Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,195,105 members, 7,957,138 topics. Date: Tuesday, 24 September 2024 at 07:48 AM |
Nairaland Forum / Nairaland / General / Properties / Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow (25294 Views)
From Foundation To Completion, Pictures Of What We Built For A UK Based Client / A Nairalander's Building Project -from Foundation To Plastering / Urgent Inquiry On Cost Of Building A 4 Bedroom Duplex From Foundation Level (2) (3) (4)
Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by oyewalesamuel: 8:50am On Apr 18, 2015 |
Dear Learned intellectuals in the house, Am at the point of starting a new project, its a 4 bedroom bungalow all room ensuit with ante room, the floor plan is attached, please I need a reasonable quotation for what it will cost from foundation to roofing level. please I will appreciate it if the quotation can be very detail like the number of blocks, cement and other material require and there price first for the foundation and the block work.[color=#000099][/color]Thanks in anticipation. 2 Shares
|
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by rogermilar(m): 9:56am On Apr 18, 2015 |
Ok, u can send ur email address to me, so I can inbox u d bill. 08061256650. |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by oyewalesamuel: 11:26am On Apr 18, 2015 |
Thanks,my email is gbolahan405@yahoo.com |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by peggywebbs(f): 2:04pm On Apr 18, 2015 |
I have an intention to embark on a similar project... Kindly send me an estimate to my email. peggywebbs@hotmail.com |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by bal2012002(m): 2:32pm On Apr 18, 2015 |
pls i would also appreciate the quotation and possibly the design/plan as i am planning same bal2012002@yahoo.com many thanks |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Venom104: 2:36pm On Apr 18, 2015 |
bal2012002: Location?? |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by bal2012002(m): 2:40pm On Apr 18, 2015 |
Venom104:port harcourt and warri 1 Like |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Venom104: 2:47pm On Apr 18, 2015 |
bal2012002: Will Email you shortly |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by bal2012002(m): 2:53pm On Apr 18, 2015 |
Venom104:big thanks |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by eghosajohnny: 4:16pm On Apr 19, 2015 |
Here's the quote for the different states as I just want to post it here so you can see and others on nairaland too. 9inches blocks for foundation 1,700 @ 160. = 272,000 6inches blocks to roof level, 2,600. @130, = 338,000 trucks of laterite, 25, @10,000 = 250,000 Sand for setting, 12. @8,500 = 102,000 Granite, 20,tons@4,400 = 88,000 Cement, 80bags @1,900 = 152,000 12mm rod, 30,lent @1,300= 39,000 Stirrups, 20,lent @ 700= 14,000 1x12x12 planks, 40len. @ 700= 28,000 General labour, 500,000:00 Supervision, 120,000:00 Total, 1,903,000:00 This quote is for a place like ibadan but for porthacourt like 350,000 should be added to it and for other states these are the materiial quantity but if you a builder you can then arrange that You can call these numbers 07014709098 07031886484 1 Like
|
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by oyewalesamuel: 5:30am On Apr 20, 2015 |
Thanks John, this is very helpful,@Venom104:still waiting for you quotation as promise, my email again is gbolahan405@yahoo.com |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Nobody: 11:06am On Apr 20, 2015 |
oyewalesamuel: though your floor plan is not clear, but find below cost of a four bedroom bungalow from start to finish and attached is a sample plan. cc: peggywebbs , bal2012002 The Cost of the Four bedroom bungalow 1. foundation 1,120,471.2 2.block and concrete works 913,919.2 3.timber roof members and roof tiles 1,145,583.2 4.doors 403,200 5.aluminium window 156,384 6.plaster of paris(p.o.p) 496,800 7. tiles 613,944 8.plastering and dressing 173,664 9.soil and waste pipe 19,584 10.water supply pipes 55,209.6 11.electrical conduit pipes and boxes 73,152 12.sanitary fittings 128,635.2 13.electrical wiring 132,120 14.painting 169,293.6 15.electrical fittings 54,907.2 16.septic tank and soakaway 111,240 17. inspection chambers 11,808 18.soil drain 15,552 Total is 5,795,467.2 naira only. 5 Likes
|
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by oyewalesamuel: 1:05pm On Apr 20, 2015 |
Many thanks segzy |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Nobody: 6:27pm On Apr 20, 2015 |
oyewalesamuel: you are welcome |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by darenyx(m): 6:46pm On Apr 20, 2015 |
eghosajohnny: For a 4 bedroom bungalow?? Or just the foundation??.. cos for a place like warri or port-harcourt... that would be grossly inadequate especially in warri.. |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by eghosajohnny: 1:28pm On Apr 21, 2015 |
darenyx: I stated an additional amt for areas u mentioned 1 Like |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by pinetulips(m): 9:27am On Apr 23, 2015 |
segzy14: I love the building plan on Your signature. I would love a detailed copy sir. Either in soft copy Nd the original builders paper with detailed dimensions 7fece563. cleverjap@gmail.com |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by peggywebbs(f): 9:36am On Aug 25, 2015 |
Thanks alot |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by B2cplatform(f): 12:05am On Nov 27, 2015 |
@segzy I will need the same pplan for four bedroom bungalow ensuitte as you indicated in the tread. my email is ajibola35@gmail.com |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Isaac393l: 9:55am On Aug 14, 2016 |
bal2012002:
|
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Marshiro(m): 4:04pm On Aug 14, 2016 |
@ segzy14 I will like u to inbox the quotations and the full plans to my email harbeyakins@gmail.com cos am about to embark on a similar project in ibadan |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by knick(m): 6:17pm On Jan 15, 2019 |
Hello @ segzy14 please I'm very much interested in the recent cost estimate of the same plan 4 bedroom bungalow, location Asaba. Thanks. nckodig@gmail.com |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by ak22(m): 6:30pm On Jan 15, 2019 |
rogermilar: Please Mr Rogermilar copy me too My location is Ibadan |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Nobody: 6:50pm On Jan 15, 2019 |
knick: The quote will be from foundation to roofing. I hope the plot is a dry land. |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by ak22(m): 9:32pm On Jan 15, 2019 |
segzy14: Copy me too sir akiniyi22@gmail.com Ibadan |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by knick(m): 12:13am On Jan 16, 2019 |
segzy14:Yes from foundation to roofing hence its a dry land. Thanks. |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Muyi002(m): 8:32am On Mar 23, 2019 |
Hi Guys, Please this is my plan and proposed building can you assist with what the cost of building will be from foundation to lintel level. 2 Likes
|
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by edward2018(m): 8:46am On Mar 23, 2019 |
Muyi002: Location pls |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by edward2018(m): 8:56am On Mar 23, 2019 |
oyewalesamuel: Pls sir can you email me the detail plan, the one here is not clear enough. tunwardprojectconsult@gmail.com |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Muyi002(m): 5:25am On Mar 25, 2019 |
edward2018:Location is Ilorin |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by Nobody: 8:12am On Mar 25, 2019 |
ak22: knick: Check this link https://www.nairaland.com/5076618/4-bedroom-bungalow-enquiries-design[/https://www.nairaland.com/5076618/4-bedroom-bungalow-enquiries-design |
Re: Cost From Foundation To Rooofing Level For A 4 Bedroom Bungalow by slimshegsy(m): 5:21pm On Feb 20, 2021 |
Muyi002:Please can you share the plan with me please? Shegselove2k4@yahoo.com |
Building Collapses In Bariga, Lagos / Etisalat NG Is Proposing To Build Mast On My Land / BREAKING!!! Real Estate Developer Disappears After Getting This Email From Me!
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36 |