KC SYSTEMS LTD Follow me as I embark on the construction of two fully detached buildings(detached 5bedroom duplex and detached 3bedroom flats) on a standard plot. Procedures, site progress report and pictures will be attached on this thread on a regular basis for your use. Questions will be entertained. Location; Journalist estate at Arepo Duration; 8 months Attached are some copies of Architectural plans. Thank you Chuks
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 7:48am On Aug 09, 2013 |
Attached is the second building Architectural drawing plans, detached 3bedroom flats. The construction started 29 of July 2013 which was last week, details and pictures will be attached soon 1 Share
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 1:09pm On Aug 11, 2013 |
KC SYSTEMS LTD Progress of work so far: Excavation works completed 1 Share
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Topselg: 3:11pm On Aug 11, 2013 |
We are into Electrical and Plumbing installation ELECTRICAL INSTALLATION Our Installations include but not limited to; Conduit System of wiring Surface wiring Trunking system of wiring Low voltage electrical panels Change over panel, Gear switch Installation of light fittings and accessories Inatallation of Lightning Arestor Power auditing Electrical Design Preparation of Bill Of Engineering Measurement and Evaluation(BOQ) Maintenance Work PLUMBING INSTALLATION Our plumbing installation include but not limited to; Running of waste and water supply pipes using: Pressure pipe Henco pipe, tigre pipe, Technogreen pipe Installation of water closet(WC) Installation of Wash Hand Basin Water heater Installation of tanks Plumbing Design Maintenance work Contact us today through our E-mail Address: topselg.engineering@gmail.com Mobile number: 08178904519 |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Topselg: 3:11pm On Aug 11, 2013 |
We are into Electrical and Plumbing installation ELECTRICAL INSTALLATION Our Installations include but not limited to; Conduit System of wiring Surface wiring Trunking system of wiring Low voltage electrical panels Change over panel, Gear switch Installation of light fittings and accessories Inatallation of Lightning Arestor Power auditing Electrical Design Preparation of Bill Of Engineering Measurement and Evaluation(BOQ) Maintenance Work PLUMBING INSTALLATION Our plumbing installation include but not limited to; Running of waste and water supply pipes using: Pressure pipe Henco pipe, tigre pipe, Technogreen pipe Installation of water closet(WC) Installation of Wash Hand Basin Water heater Installation of tanks Plumbing Design Maintenance work Contact us today through our E-mail Address: topselg.engineering@gmail.com Mobile number: 08178904519 |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 2:09am On Aug 13, 2013 |
KC SYSTEMS LTD, Progress of works so far; 1) Placement of reinforced mat and erection of starter bars completed 2] Foundation concrete works completed
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 11:25pm On Aug 13, 2013 |
KC SYSTEMS LTD Progress of works so far; 1) Placement of reinforced mat and Attention of starter bars completed 2] Foundation concrete works completed
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by archidon(m): 12:22am On Aug 14, 2013 |
Archidon ent. |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by archidon(m): 12:25am On Aug 14, 2013 |
KC SYSTEMS LTD, Progress of works so far; 1] Excavation works completed 2] Foundation works on foundation completed 3] Blocks on foundation in progress |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 12:03pm On Aug 14, 2013 |
KC SYSTEMS LTD Progress of works so far; 1) Placement of reinforced mat and Attention of starter bars completed 2] Foundation concrete works completed
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 12:56am On Aug 15, 2013 |
KC SYSTEMS LTD Progress of works so far; 1) Foundation blocks work in progress
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 8:44am On Aug 16, 2013 |
KC SYSTEMS LTD |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 8:44am On Aug 16, 2013 |
KC SYSTEMS LTD.
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Topselg: 3:44pm On Aug 16, 2013 |
KCSYSTEM: CAN WE BE THE ELECTRICAL AND MECHANICAL CONTRACTOR FOR THIS PROJECT? WE WILL DELIVER A GOOD JOB. THANKS |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 12:53pm On Aug 17, 2013 |
Hello Topselg, For this project their is a contractor handling the M and E. If you don't mind you can send your details for other projects. |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Topselg: 1:00pm On Aug 17, 2013 |
kcsystems: Hello Topselg, Thanks, I will appreciate it if can invite us for your future project. My contact details; topselg.engineering@gmail.com Mobile number: 08178904519 |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by segcymoor(m): 10:12pm On Aug 17, 2013 |
Weldone guy! |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 6:31pm On Aug 18, 2013 |
Thanks |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 9:42am On Aug 21, 2013 |
KC SYSTEMS LTD Our followers do bear with us back filling is in progress due to the sloppy nature of the site there is need to fill the shallow areas of the site as well in order to avoid water settlement on the site. Thank you 1 Like
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 9:28am On Sep 03, 2013 |
KC SYSTEMS LTD, Quite a while, progress works on site had gone quite far; 1) Sand filling and compaction work in sub-structure completed 2) Hardcore placement completed See attached pictures Thank you
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by esoorita: 9:19am On Sep 04, 2013 |
kcsystems: KC SYSTEMS LTDI'm indeed very pleased to see your building project showcased on Nairaland as it's only a couple of builders that have been brave enough to build live on this forum. I deliberately used the word brave in the sense that when you carry out a building project on Nairaland, probing questions will be asked, different opinions will be expressed rightly or wrongly and you will be expected to provide answers to the questions. What is the cost of each of the buildings please? Kindest regards. |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 10:24am On Sep 04, 2013 |
esoorita: Thanks for your kind remarks and encouragement well no fix cost was budgeted for this project. From a professional point view an estimate cost for each buildings is at these ranges 5bedrm duplex from 25m-35m while 3Flats from 25-30m depending on the finishing to be used. |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 10:31am On Sep 04, 2013 |
KC SYSTEMS LTD Progress of work so far; 1) First stage plumbing work completed 2) Floor slab concrete work in progress
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 10:49pm On Sep 05, 2013 |
KC SYSTEMS LTD Progress of works so far Floor slab concrete work completed 1 Like
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 9:51am On Sep 06, 2013 |
KC SYSTEMS LTD Progress of work so far; Floor slab concrete work completed
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 10:14am On Sep 06, 2013 |
Block works on floor slab in progress
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 1:07pm On Sep 08, 2013 |
KC SYSTEMS LTD Progress of work so far Block work to lintel level still in progress
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 10:12am On Sep 13, 2013 |
KC SYSTEMS LTD Progress of work so far; Block work to lintel level completed
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by MrP7: 8:55pm On Sep 13, 2013 |
Hi , please can we have breakdown of costs per item . Thank you |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by oladele007: 7:12pm On Sep 24, 2013 |
a good plastering and bricklayer needed in ogijo near ikorodu. |
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 12:15pm On Oct 05, 2013 |
KC SYSTEMS LTD Due to some reason beyond our control site work was suspended. Now am back thanks for your patience. Project management implies that we reduce cost of work to the bearest minimum as possible we then decided to start with the 3bedroom flats first later after three weeks time I move to the duplex where after some building materials will be re-used especially the wooden planks Progress of work so far; 1) Lintel concrete work completed 2) Block work to roof slab level completed 3) Slab formwork in progress See attached pictures bellow;
|
Re: Construction Work In Progress,two Detached Buildings On A Plot@journalist Estate by Nobody: 1:42pm On Oct 07, 2013 |
KC SYSTEMS LTD Progress of work; 1) Form work in progress 2) Reinforcement work in progress
|
Building A 3 Bedroom Flat In Benin City / How Wayo Real Estate Companies Sell The Same Plots To Different People / Finishing Our Building In Benin (a New Dimension To Nigerian Architecture)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 34 |