₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,326,957 members, 8,428,813 topics. Date: Thursday, 18 June 2026 at 02:08 AM

Toggle theme

Solarview's Posts

Nairaland ForumSolarview's ProfileSolarview's Posts

1 2 3 4 5 6 7 8 9 10 (of 31 pages)

Technology MarketRe: House Clearance Sales.. Come In Here!!!! by solarview(m): 9:53am On Apr 19
dmjinc:
@solarview can't access my mail right now.

You can make your request open here.

thank you.
The wardrobe is how much best
PoliticsRe: Nigeria Ready To Work With US, Other Countries To Wipe Out Terrorists - FG by solarview(m): 6:59pm On Nov 05, 2025
Dreal1247:

https://www.youtube.com/watch?v=HabJj8G5AWw?si=xJCnIOBwJJwR7Yit
We the true Nigerian people missed this great man. Continue to Rip sir. His thaughts came to me of recent
Technology MarketRe: House Clearance Sales.. Come In Here!!!! by solarview(m): 10:15am On Mar 03, 2025
fuckboys:
is this still available?
I have for 15k

Lagos

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 4:21pm On Feb 23, 2025
Upgrade and Revamp existing system

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 4:20pm On Feb 23, 2025
Upgrade and Revamp existing system

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op):
Before and after battery maintenance

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 3:24pm On Feb 02, 2025
10kw inverter
15kwh lithium battery

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 3:23pm On Feb 02, 2025
10kw inverter
15kwh lithium battery

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 1:19pm On Jan 30, 2025
12kw inverter
15kwh lithium battery
#Freshinstallations

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 1:12pm On Jan 30, 2025
12kw inverter
15kwh Lithium battery

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 8:59am On Jan 28, 2025
Lithium batteries SOC (state of charge) Chart

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 8:44am On Jan 28, 2025
Lithium batteries SOC (state of charge) Chart

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 8:14am On Jan 21, 2025
INVERTER MAINTENANCE.

Inverter plays a crucial role in any solar energy system that is alternating current based. Because this is the common type of system that is available, the inverter is there to convert the generated(PV) or stored(battery) direct current (DC) to Alternating current (AC) that can be used by the regular home appliances.

During the process of this conversion, the electronics components generates heat which needs to be put under control to avoid overheating. To achieve this some techniques are employed in building an inverter system, use of heat sinks, ventilation in/outlet, cooling fans, and temperature sensors etc.

The first two are kind of manual in nature especially the air vent. Every inverter owners/installers should pay attention to it, to make sure that it is not clogged by dust or debris as the case maybe. The environment where the inverter is located plays a critical role in this situation eg if it's a dusty place.
Check the inverter air vent, clean it with a dry cloth or brush as the case maybe. You may have to put off the inverter before cleaning it. This is necessary to avoid the temperature sensors shutting down your inverter once over temperature is detected and this can lead to inverter malfunction and power interruption.

Check out the below photos to have a clue.

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 8:11am On Jan 21, 2025
INVERTER MAINTENANCE.

Inverter plays a crucial role in any solar energy system that is alternating current based. Because this is the common type of system that is available, the inverter is there to convert the generated(PV) or stored(battery) direct current (DC) to Alternating current (AC) that can be used by the regular home appliances.

During the process of this conversion, the electronics components generates heat which needs to be put under control to avoid overheating. To achieve this some techniques are employed in building an inverter system, use of heat sinks, ventilation in/outlet, cooling fans, and temperature sensors etc.

The first two are kind of manual in nature especially the air vent. Every inverter owners/installers should pay attention to it, to make sure that it is not clogged by dust or debris as the case maybe. The environment where the inverter is located plays a critical role in this situation eg if it's a dusty place.
Check the inverter air vent, clean it with a dry cloth or brush as the case maybe. You may have to put off the inverter before cleaning it. This is necessary to avoid the temperature sensors shutting down your inverter once over temperature is detected and this can lead to inverter malfunction and power interruption.

Check out the below photos to have a clue.

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 3:26pm On Jan 18, 2025
Quality Products+Quality service+Good system management= Great Solar Energy Experience.


Fridge/Freezer daytime
Washing machine
Water pump
TV, lights
Fans are covered.
Small/medium flat/apartment

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 3:22pm On Jan 18, 2025
Quality Products+Quality service+Good system management= Great Solar Energy Experience.


Fridge/Freezer daytime
Washing machine
Water pump
TV, lights
Fans are covered.
Small/medium flat/apartment

AutosRe: Towing Vehicle Needed by solarview(m): 11:03am On Jan 18, 2025
Why not add to the money and use it to fix the vehicle. Towing to Delta may be hell expensive.
Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 11:06am On Jan 15, 2025
Importance of Battery maintenance.

If you use Flooded Lead Acid/Tubular battery. The battery requires maintenance which entails topping up with distilled water to keep it in optimal condition and to last longer.

Usually the frequency of maintenance depends on many factors like, battery brand, the ambient temperature around the battery. Charge and discharge current/the usage etc

The first top up may be due between eight to 12months of its installation. After then it is advisable to do it quarterly or at least once in six months.

The process involved using distilled water to gauge each cell compartment of the battery(usually 6 cells for the common 12volts battery). Also cleaning of the battery vent and terminals where it applies.

There is usually an indicator that shows when the battery electrolyte is getting low.

Points to note:
* Ensure that all the battery 6 cells are gauged.
* Use distilled water to top up.
* Tighten any loose terminal

For more helps O7O6939933O

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 10:57am On Jan 15, 2025
Importance of Battery maintenance.

