm On Aug 21, 2020
5

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:03pm On Aug 21, 2020
Casting of floor beam

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:05pm On Aug 21, 2020
2

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:06pm On Aug 21, 2020
3

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:08pm On Aug 21, 2020
4

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:09pm On Aug 21, 2020
6

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:26pm On Aug 21, 2020
DE-BOARDING AND SETTING OF BLOCK

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:27pm On Aug 21, 2020
2

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:28pm On Aug 21, 2020
3

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:28pm On Aug 21, 2020
4

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:29pm On Aug 21, 2020
5

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:30pm On Aug 21, 2020
6

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:30pm On Aug 21, 2020
7

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:31pm On Aug 21, 2020
8

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:32pm On Aug 21, 2020
10

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:33pm On Aug 21, 2020
11

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:34pm On Aug 21, 2020
12

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:34pm On Aug 21, 2020
13