Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,615 members, 7,809,258 topics. Date: Friday, 26 April 2024 at 06:53 AM

On-going Construction Of 4bedroom Duplex For A Nairalander - Properties (3) - Nairaland

Nairaland Forum / Nairaland / General / Properties / On-going Construction Of 4bedroom Duplex For A Nairalander (1643 Views)

CONSTRUCTION & DESIGN OF 4bedroom Duplex With 2bedroom 2flat Attach IN LAGOS / Construction Of 4bedroom Duplex With 2bedroom 2flat Attach.at AIT Road Alagbado / Construction Of 4bedroom Duplex With 2bedroom 2flat Attach At AIT Road Alagbado (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 9:08am On Aug 26, 2020
6

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 9:09am On Aug 26, 2020
7

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 9:10am On Aug 26, 2020
8

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 4:59pm On Sep 21, 2020
We're done with the filling of the spaces

1 Like

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 3:44am On Nov 04, 2020
Next phase of work is the construction of oversite concrete/German floor.

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 3:45am On Nov 04, 2020
Pic 2.

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 3:46am On Nov 04, 2020
Pic 3.

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 3:47am On Nov 04, 2020
Pic 4.

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 3:48am On Nov 04, 2020
Pic 5.

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 7:31pm On Nov 14, 2020
Blocksettings to window base (4coaches).

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 7:32pm On Nov 14, 2020
More

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 7:33pm On Nov 14, 2020
3

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 7:34pm On Nov 14, 2020
4

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by ladyteeks: 7:45pm On Nov 14, 2020
How many blocks and cement did you use for the blockwork
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 11:42pm On Nov 14, 2020
ladyteeks:
How many blocks and cement did you use for the blockwork
.you mean the blockwork on this german floor?. If yes, we used 550 9inches block and 10bags of cements.
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by ladyteeks: 1:26am On Nov 15, 2020
The total blocks and cement for the entire ground floor


Heymus:
.you mean the blockwork on this german floor?. If yes, we used 550 9inches block and 10bags of cements.
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 8:44am On Nov 15, 2020
ladyteeks:
The total blocks and cement for the entire ground floor


we haven't gotten to the final level of the ground floor, we're still at the window base.
But as you can see from the post from the onset, we introduced ground beam (chaining), in the foundation due to the sloppy nature of the ground. At the lowest point we used double beam and the highest point we used one plank beam. Also 22 short columns then finally we chained it round with another beam before casting german floor.

I explained all these to you, just to let you know what we did was not only about the block settings.
For casting of ground beam
Block settings
Final beam
Short columns
German floor

So far we have used 110bags of cement.
1300 9inches vibrated blocks.

1 Like

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 5:46pm On Dec 06, 2020
Boarding of iron rods for lintels and columns before casting

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 5:48pm On Dec 06, 2020
More pics

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 5:48pm On Dec 06, 2020
Still

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 5:49pm On Dec 06, 2020
More

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 5:50pm On Dec 06, 2020
Pics

1 Like 1 Share

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 5:52pm On Dec 06, 2020
So far

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:02pm On Dec 11, 2020
Casting of lintels and columns �% done.

Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:03pm On Dec 11, 2020
Casting of columns and lintel
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:03pm On Dec 11, 2020
2

(1) (2) (3) (Reply)

Prestige Paints Prices In Nigeria / Plots In Eleko Close To Lekki Free Trade Zone, Lagos Declared The Hottest In Afr / For Sale:various Duplexes At Mko Abiola Garden Alausa Ikeja

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 12
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.