₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,327,561 members, 8,431,562 topics. Date: Monday, 22 June 2026 at 01:23 PM

Toggle theme

The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra - Properties (8) - Nairaland

Nairaland ForumNairaland GeneralPropertiesThe Making Of The "Contemporary 6 Bedroom Duplex " In Anambra (58219 Views)

1 2 3 ... 5 6 7 8 9 10 11 ... 28 Reply (Go Down)

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:12am On Feb 15, 2021
JerrCa:
Thanks bro for the quote! I appreciate
Thank you Sir.
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:24am On Feb 15, 2021
We will start lifting blocks onto this decking as from this morning, while sourcing for more blocks, more pictures from this site later.
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 11:14pm On Feb 15, 2021
Lifting blocks to the top of this decking.........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 11:17pm On Feb 15, 2021
We plan to clear a portion of the compound and start a security man house in this compound by tomorrow.........
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:07am On Feb 17, 2021
The back of this house.......

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 9:19am On Feb 18, 2021
We have started forming the walls of this house........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 9:21am On Feb 18, 2021
More.....

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 9:25am On Feb 18, 2021
Buying more vibrated blocks this morning.......

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by Attah00002(m): 1:22pm On Feb 18, 2021
Morning sir.thanks so much for the great work
and your intensive contribution to property section sir.
Your pikin are following sir.


I have one question I want to ask sir.
I have been following your thread for some time now sir.
In the pic below,you use 3 block after the lintel(beam) before the decking(first floor slab) but some other thread you use 2 block after the lintel before the decking.
WHY?

Thank you sir.

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by Attah00002(m): 1:33pm On Feb 18, 2021
Attah00002:
Morning sir.thanks so much for the great work
and your intensive contribution to property section sir.
Your pikin are following sir.


I have one question I want to ask sir.
I have been following your thread for some time now sir.
In the pic below,you use 3 block after the lintel(beam) before the decking(first floor slab) but some other thread you use 2 block after the lintel before the decking.
WHY?

Thank you sir.
I mean this thread


https://www.nairaland.com/1907636/port-harcourt-luxury-flats/7

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 9:02am On Feb 19, 2021
Attah00002:
Morning sir.thanks so much for the great work
and your intensive contribution to property section sir.
Your pikin are following sir.


I have one question I want to ask sir.
I have been following your thread for some time now sir.
In the pic below,you use 3 block after the lintel(beam) before the decking(first floor slab) but some other thread you use 2 block after the lintel before the decking.
WHY?

Thank you sir.
Clients preference. In most of the drawings I have built, the specifications always reads 2 blocks before the decking beam, but a lot of home owners are now loving an additional 300 mm on the top of their building plans and we have to give them what they want, as long as it's structurally safe to do so.

But remember, the clients will always pay for the difference in the additional line of blocks with workmanship. Note also that this have a few more implications in the finish, cost of finish materials and workmanship will rise up slightly.
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:34pm On Feb 20, 2021
We have continued to raise the block walls of this house.........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:48pm On Feb 20, 2021
Lobby..........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:49pm On Feb 20, 2021
Walking upstairs.........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:54pm On Feb 20, 2021
More from upstairs........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op):
Balconies........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 10:08pm On Feb 20, 2021
We have started digging the foundation for a security post.......

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by sonnie10: 8:44pm On Feb 21, 2021
spyder880:
We bought and offloaded iron rods here at this site yesterday. My iron workers are already doing their work since yesterday, more pictures from this site later........
Did you use 16mm or 12mm for the decking? Do you remember how many pieces?
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:20am On Feb 22, 2021
sonnie10:
Did you use 16mm or 12mm for the decking? Do you remember how many pieces?
This is a very big decking and and as such, needed adequate reinforcement. We used;

16mm rods 130
12mm rods 350
10mm rods 30
8mm rods 50
Rolls of binding wire 2 1/2
We also spent up to 70k on transportation and loading charges.
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by sonnie10:
spyder880:
This is a very big decking and and as such, needed adequate reinforcement. We used;

16mm rods 130
12mm rods 350
10mm rods 30
8mm rods 50
Rolls of binding wire 2 1/2
We also spent up to 70k on transportation and loading charges.
Thank you a lot
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 8:32am On Feb 22, 2021
We return to this site today to continue our works with the upper floor.......

We will also move fast on the security man house
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by folmus: 4:51pm On Feb 22, 2021
spyder880:
We return to this site today to continue our works with the upper floor.......

We will also move fast on the security man house
Looking forward to seeing more pics
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:01pm On Feb 22, 2021
folmus:
Looking forward to seeing more pics
Certainly, there will be many more pictures from this and other sites tomorrow.
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:19pm On Feb 23, 2021
Let's start the concrete blinding for this security man house.......... we plan to start the foundation blocks by tomorrow morning.

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:22pm On Feb 23, 2021
Then we started raising the fence of this compound..........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by mixratio(m): 6:38pm On Feb 23, 2021
Chief Spyder, well-done sir.
I always enjoy your threads. very educative and straightforward.

I have a question though, on your suspended slab/decking, why did you use to spread that nylon?
Asides from preventing leakage of concrete, does it have any other advantages?
thanks
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:07pm On Feb 23, 2021
mixratio:
Chief Spyder, well-done sir.
I always enjoy your threads. very educative and straightforward.

I have a question though, on your suspended slab/decking, why did you use to spread that nylon?
Asides from preventing leakage of concrete, does it have any other advantages?
thanks
Apart from holding the concrete from slipping through the cracks, the nylon performs a few other functions. First is that it helps to prevent early water loss in the concrete slab cast, prolonging moisture retention, thereby helping the curing process of the slab. Another advantage is that it preserves my wood. When I use nylon to separate the wood and the raw cast, it tends to prolong the durability of the wood, making it possible for me to reuse the wood.
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by mixratio(m): 4:48pm On Feb 24, 2021
spyder880:
Apart from holding the concrete from slipping through the cracks, the nylon performs a few other functions. First is that it helps to prevent early water loss in the concrete slab cast, prolonging moisture retention, thereby helping the curing process of the slab. Another advantage is that it preserves my wood. When I use nylon to separate the wood and the raw cast, it tends to prolong the durability of the wood, making it possible for me to reuse the wood.
Thanks for your prompt response.
Making the formwork reusable was an eye opener for me
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by RobbStark(m): 12:21pm On Feb 25, 2021
spyder880:
As seen from the top of the decking...........
This stair needs to have a good anchorage at the landing deck.
Great job
Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:14am On Feb 27, 2021
Let's continue with the fence foundation and foundation blinding..........

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:18am On Feb 27, 2021
Starting work on the security man house

Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:23am On Feb 27, 2021
Back of the house, and some pictures from the top, we have completed the iron reinforcement works for the upper floors.

1 2 3 ... 5 6 7 8 9 10 11 ... 28 Reply

Contemporary 6 Bedroom Duplex Design for 50x100ftThe Making Of The "7 Bedrooms High Ceiling Bungalow" In AnambraThe Making Of The "Owerri Royal Manor"234

Japa: Canada Bans Foreigners Others From Buying HousesIs Nike Lake Resort, Enugu The Most Beautiful Hotel In Nigeria?Why Not A Central AC System? (Photos}