Tobi197's Posts
Nairaland Forum › Tobi197's Profile › Tobi197's Posts
1 (of 1 pages)
I want to open a welding shop in Lagos, can someone advice me if it is a something that can bring in money that will sustain me 1. What do I need to start the business 2. how much can I expect at monthly and or yearly 3. What other information do I need to know 4. Source of materials and the demands. Thanks tobi197@yahoo.com |
I want to open a welding shop in Lagos, can someone advice me if it is a something that can bring in money that will sustain me 1. What do I need to start the business 2. how much can I expect at monthly and or yearly 3. What other information do I need to know 4. Source of materials and the demands. Thanks tobi197@yahoo.com |
Why is the use of Inter-Locking Bricks not popular in Nigeria? It is easy, lighter than formal cement brick, quick and affordable and yet not being used as widely as in other Countries. Can someone educate me on this. thanks |
You don't have to read more meaning into the gesture than necessary. This is welcoming good natured symbol of tradition |
Guys, My builder gave me this estimate just for decking of a four (4) flat/three bedroom(3bdroom). Two (2up)/two (2down) and I believe it is too much for just the decking. I have done the lintel already. Advice is appreciated. Thanks y'all S/N DESCRIPTION QUANTITY RATE AMOUNT 1 Blocks 500 150 75, 000 2 Masonry work for the blocks 500 50 25, 000 3 Pieces of 2x3x12 wood 350 400 140, 000 4 Pieces of 1x12x12 board 530 1, 400 742, 000 5 Pieces of Bamboo 1, 250 200 250, 000 6 Carpentry workmanship on slab & beam - - 250, 000 7 Lengths of 16mm iron bars 78 2, 400 182, 200 8 Lengths of 12mm iron bars 355 1, 200 426, 000 9 Length of 10mm iron bars 486 1, 000 486, 000 10 Rolls of Binding wires 6 7, 000 42, 000 11 Bags of Nails 7 5, 000 35, 000 12 Iron Benders Workmanship - - 200, 000 13 Load of 30 tones of granite 3 130, 000 390, 000 14 Load of 20 tones of sand 6 60, 000 360, 000 15 Bags of cement 247 1, 650 407, 550 16 Casting of slabs & beams - - 250, 000 17 Bundles of 20mm PVC electrical pipes 15 2, 500 37, 500 18 Packets of 20mm couplers for electrical pipes 5 900 4, 500 19 Packets of 20mm 4 way boxes for electrical pipe 2 1, 000 2, 000 20 Electrician workmanship - - 50, 000 21 Cash on site with handling of materials to site - - 100, 000 22 TOTAL 4, 454, 750 |
Those who cannot remember the past are condemned to repeat it in the future. |
1 (of 1 pages)