Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,867 members, 7,810,299 topics. Date: Saturday, 27 April 2024 at 06:21 AM

Eko Disco Targets 20% Annual Generation Growth To 1000mw In 2020 - Business - Nairaland

Nairaland Forum / Nairaland / General / Business / Eko Disco Targets 20% Annual Generation Growth To 1000mw In 2020 (593 Views)

Naira Overvalued By 20%, Says IMF / CBN Targets N200/$ Parallel Market Rate / Nigeria Targets N138bn Annual Income From Cashew Export (2) (3) (4)

(1) (Reply)

Eko Disco Targets 20% Annual Generation Growth To 1000mw In 2020 by winterfell007(m): 4:03pm On Jun 06, 2015
Eko Electricity Distribution Company (Eko Disco) has commenced work on a plan to grow generation by 20 percent each year to 1,000 megawatts (MW) for its electricity networks by 2020.

The company would, however, give supply to only those customers willing and able to pay the set price which is likely to be between N24 and N30 per kilowatt hour, an informed industry source told BusinessDay.

Some stakeholders, however, say the 1,000 in six years is still below the required energy for the economic growth of Lagos State, which already requires 10,000 MW of energy for its economy.

The generated power would come through series of arrangements facilitated by the embedded power generation scheme being put in place by the company.

The distribution network, which has the capacity to take in over 1,000 MW, is currently getting supplies of between 200 or 300 MW on a daily basis from the national grid because of lack of gas to generate sufficient electricity in power plants across the country.

Eko Disco is planning to put out a bid for the second phase of small plants that would generate approximately 150 MW. Informed sources said the company would concentrate first on small plants which would eventually be phased out after supply from the national grid improves.

The breakdown of this figure indicates that a 60-MW plant would be sited in Orile, while Kirikiri would get a 20-MW plant, Agbara 50 MW, and Apapa 20 MW. There are also proposals for 10 MW each for Lekki and Victoria Island, bringing the total figure for this phase of the projects to about 170 MW.

The plant at Orile might attract international investors. The ‘phase 1 plan six’ facilities have been developed and agreed upon with the National Electricity Regulatory Commission (NERC), while draft request for proposal documents for the six lots has been sent to NERC for approval.

The source further stated that the signing of a power purchase agreement (PPA) between Eko and other stakeholders would be carried out in the last quarter of 2014.

The projects are in phases, said the source, with Phase 1 coming up in 2015, Phase 2 in 2016, and Phase 3 from 2017 to 2020.

The company would, however, strategically position larger power plants for the long-term purpose to form the anchor of its embedded power generation scheme. The smaller plants are adjudged to be less efficient and would be phased out within five to seven years of operation.

Brent Hampton, the company’s former vice president, services, in charge of embedded generation, said the regulatory framework to enable transfer of excess power generated into the national grid was being worked out.

Hampton said some of the challenges facing power distribution included very limited human capacity, legacy issues such as the attitude of the customers, dilapidated networks and limited gas supply.

He, however, stated that it was unlikely that the country would have sufficient power supply in the next five years from the national grid, even though there would be improvement.

Eko Disco, he said, inherited an outdated distribution network with high losses in the region of 45 percent, adding, “This situation has adversely affected the business of the company, especially its revenue and investment profiles.”

Ayodele Oni, a lawyer, said even though the 1,000 MW was small compared to what is required by the city of Lagos in terms of electricity supply, it was still a good move by the investors.

“It is a good step and better than not planning. I, however, believe the targeted capacity should increase. Once investors see profitability, they would invest in power generation,” Oni said.

Dolapo Kukoyi of Detail Commercial Solicitors argued that with embedded generation in view, Nigeria should be able to achieve its national aspiration within a short time, reduce technical losses because of proximity to networks system, and deepen the electricity market.

She said with embedded generation in place, distribution companies would have access to power supply and get more cash flow as more customers would be ready to pay for steady and regular electricity supply.

Goddy Duru-Oguzie, managing director, PowTech Nigeria Limited, said the move was encouraging, adding that the good thing about it was that the promoters were investors who are competent and are well aware of the issues of safety.

He expressed confidence that they would put in place a system that would contribute to greater efficiency in the power industry.

Source: BusinessDay
Re: Eko Disco Targets 20% Annual Generation Growth To 1000mw In 2020 by Cargoed: 3:52am On Jun 07, 2015
Is it really in the interest of EKO Disco to give its citizens power not customers? Think of it this way...EKO Disco should be collecting about 7bill naira / mth Via estimated billing but supplies only N6mill/mth value of light.

When you look at it they have no interest in giving you light as they make lots of money from doing nothing. Pls this is from a citizen point of view not customer.
At 300mw_hr each citizen recieves only 0.025watt/hr (300mw/12mill lagosians) the average light bulb consumes 7watts your fridge 150watts.

Now each citizen pays N650/mth as Disco bill (nepabill) average NEPA bill per house hold is N4000 (6 persons per house hold N650/mth)
650x12mill lagosians = N7bill/mth.

How much did they really consume 0.025watts_hr/citizen x 24hrs x 30days = 18watts/mth or 54kobo/mth
(at a rate of even illegal N30/kw) official rate is N15/kw.

So we pay as citizen N650/mth for power and they supply us 54kobo of electric power. Tell me why will they want to supply you more power. Their aim is just to flash u light so you know they are there.

Mr Hanson should explain what he means by lack of suitable manpower? With all that cash.

They should be telling us how many card digital meters they have distributed in the last mth and last 6mtths and last 2yrs.

The only business that one can do in Lagos. is buy and sell every where sales girl wanted. Instead of quality jobs.

The Solution.
1) Disco should not do PPA, Gencos should why they will only supply their friends customers willing to pay only N30 (not citizens) like one or two factory or office. Citizens pay N80/hr on fuel for generators so they are lying.

2) Disco should make their network 95% efficient what have they been doing with all that cash. In Lagos you see electric wire hanging carelessly all over the place and you wonder is this any bodies business.

3) Gencos should fire 2 coal power plants in Lagos as a matter of urgency forget all that climate change business ,12mill citizens are currently in blackout. this will give at least 1500mw not the 100mw disco are waisting time and money on. The gas excuse the gencos are saying is rubbish. can't they supply their turbines with tankers.

4) Citizens should get smarter and get your self's into solar, just like nobody cares now what happens at the waterworks so one day we will not believe we where waiting for disco/genco/NEPA/phcn to supply us light
with each house hold buying 0ne solar panel a year you will be producing and consuming excess of 10gigawatts in 3yrs time. (2mill household with one solar panel at 100watts_hr) You do the maths.

(1) (Reply)

Can Some Transfer Online Through Western Union? / Let Me Show You How To Make Money With GCR Coin 1 Click Mining / Banks Reduce Withdrawal Limits On Atms

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 23
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.