Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,845 members, 7,810,256 topics. Date: Saturday, 27 April 2024 at 03:04 AM

Premium Times Special Report On Road Projects Across Nigeria Under PMB - Politics (2) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Premium Times Special Report On Road Projects Across Nigeria Under PMB (30143 Views)

Bariga Council Chairman 'alabi' Inspects Ongoing Projects Across Local Council / Governor Ambode Inspects Ongoing Projects Across The State, Promises To Deliver / Population Of Togo Equivalent Lost Their Jobs In 20 Months Under PMB- Ezekwesili (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by sexiestharam(f): 2:27pm On Oct 29, 2018
angry
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by BunmiSkye: 2:31pm On Oct 29, 2018
In the midst of inadequacy,tantrums and condemnation the projects ascertained by the Buhari led administration has never been compromised for any of this reasons and its effectively bringing more victories to the limelight for this administration.....GOD bless the man who effortlessly considers to accountable to the needs of Nigerians...for me the road projects are more viable to us than any other unforeseen promises made in the past.

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by LadyExcellency: 2:31pm On Oct 29, 2018
Government is more than income and expenditures.

Get the money and spend it on some projects can be done by virtually everybody including my 12 years old son.

Nigeria is so diverse that we need a unifier, someone that understands peculiar problems associated with each region and tackles then promptly as they come.

A competent and responsive administrator to say the least. Buhari got none of these. He had tried but his best which is not good enough in any ramification

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 2:34pm On Oct 29, 2018
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by michoim(m): 2:34pm On Oct 29, 2018
Great PMB. Go on beyond 2019 to 2023! Amazing President!!!

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 2:35pm On Oct 29, 2018
gumaz:
all these buhari posts all of a sudden,im starting to smell fish

Why it smells fishy to you is because your Atiku has absolutely nothing to offer except his past antecedents and by the time we begin offloading on him based on his issue based campaign request, he and his crew will have nowhere to hide

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by emerged01(m): 2:36pm On Oct 29, 2018
I know Fashola will try on roads.
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by kaystick86(m): 2:45pm On Oct 29, 2018
deomelo:


oga, if you dont know the reason for the delay in that project you ask not giving our wrong information on nairaland.

There is a legal dispute on that said land and the case in current in court.

The building you are referring to as APC secretariat is PMB campaign office at Central Area opposite Unity Bank HQ. APC NQ is as wuse 2.








Just like their culture and tradition of looting, stealing and abandoning projects, they've looted every kobo and abandoned their of HQ project.


Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Nobody: 2:45pm On Oct 29, 2018
Esseite:
Don't be bamboozled by the long rubbish....

take your time to go through the article and you would find out premium times was actually exposing corruption on disbursement and no work done or partially done while ministry of works is not coming forth on the amount released for the contract.



seems the OP

did not know he was exposing the rot in Road contracts with this thread


BMC job gone wrong shocked

2 Likes 1 Share

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Chubhie: 2:46pm On Oct 29, 2018
SarkinYarki:
Premium times seems to have collected a hatchet job to launder the image of the failed govt recently ..
Keyamo's 450 milla at work.

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Belluchii: 2:50pm On Oct 29, 2018
This is commendable, i appreciate the fact that the presidency is working tirelessly in making sure that Nigeria becomes a better place for us all. For the first time, a government is embarking on the completion of roads abandoned by the previous government. Its good that Fashola is doing what he promised.
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by ngoziempress: 2:54pm On Oct 29, 2018
So now premium times are being bias too? I'd like to know how much APC paid them to disgrace themselves
like this. And bear it in mind that Gombe is a PDP state and has always been a PDP state and all this roads were constructed by Dankwmabo whom is the present Gombe state Governor and if you watch closely, the only working governors in Nigeria today are PDP governors.

