Stats: 3,014,683 members, 7,372,220 topics. Date: Saturday, 01 April 2023 at 11:32 AM |
Nairaland Forum / Nairaland / General / Properties / After/while Installing Tiles, 304 And 316 Stainless Steel Rails And Wrought Iron (380 Views)
Differences Between 304 And 316 Grade Stainless Steel / We Deal With Stainless Steel Rails For Staircase And Balcony and Gates / QUALITY STAINLESS STEEL RAILS (from N17,000 per meter) (2) (3) (4)
(1) (Reply)
After/while Installing Tiles, 304 And 316 Stainless Steel Rails And Wrought Iron by zynzyn(m): 1:30pm On Jun 05, 2018 |
The best time to install your Stainless Steel Rails is after floor tiles have been set in place. This is to ensure that the chemical for washing the tiles does not corrode the Stainless Rails. Visit https://www.nairaland.com/1004598/stainless-steel-handrails-railings-original for Rails. |
(1) (Reply)
Get A Fanastic Furniture At A Small Price / Royal Flex Estate 3, Ibeju Lekki / 3 Bedrooms Flat With Bq For Sale, Price:25m Net
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2023 Oluwaseun Osewa. All rights reserved. See How To Advertise. 16 |