No work on site yesterday.2X4x12 X50 @450= #22500 + transportation #5,000 = #27,500 4" nail 1 bag @ #5000.
|
![]()
|
![]()
|
pictures.
|
today's pictures.
|
No work was done today and the person to take the pictures of what was done yesterday isn't around. Monday we shall all have some pictures to enjoy ![]()
|
spyder880: Thank you bros, you are really doing something great here. Loving it so much.You are welcome and thank you too for your contributions. |
spyder880: Depends on you, if you have the time and knowledge then you can buy and give to the builder. The stress is on the knowledge. But this sometimes saves the builder the hassles of explaining why some faults happened with the construction, he cannot be blamed for faulty materials if the owner is the one that bought. Depending on a lot of other factors sha.Thanks.That is why you are the best. |
blank: I have a question.MY THINKING IS IF YOU WANT THE BEST BETTER BUY IT YOURSELF AND I DON'T WORRY IF SOME GETS MISSING.(YOU HAVE TO KEEP YOUR EYES ON IT). THANKS. |
blink182: WonderfulTHANKS AND I HOPE YOU ARE ENJOYING AND LEARNING FORM THE BEST (spyder) ![]() |
spyder880: I guess these wood are 12ft in lenght? Because some saw mills cut 2x4 in 18ft sizes which will change the overall estimated quantity. Well done.YES IS 12FT. THE PRICE IS THE BEST I COULD FIND AROUND. THANKS FOR YOUR KIND WORDS. MY PHOTO GUY ISN'T AROUND TODAY BUT WORK IS GOING ON SITE. THANKS. |
more tomorrow or next
|
more!!
|
more!
|
roof work
|
more pictures tomorrow!!
|
some Carpentry work
|
more pictures later in the week.
|
after painting
|
more
|
woods!!!
|
Wood for the roofing akun, 2x4X12 #450 x 340 = #153,000 2x6X12 #750 x 80 = #60,000 3x4X12 #700 x 20 = #14,000 2x2X12 #250 x 400 = #100,000 4"Nails #450X2 = #9000 + 1 bag #5000 =#14000 3" 1/2 #2250 Some chemicals to paint the wood before using =#24,100 + kerosene @#135 per liter x 65 liters = #8775 Transportation #30,000 Total #406,125
|
jobontech: MAIN FUTUREShello there,i will like to know why you think everybody should be calling you to know your price and what if i call you and your price isn't good for me? i think many people have the same view so do yourself a favor and paste your price. thanks |
blank: How much will a reasonable size gate cost?check this out https://www.nairaland.com/716689/fence-gates-pictures-prices |
spyder880: Awesome! Bros, welcome to the builder's club because you over qualify sef :Dlovely breakdown of figures. ![]() |
trust101: The cost breakdown should be ready by next weekPrayer :#10,000 Cleaning of land : #20,000 Food for prayer #8,000 Architectural drawing @ #35,000 Omo onile (Area boys): #40,000 Omo onile family #200,000 Pegging :#5,250 water #1200x 15 = #18,000 water #1500x 1 = #1500 Digging of foundation cant remember: #40,000 or less. Supervision of foundation digging/Architect drawing re-measuring of building @#16,000 Granite 30 tons: #130,000 Granite 34 tons: #132,000 + #3000 Omo onile =#135,000 Sharp Sand 155 tons:#316,000 Cement 120 bags: #216,000 packing of cement with transportation :#15,000 cement 50 bags @ #2070x50= #103,500 Bricklayer work from foundation/german floor/blocks setting/lintel/level =#470,000. Carpenter workmanship from foundation/german floor/lintel/level= #50,000 Iron rod 12mm 18.4lengths,rings and binding wire for pillar and casket for foundation : #36,800 Broken blocks for filling of hole before german floor with labor:#6000 Welder workmanship form foundation/lintel to 25 pillars and 23 caskets for the pillars:#25,000 Iron rod 12mm 32.5lengths for 25 pillars #1600x 32.5 = #52,000 lintel iron rod 12mm,9"rings,wire #147,000 filling sand 10 tons @ #8500 x 26 =#221,000 + soak-away sand + 10 tons on my land. packing of filling sand #1500 x 26 = #39000 Digging of soak-away #45,000 packing of soak-away filling sand #10,000 foundation 9" blocks #150 x 1500 = #225,000 Plank 1X12 @ #740 x 50 =#37,000 + transportation #3,000 = #40,000 Plank 1X12 @ #800 x 50 =#40,000 + transportation #5,000 = #45,000 Rama of filling sand before german floor #10,000. Building blocks to lintel 9"#150 x 2700 = #405,000 Block setting to level 9" @ #170 x 1400 = #238,000 Water @ #1500x 8 = #12,000 Big soak-away 9" blocks @ #170x 300 = #51,000 Small soak-away 6" block @130x 70= #9100 Cement with transportation @ #2070x 8= #16,560 Plaster sand 10 tons @ #16,000 Bricklayer/Carpenter/welder #24,000/#7,000/#6,000 = #32000 Pillars designed 5 workmanship @ #40,000 (i bought cement) Cement for pillars design @ #2070x 20 =#41,400 Wood 2x3x12 @ #350x 30 = #10,500 Tip for the bricklayer boys #15,000 Tip for carpenter boys #6,000 Electrical pipe 45,000 Electrician workmanship for laying the pipes #25,000 Transportation to the site @#50,000 Total cost:#3,743,610 Roof gutter cost breakdown, Carpenter #70,000 Wood 2x3x12 @ #290 x 80 = #23,200 Nails #10,000 Granite 15tons @ #60,000 Plank 1x12x12 @ 740 x 80 = #59,200 Plank 1x12x12 @ 740 x 20 = #14,800 Cutting to sizes:2,4,6inch #9000 + the design @60x150 #9000 = #18,000. Cutting 5 to sizes 1 and 2inch to 35 pieces @#50 = #1750 plywood 12 @ #1,700 = #20,400 Transportation #17,000 Welder #65,000 Iron rod 12mm 3.5feet x 532 = 46.55lengths@ #1750 per length = #81,462 Iron rod 12mm for beam 36lengths@ #1750 per length = #63,000 Iron rod 10mm 33lengths@ #1350 = #44,550 Drainage Pipe @#5000 Trans portion to site:#20,000 Cement @2000 X 54 = #108,000 Water @1500 X 5 = #7,500 Food for laborer @ #10,000 Casting of roof gutter laborer #60,000 Plastering the inside of the roof gutter cement 15 bags @#2,000 = #30,000 Bricklayer plastering inside of roof gutter @35,000 Water @1500 X 2 = #3,000 Plaster sand 10 tons @#16,000 sharp sand 10 tons @#25,000 Transportation to site:#7,000 Total amount spent on roof gutter is = #874,862 Total amount spent on building is = #3,743,610 Total amount spent is = #4,618,472
|