Do not believe anything these APC looters has to say. They are all liers! You must shew disdain for them.
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Awoo88: 2:54pm On Oct 29, 2018
Dem don start. PT go soon turn SR wen people perceived to be a working for APC
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by blowjob: 2:56pm On Oct 29, 2018
Buterflyle0:
SPECIAL REPORT: Amidst inadequate funding, insecurity, Buhari administration’s road projects continue across Nigeria



[size=5pt]Ongoing road construction at Dadinkowa mayama Local govt Kebbi State[/size]

In the second and final part of this report, the state of two major roads being constructed by the Buhari administration are reviewed.
Read the first part of the report here.
Gombe-Numan Road

The Gombe-Numan federal road rehabilitation project was awarded afresh by President Muhammadu Buhari’s administration in 2016.
Nearly two years into the life of the multi-billion naira contract, Nigerians plying the road are not elated about the progress of the project.
The federal government awarded the contract for the completion of the rehabilitation of the Gombe-Numan-Yola road to Triacta Nigerian Limited and Chinese Geo-engineering Company (CGC).
While Triacta Nigeria Limited undertakes the Gombe to Kaltungo portion of the road, CGC is to rebuild the road from Kaltungo to Numan.
The phase-II of the project, located in Gombe State, is to cover the road from Gombe to Kaltungo, which covers a distance of 83km. Earlier in March, motorists plying Gombe-Numan-Yola highway were assured that the ongoing construction work on the Gombe-Kaltungo axis would be completed by June.
The Project Manager of the road, Imran Khan, told the Director Federal High Way, North-East at the Ministry of Power, Works and Housing, Rufai Mohammed, that over 45 kilometres out of the 68 kilometres from the Gombe – Kaltungo axis of the road had been completed.
From Gombe, there is a completed road portion which stretches up to Ngadao, a little village located about 30km away from Ngadao, up to the Wuro-Yola village (about 5km further).
Our reporter observed in July that fresh rehabilitation works are being undertaken, with some portion of the two sides yet to be completed. A large portion of the road, which leads to Kumo town (44km away) is, however, yet to be tarred, after the recent removal of the dilapidated tarred road.
All the reconstruction effort from Gombe axis heading to Kaltungo, stops some few kilometers from Kumo town. The rest of the road, which leads beyond Kumo town, up to about 18km away from Kaltungo, is still yet to be rehabilitated.
PREMIUM TIMES, however, observed that a completed portion of the road, about 18km, leads up to Kaltungo town.
Isa Adamu, a petty trader in Wuro-Yola village, informed PREMIUM TIMES that about 2km portion of the excavation and grading part of the road, which passes through their village (about 36km away from Gombe), was only done between the June 10 and 13.
“It was not up to a month that they moved their equipment to where it is now, not far away from our village,” he said. “I think they stopped working due to Ramadan Sallah.
“We are looking forward to having them return immediately so that they can tar the road on time, before the rains turn the graded road into (a) pool of mud and cause problems for travellers,” he said.
Saleh Abdullahi, a vulcaniser who operates along the Gombe-Yola road, said “the completed portion that stretched up to Akko local government was done long ago, but when the minister of works came to visit the road, the contractors came to do some dressing of the road, like painting the middle and so on, and left to Kaltungo area”.
Our reporter also observed the presence of road construction equipment which were parked at the spots where fresh works were being carried out. Vehicles had to dust their way through the freshly graded portion of the road which is awaiting further development.
The remaining stretch of road that goes beyond Kumo town is still dotted with large potholes.
Construction work ongoing along Gombe-Numan road at Wura-Yola village.


Auwal Suleiman, Triacta Nigeria Limited’s quality control manager for the Gombe-Yola project, said “the Gombe-Numan-Yola rehabilitation project was awarded since 2011 but there was no mobilization for contractors to commence (the) work, until 2016, when it was finally funded”.
He said the work commenced in earnest in June 2016; starting from the Gombe town to Kaltungo, in Gombe State.
“And we were able to cover 23km by December of 2016. After that, we received a signal from the federal ministry of works to go to the Kaltungo end of the project which happened to be the worst part of the project.
“And in 2017 we were able to cover about 18km from that axis. After tackling the worse aspect of the road, we now returned to the Gombe side of the project where we left off, to continue the work, with the intention of connecting it with the Kaltungo side.
About 30km long portion of the Gombe-Numan road completed by the contractors.
On the stage of the project’s completion, Mr Suleiman said “so far, about 65 per cent of the project has been completed.
“There are some sections of the road that are difficult, which we have not been able to cover, especially between Kumo and Billiri towns. Even vehicles are not moving on the road. They have to go down the shoulders and so on. We hope to cover the remaining 35 per cent part of the road by December.”
On the issue of funding, Mr Suleiman said the government has not been defaulting in payment.
A portion of the awarded Gombe-Numan road where work is yet to be commenced by the contractors.