If you use Flooded Lead Acid/Tubular battery. The battery requires maintenance which entails topping up with distilled water to keep it in optimal condition and to last longer.

Usually the frequency of maintenance depends on many factors like, battery brand, the ambient temperature around the battery. Charge and discharge current/the usage etc

The first top up may be due between eight to 12months of its installation. After then it is advisable to do it quarterly or at least once in six months.

The process involved using distilled water to gauge each cell compartment of the battery(usually 6 cells for the common 12volts battery). Also cleaning of the battery vent and terminals where it applies.

There is usually an indicator that shows when the battery electrolyte is getting low.

Points to note:
* Ensure that all the battery 6 cells are gauged.
* Use distilled water to top up.
* Tighten any loose terminal

You can contact us for maintenance service O7O6939933O

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 3:05pm On Jan 14, 2025
Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 3:03pm On Jan 14, 2025
vinmayo:
Please how much should one budget for 5-6kva solar system? I also need to know the maintenance cost
You can reach us on WhatsApp O7O6939933O, there are some questions we need to ask you. Because we don't just do solar but the one that will serve you well.
Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 11:11am On Jan 13, 2025
Harmattan dust can reduce your solar power generation capacity, especially if you live close to a major road or construction sites. You could arrange for solar panels cleaning or washing to have a better performance.

Before and after washing pictures

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 10:59am On Jan 13, 2025
Harmattan dust can reduce your solar power generation capacity, especially if you live close to a major road or construction sites. You could arrange for solar panels cleaning or washing to have a better performance.

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 8:59pm On Jan 09, 2025
If that is above your budget, then go for the nearest to it, but I will advise you maintain that inverter capacity, also you'll engage energy management.
Shalom
cc Mcslize
FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 6:56pm On Jan 09, 2025
Mcslize:
Good day. Please, I am thinking of installing a mini solar that can power one 1.5 horse power inverter AC and a middle sized fridge, 2 standing fans, TV, laptop and some energy saving bulbs.

How many KVA solar system do you think can power this load?
Good day.
Do a 6KWP PV
5/6KW inverter
15KWH lithium battery or 8Tubular battery setup
To enjoy your AC.
Thanks
Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 6:01pm On Jan 08, 2025
How time flies. This 2KW Solar energy system was installed January 2018. That's 7years ago.

It comprises;
250Watts Polycrystalline.PV 8units
2.5kva pure sine wave inverter
50A PWM charge controller 2unit
200AH wet cells battery (produced in Nigeria)

The Technology Trends

Typically you could find such system configurations those days. Talking about Poly Crystalline PV which have mostly been overshadowed by Mono Crystalline PV with advanced technology, higher capacity as well as greater efficiency. 250/260Watts was sometimes the highest single PV module that you could find available in Nigeria then. But now we're are almost hitting 1000Wattage single PV module that are reasonable enough in size/weight compared to their outputs/wattage.

Those Batteries in the picture are flooded/wetcell type. They were made in Nigeria then by a Nigerian company but we never took time to develop the technology and to improve on it and as such, the Indian people took over and dominated that battery technology and advanced it to today's Tall Tubular batteries which have become the second most sort after to Lithium batteries that have Chinese dominance. Imagine Nigeria had continued in that trajectory by now the story would have been to our economic advantage.

The PWM charge controllers have been taken over by MPPT charge controller which has better efficiency and are mostly incorporated in manufacturing hybrid inverters that are found nowadays. These technologies are mostly Chinese and Indian as well.

....

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 5:25pm On Jan 08, 2025
How time flies. This 2KW Solar energy system was installed January 2018. That's 7years ago.

It comprises;
250Watts Polycrystalline.PV 8units
2.5kva pure sine wave inverter
50A PWM charge controller 2unit
200AH wet cells battery (produced in Nigeria)

The Technology Trends

Typically you could find such system configurations those days. Talking about Poly Crystalline PV which have mostly been overshadowed by Mono Crystalline PV with advanced technology, higher capacity as well as greater efficiency. 250/260Watts was sometimes the highest single PV module that you could find available in Nigeria then. But now we're are almost hitting 1000Wattage single PV module that are reasonable enough in size/weight compared to their outputs/wattage.

Those Batteries in the picture are flooded/wetcell type. They were made in Nigeria then by a Nigerian company but we never took time to develop the technology and to improve on it and as such, the Indian people took over and dominated that battery technology and advanced it to today's Tall Tubular batteries which have become the second most sort after to Lithium batteries that have Chinese dominance. Imagine Nigeria had continued in that trajectory by now the story would have been to our economic advantage.

The PWM charge controllers have been taken over by MPPT charge controller which has better efficiency and are mostly incorporated in manufacturing hybrid inverters that are found nowadays. These technologies are mostly Chinese and Indian as well.

....

Technology MarketRe: 10years Anniversary On Nairaland And As Solar Engineer. by solarview(op): 8:29am On Jan 04, 2025
Grateful for 2025

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op):
Love800:
Whats the difference between training and certification?
Training= practical/hands on learning eg Apprenticeship to gain mastery and expand your skills. While certification is like an endorsement or Approval a testimonial/certificate you can receive from a regulatory/professional body after you have passed some series of tests/exams according to their lay down standards
FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 8:11am On Jan 04, 2025
Grateful

FamilyRe: 10years Anniversary On Nairaland And As A Solar Engineer by solarview(op): 2:52pm On Jan 03, 2025
MALIGNANTHost:
Congratulations
Thank you

1 2 3 4 5 6 7 8 9 10 (of 31 pages)