Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,163,517 members, 7,854,225 topics. Date: Saturday, 08 June 2024 at 12:45 PM

Estimate For 3 2bed Flat, Builders Pls Check. - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Estimate For 3 2bed Flat, Builders Pls Check. (680 Views)

Advise On Estimate For A 4 Bedroom Bungalow / ESTIMATE FOR BLINDING, NYLON, AND GERMAN FLOOR Could anyone provide prices pls ? / Estimate For Building A 4 Bedroom Room Duplex (2) (3) (4)

(1) (Reply) (Go Down)

Estimate For 3 2bed Flat, Builders Pls Check. by bebe2(f): 6:39pm On May 13, 2013
my builder gave me rough estimate for building 3 2bedroom flat. its for commercial purpose.(rent)

the foundation is going to be 4 blocks high.
one toilet, one bathroom and one kitchen per flat.

this is a standard flat. he is going to evplain to the architect how we want it.

2000 blocks to foundation (4 blocks high) @145each =290k

2 trip of sand -@28k each 56
8tons of granite -30k each 60k
50 bags of cement 1700, 50 naira each to carry it.- 87,500
digging the 3flat 45k
setting the 2000- 3,500per 100 blocks and 1,500 for helper= 100k

total: N638,500.

i have asked him how much he want for supervising the work, he said i shud give him wat i feel and he wud tell me if its enough or not.
how much do u think is fair for supervising up to foundation level.

are the estimate above reasonable?
Re: Estimate For 3 2bed Flat, Builders Pls Check. by bebe2(f): 10:12pm On May 13, 2013
Pls o, did is the property section.

Someone pls help
Re: Estimate For 3 2bed Flat, Builders Pls Check. by bebe2(f): 11:01pm On May 13, 2013
This is the size of the property.

Living room, 12 by 16
Bedroom , 12 by 12 each
Bath n toilet, 4 by 8
Kitchen 8 by 16.

Multiply by 3.

Tanks
Re: Estimate For 3 2bed Flat, Builders Pls Check. by onyeego(m): 11:49pm On May 13, 2013
Am a builder, I think d prices are ok.(very cheap, I would hv taken more)
But some things are missing from ur list, things like iron rods, wood,water, etc
Re: Estimate For 3 2bed Flat, Builders Pls Check. by bebe2(f): 12:15am On May 14, 2013
onye ego: Am a builder, I think d prices are ok.(very cheap, I would hv taken more)
But some things are missing from ur list, things like iron rods, wood,water, etc

Tanks for ur time.

He actually said they rent tank for 1500 per day and and fill it wit 4500.

Am shocked at the bricklayer price thot it was 2500

Pls how much o u think I shud give him to supervise the foundation ?
Re: Estimate For 3 2bed Flat, Builders Pls Check. by onyeego(m): 1:07am On May 14, 2013
It depends on alot of factors,how well he will do d job, ur relationship with him,how much u r willing to give him.

I think anything between 10-15% of his estimate would do.
that should be between 63-90k.

Don't forget to wire my own pay, as I have become ur consultant grin
Re: Estimate For 3 2bed Flat, Builders Pls Check. by bebe2(f): 11:24am On May 14, 2013
onye ego: It depends on alot of factors,how well he will do d job, ur relationship with him,how much u r willing to give him.

I think anything between 10-15% of his estimate would do.
that should be between 63-90k.

Don't forget to wire my own pay, as I have become ur consultant grin

Lol, no worry na container I go take carry ur own come. Tnk u

(1) (Reply)

Interlocking Stabilized Compressed Clay Bricks For Construction / Advice Needed On A Flood Prone House ASAP / AB Logistics Is The Answer To Your Delivery Issue

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 13
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.