“This government is really trying because they have not been defaulting in terms of payment. Each time we raise certificate for part completion, they pay promptly. That is why you see us working on the road.”
Traffic Challenge

The challenge being faced by Triacta Nigeria Limited, according to Mr Suleiman, is the issue of traffic on the highway.
Gombe-Yola road is one of the busiest roads in North-east Nigeria. Contractors have to constantly pay attention and make provision for easy flow of traffic while the work is still ongoing.
This slows down the work, he said.
Another major challenge for the contractors is the rainy season, he said, which also slows down the speed of the road construction – though a common phenomenon in civil engineering.
The contractors said they have engaged over 500 unskilled labourers who are mostly from Gombe, Yola, Kaltungo and other smaller villages which the road passes through.
Most of the residents have not made any major complaints on how the construction efforts has made life difficult for them because the road is an existing one. Hence no one has asked for any kind of compensation due to encroachment.
“There is enough space to work on, so there has never been any cause to pay compensation whatsoever,” said Triacta’s quality control manager.
He added that “even if there is any private structure that is close to the highway, we see it as an encroachment and the federal government has the right of way. And that happen only when we are taking the project through the town.
PREMIUM TIMES observed that there is only one bridge between Gombe and Kaltungo which is yet to be built. The management of Triacta explained that work could not start on the bridge due to some technical issues.
“There is only one bridge at kilometer -44, between Gombe and Kaltungo. It is a 90 meters long bridge. We have not commenced construction of the bridge due to some issues concerning the discrepancies in the estimation and what it would actually require to build it.
Project Manager Triacta Construction Company Mr Walid with Premium Times Correspondent at Shagari Quarry Sokoto State on Monday



“We came to realise that the expected depth written in the design is not going to be workable. The piling depth that was prescribed for the bridge was too small to carry the bridge. So we invited the foundation technician to come and carryout some investigation to know the exact depth of the piling foundation.
“We are still waiting for that to be carried out, even though we believe it is going to be more than what they are going to specify in the bill.”
The road from Gombe to Kaltungo is being built with a wearing course (which is the outlook layer) of about 4cm; with a binder course of about 10cm; then a stone base of about 20cm, and then the sub-base (laterite base) which is 15cm.
There was not much filling on the road because it is an existing road, except where the contractors say they find the road level to be low.
Meanwhile, the other portion of the Gombe – Numan road rehabilitation is being handled by a Chinese company, CGC (Chinese Geo-Engineering Company). It is a 113km road distance which has been in a very bad shape for a long time.
PREMIUM TIMES’ visit along the road noticed work being done but at a very slow pace.
None of the portion of the road which has been excavated from Cham, a village on the border of Gombe and Adamawa state in Numan Local Government Area, has been completed.
Motorists are still seen pounding their ways through thick dusts of the excavated road as they ply to and from Gombe and Yola. A small number of construction workers, seen on the road, would not speak to PREMIUM TIMES or give contact details of their employers.
The excavation and partial laying of stone asphalt did not go beyond Savanah Sugar Company which is less than 20km. All the remaining portion of the road, from Savanah Sugar Company through Lamurde, up to Kaltungo (about 95km) where Triacta Company started its construction to Gombe town, has been in very bad shape.
A motorist, Sani Buba, seen changing a burst tyre near Lamurde town, said the bad road has so much toll on their vehicles.
A portion of the awarded Gombe-Numan road where work is yet to be commenced by the contractors.

