Construction Of A 5bedroom Duplex. (magboro, Ogun State) - Properties (2) - Nairaland
Nairaland Forum › Nairaland General › Properties › Construction Of A 5bedroom Duplex. (magboro, Ogun State) (3143 Views)
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 8:53pm On Feb 12, 2021 |
Day 3 progress
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 8:55pm On Feb 12, 2021 |
![]() Moving to Lintel level in a bit. Rain couldn't stop us.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 8:57pm On Feb 12, 2021 |
close of work.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 9:00pm On Feb 12, 2021 |
We offer design and build services. Contact us for more info raymondfubara@gmail.com 09056082348(call & WhatsApp) |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by abcivilengr(m): 10:40pm On Feb 12, 2021 |
Just get ready for cracks in the future... The cantilever reinforcement and detailing was wrong.... It is unfortunate today that everyone is an engineer and builder.. |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 9:03am On Feb 13, 2021 |
abcivilengr:The pictures didn't do justice Lol structural drawings properly followed. Structural drawings done by a COREN Registered Engineer. The cantilever in question is not load bearing, it's a balcony for the master's bedroom 5m long x 1.2m. Hidden beams Y16(6nrs T&B) and we have both horizontal and vertical. Most of us here are qualified builders. I have a certificate in quantity surveying and Civil engineering . |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by HORLADSTAR(m): 11:37am On Feb 13, 2021 |
Nice work here |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by Amastermovic(m): 1:57pm On Feb 13, 2021*. Modified: 2:13pm On Feb 13, 2021 |
raymondFirstborn:There's nothing like hidden beam and the cantilever does not satisfy code requirements . Truly you may follow the drawing but its wrong and satisfied by a coren registered engr is not a rule. Reason he's trying to play safe with the hidden . he could have drop the beam and POP it underneath or satisfy the code requirements for the cantilever slab by returning the bar appropriately. I get he's trying to save cost by not wanting you to break the slab behind by almost 50℅ . Saying it's not load bearing is also bending the rules oo By the way clean job following |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 2:31pm On Feb 13, 2021 |
Amastermovic:The structural engineer specified we break 700 - 750mm in. Which is what we did. Then as per "hidden / concealed beam" , it's widely used globally and recognized by all construction regulatory Bodies. Hidden beams carry the same depth as the slab and proper calculations have been done in this case. |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 2:36pm On Feb 13, 2021 |
Today's progress
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 2:37pm On Feb 13, 2021 |
Moving towards 9coaches
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by Amastermovic(m): 2:45pm On Feb 13, 2021 |
raymondFirstborn:Following like I ve said for us not to derail this journal. How much is block and cement along that axis |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 2:50pm On Feb 13, 2021 |
Amastermovic:Block is 220(depends on your bargaining power) - 240 ![]() Cement is 3100 |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 12:16pm On Feb 16, 2021 |
Update
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 12:17pm On Feb 16, 2021 |
Lintel level
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 2:23pm On Feb 16, 2021 |
Moving. Lintel level.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 6:34pm On Feb 17, 2021 |
Woodwork
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 6:39pm On Feb 17, 2021 |
Moving forward.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 6:47pm On Feb 17, 2021 |
Front view. Evening
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by PyroDavid: 7:14pm On Feb 17, 2021 |
The master's bedroom is at the back? |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 9:02pm On Feb 17, 2021 |
PyroDavid:Yes it is |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 3:17pm On Feb 19, 2021 |
Front view taking shape
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 12:49am On Feb 26, 2021 |
Been a little busy. Work Progress. Moving to parapet stage.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 12:51am On Feb 26, 2021 |
Current stage. PARAPET woodwork Meanwhile we are trying modify a few details.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by mufutau55(m): 5:45am On Feb 27, 2021 |
I will surely really love to see the 3D of the building. Thank you. Hajji M. |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 11:54am On Feb 27, 2021 |
mufutau55:Ok would be posting it soon. |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 11:56am On Feb 27, 2021 |
Side view ND stirrups.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 1:02am On Mar 01, 2021 |
. |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 6:03pm On Mar 02, 2021 |
Parapet done.
|
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by PyroDavid: 8:37pm On Mar 02, 2021 |
This a concrete facial if my eyes aint deceiving not parapet Modified: so, it can also be called a parapet? |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by raymondFirstborn(op): 10:20pm On Mar 02, 2021 |
PyroDavid:It's a concrete facial. But layman language "parapet" |
| Re: Construction Of A 5bedroom Duplex. (magboro, Ogun State) by EgunMogaji2: 10:52pm On Mar 02, 2021 |
This is making me uneasy but I’m sure it’s been engineered sha.
|
Construction Of A 5bedroom Duplex With A 1Bedroom Apartment Lekki/ajah Lagos • Construction Of A 5bedroom Bungalow With Pent@Ado-Ekiti • Construction Of A 5bedroom Bungalow @kwara • 2 • 3 • 4
40ft Shipping Container For Sale In Lagos At Affordable Price • A Plot Of Land For Sale At ADIVA PLAINFIELDS • Plots Of Land At Abibu oki estate Abijo Ajah For Sale

close of work.