Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 4:57pm On Jan 08, 2016
Happy new year to all nairalanders. We just started the construction of a twin two bedroom bungalow in cross river. Have learnt so much from spyder, haji muftua, jarus, and lot of other members. So I have an engineer who comes once in a while and also am experienced Builder and his team. I am the site manager, I buy the materials and pay the the workers. Been a part of nairaland has paid off.

2 Likes

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:02pm On Jan 08, 2016
I started by moulding 100 bags of cement at 35 blocks per bag. So we have 3500 plus blocks

1 Like

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:03pm On Jan 08, 2016
Block making

1 Like

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:04pm On Jan 08, 2016
More blocks

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:07pm On Jan 08, 2016
It took the moulder 6 days to mould

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:11pm On Jan 08, 2016
When we started the moulders thought I was an ajebo woman unfortunately I gave them a run for their tricks. Them bow
thank you guys. Love property section

1 Like

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:29pm On Jan 08, 2016
Cost of moulding 3700 blocks

100 bags of cement 145k at 1450 to site.
30 tons o cutter sand 24k
30 tons of sharp sharp sand 25k
4 trips of sea sand (911) 62k
Water. 27k
Moulding 50k @ 500 per bag
:watering of blocks 4k
Miscellaneous 11k
Total 348k

1 Like

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:34pm On Jan 08, 2016
Before I go further I must state that all I know about construction was acquired here in nairaland so I will try and share as much as I remember.

3 Likes

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:37pm On Jan 08, 2016
A sketch of the plan. No 3d. Approvals to cost 135k

1 Like

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:41pm On Jan 08, 2016
Sketch of the plan. No 3d. Approvals cost 135k

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:44pm On Jan 08, 2016
The community charge 130k for developmental fees.
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:46pm On Jan 08, 2016
Excavation and forming

1 Share

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 5:47pm On Jan 08, 2016
Excavation and forming

Re: Construction Of A Twin Two Bedroom Bungalow. by 4nobody4every1: 5:51pm On Jan 08, 2016
Good work @ Op, is the land swampy?....the soil looks very soft smiley cool
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 6:02pm On Jan 08, 2016
Cost of setting out.
1 square 600
1 hammer 1000
2 by2 wood 5400
Pegs 2600
Ropes 1k
3 inches nail 600
2 inches nail 450
Labour 10k

Total 21,650
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 6:50pm On Jan 08, 2016
The soil is not swampy . The land was used farming.
Re: Construction Of A Twin Two Bedroom Bungalow. by 4nobody4every1: 7:39pm On Jan 08, 2016
Ok, following you bumper to bumper, l am happy to see a woman building, very soon, you will be the new ""female spyder880"" on property section wink
Re: Construction Of A Twin Two Bedroom Bungalow. by smiley001(m): 8:52pm On Jan 08, 2016
Can u imagine a woman doing all these?
Me just sidon here dey looku looku.

Weldone ma, God will build it for u.

Already in class as usual.

Pls, let it be detailed.


And if u were to buy the already moulded 3700 blocks, how much would it have costed you?


If ur site was to be in abeokuta, I would av volunteered to give you some free Stone dust but must buy Granite from me.
Re: Construction Of A Twin Two Bedroom Bungalow. by mufutau55(m): 9:22pm On Jan 08, 2016
beansandgarri:
Before I go further I must state that all I know about construction was acquired here in nairaland so I will try and share as much as I remember.

Congratulations my sister. God will help you finished in good health.

Hajji M.

3 Likes

Re: Construction Of A Twin Two Bedroom Bungalow. by spyder880(m): 10:11pm On Jan 08, 2016
beansandgarri:
Happy new year to all nairalanders. We just started the construction of a twin two bedroom bungalow in cross river. Have learnt so much from spyder, haji muftua, jarus, and lot of other members. So I have an engineer who comes once in a while and also am experienced Builder and his team. I am the site manager, I buy the materials and pay the the workers. Been a part of nairaland has paid off.

Good!
Time for our women to stand up and compete in every sector of the economy. I see you bringing in another kind of innovation that will attract more attention. We are here for you. A big welcome my sister. cheesy

2 Likes

Re: Construction Of A Twin Two Bedroom Bungalow. by benpedro(m): 12:23am On Jan 09, 2016
Following....please is the 3,500 blocks meant for just the foundation or for the entire building? Please we will benefit more if you can tell us in details as you have been doing,how many blocks used for each segment.
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 4:03am On Jan 09, 2016
The 3500 blocks will not be enough for the project. I intend to do this project in phases because of funds and time. This project is situated in calabar and I where I am based is 4 hours away from site.
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 4:17am On Jan 09, 2016
Phase 1
Excavation to dpc.
The excavation was done at 3 meters since its a bungalow and the dpc built up to 6 coaches because the land is table but not even. Since the land is not swampy. I decided to do a capping on the dpc and the German floor will be done later.

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 4:25am On Jan 09, 2016
benpedro:
Following....please is the 3,500 blocks meant for just the foundation or for the entire building? Please we will benefit more if you can tell us in details as you have been doing,how many blocks used for each segment.

I cant really say how many blocks are used because I did not count. However the 3500 blocks might not complete the project cuz of the hight of the foundation which is 6 coaches high.
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 4:26am On Jan 09, 2016
mufutau55:


Congratulations my sister. God will help you finished in good health.

Hajji M.
Thanks sir.
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 4:29am On Jan 09, 2016
spyder880:


Good!
Time for our women to stand up and compete in every sector of the economy. I see you bringing in another kind of innovation that will attract more attention. We are here for you. A big welcome my sister. cheesy

Oga spyder thanks for the motivation. You inspire alot. A big thanks to gabby tabby the woman syder.

1 Like

Re: Construction Of A Twin Two Bedroom Bungalow. by johnson232: 8:20am On Jan 09, 2016
beansandgarri:
Cost of moulding 3700 blocks

100 bags of cement 145k at 1450 to site.
30 tons o cutter sand 24k
30 tons of sharp sharp sand 25k
4 trips of sea sand (911) 62k
Water. 27k
Moulding 50k @ 500 per bag
:watering of blocks 4k
Miscellaneous 11k
Total 348k
Well done madam...
This your moniker funny sha....

Were the 30tons of gutter sand and 4trips of sea sand also used for the block making? If yes, were there some left? Because the total combining the sharp, gutter and sea sand is almost going to 100tons....

Thanks....
Re: Construction Of A Twin Two Bedroom Bungalow. by 4nobody4every1: 9:22am On Jan 09, 2016
[quote author=johnson232 post=41803675]
Well done madam...
This your moniker funny sha....

Were the 30tons of gutter sand and 4trips of sea sand also used for the block making? If yes, were there some left? Because the total combining the sharp, gutter and sea sand is almost going to 100tons....

Thanks....[/quote[i]Hahaha, l just took a look at the moniker again, it means beans and garri, Nairaland go kill person with laugh grin grin

1 Like

Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 11:59am On Jan 10, 2016
johnson232:

Well done madam...
This your moniker funny sha....

Were the 30tons of gutter sand and 4trips of sea sand also used for the block making? If yes, were there some left? Because the total combining the sharp, gutter and sea sand is almost going to 100tons....

Thanks....
the seasand and cutter sand finished but the sharpshap sand was not exhausted even after completing the dpc.
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 12:40pm On Jan 10, 2016
Cost from excavation to dpc.
1013 blocks were used for the 6 coaches.
Excavation 39,250
53 bags of. Cement 74,000@ 1400 to site.
Water 10400
2 trips of 911 truck sea sand. 31500
20 planks. 19000 @ 900 to site.
15 length of 12mm iron rod 19500@ 1300
17 length of quarter rods. 6250
Binding wire 2000
1/2 bag of 3 inches nails 2750
5 pounds of 4 inches nails 1000
Capenter workmanship for boarding the pillars and capping the dpc. 20k
Iron workmanship for 23 pillars 11250@500
Concrete work/ Casting of pillars and dpc capping/labour 132k
15 tons. Of granite 65k
Supervision 15k
Micelenous 8000k
Total 438,200.
The above amount excludes the cost of blocks.
Re: Construction Of A Twin Two Bedroom Bungalow. by beansandgarri(f): 12:50pm On Jan 10, 2016
Closed site after Xmas holidays. By the grace of God will resume site during Easter holidays. Until then, God bless our hustle.
Re: Construction Of A Twin Two Bedroom Bungalow. by johnson232: 1:16pm On Jan 11, 2016
beansandgarri:
Cost from excavation to dpc.
1013 blocks were used for the 6 coaches.
Excavation 39,250
53 bags of. Cement 74,000@ 1400 to site.
Water 10400
2 trips of 911 truck sea sand. 31500
20 planks. 19000 @ 900 to site.
15 length of 12mm iron rod 19500@ 1300
17 length of quarter rods. 6250
Binding wire 2000
1/2 bag of 3 inches nails 2750
5 pounds of 4 inches nails 1000
Capenter workmanship for boarding the pillars and capping the dpc. 20k
Iron workmanship for 23 pillars 11250@500
Concrete work/ Casting of pillars and dpc capping/labour 132k
15 tons. Of granite 65k
Supervision 15k
Micelenous 8000k
Total 438,200.
The above amount excludes the cost of blocks.
This is nice....
Is the money for supervision from setting out to this stage?

Thanks...

(1) (2) (3) (Reply)

How To Make Sure Money You Send From Abroad To Buy A Land Doesn't Get Embezzled / New 5 Bedroom Bungalow Architectural Design With Living Room View / Real Estate As The Most Lucrative Investment

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.