“We have never seen such kind of road contract in this country,” he said.
“Unlike what we have in the ahead in Kaltungo up to Gombe, these contractors are just punishing us here, especially in the area that they have graded”.
Efforts to get the management of CGC to comment on why the project was being executed at a very slow pace were unsuccessful.
Sokoto –Tambuwal-Jega Road project

The Sokoto-Tambuwal Jega- Birnin Yauri road transverses Sokoto and Kebbi states.
The project was awarded by the Goodluck Jonathan administration in December 2014. Its cost was increased from N10.6 billion to N30.5 billion then. The project was to have been completed in 36 months, which means it should have been completed in 2017.
“The rehabilitation of Sokoto-Tambuwal-Jega-Birni Yauri Road: Jega-Birni Yauri (186km) in Kebbi State was awarded in favour of Messrs Triacta Nigeria Limited in the sum of N19.8bn, thereby revising the contract sum from N10.5bn to N30.4bn with a completion period of 36 months,” the then information minister, Nurudeen Mohammed, said.
However, inadequate release of funds, insecurity and slow disbursement of funds are however delaying the ongoing construction of Sokoto-Tambuwal-Jega road project, according to the project manager, Triacta Construction Company, Walid Aboujaoudi.

Like for other road projects covered in this investigation, the works ministry refused to provide details of released funds.
Slow disbursement of cash

“Part of our challenges is slow disbursement of cash,” Mr Aboujaoudi said.
“If the government is willing, we could have finished phase one and two of the projects but the little payment installment is holding the project back.
“The project from Sokoto, Jega and Yawuri is 311 kilometre by length. One bypass at Tambuwal is eight kilometre. Now 180 kilometre is completed. Put together, the phase one and two of the project is at 65 per cent completion stage.
“The completion period depends on how much the government budgeted for the project in a year. If the government can put a budget of N7 billion in a year, we can finish the project in less than two years. But they budgeted only N2 billion. That’s what makes the project to be uncompleted.
Ongoing road construction at Tambuwal Sokoto State

“If the government can’t increase the budget for the project, it will take several years before completion.
“The more they increase the budget, the more we move fast and our rate is five-year-old. Prices of diesel, gadgets, cement are going up. It’s better for us to finish quickly because of the increasing rate.”
Insecurity

Mr Aboujaoudi explained further that the issue of security is a major concern, as there are issues with workers’ safety.
“They are kidnapping us. They came here to the quarry in the month of Ramadan. They killed three police officers on guard and kidnapped our colleague.”
When asked how much ransom they paid before their colleagues were released, he said he was not part of the negotiation because they did everything from Abuja before the staff was released.
He said, “Because of the security situation, we are scared of staying longer in the site. We are forced to leave site early in the day because of the fear of the unknown.
“The host communities do complain about the slow movement of the project. We tried to explain to them our willingness to complete the project on time but the slow disbursement of funds and even the budget, is delaying the project.”

On the project impact on the host community, he said over three hundred locals were employed.
“We have three quarries. One in Zamfara, one at Sokoto and also in Kebbi State. We employed over three hundred locals in the host community.”
The village head of Marake in Shagari Local Government Area of Sokoto, Abubakar Magaji, commended the federal government over the ongoing road project.
Mr Magaji called on the construction company to provide speed breaks in specific locations because of the high speed with which motorists now ply the highway.
“We have little kids and our livestock are moving around. Only the speed breaker can notify some drivers to understand that they are approaching a village,” Mr Magaji said.
For three months, efforts to get the details of the money disbursed to the contractors have been unsuccessful.
When PREMIUM TIMES contacted Hakeem Bello, spokesperson to the Minister of Power, Works and Housing, Babatunde Fashola, in July, he promised to get back to our reporters on details of the payments made to the affected contractors.
But several weeks after our reporter sent the questions and followed up with reminders, he did not respond.

This article is a product of a partnership between PREMIUM TIMES and #Buharimeter to fact-check the state of major roads being constructed by the Buhari administration.
Buharimeter is an initiative of the Centre for Democracy and Development (CDD) with support from the Open Society Initiative for West Africa (OSIWA) and the Department for International Department (DFID)


https://www.premiumtimesng.com/news/headlines/292745-special-report-amidst-inadequate-funding-insecurity-buhari-administrations-road-projects-continue-across-nigeria-2.html

GOD BLESS AND PROTECT BUHARI..

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by jumpandpas(m): 3:00pm On Oct 29, 2018
madridguy:
With time both wailers and their wadata chiefs will be shouting Sai Baba.


With time abi? .


You have spoken like sai barber. .


"We shall..

"We will..

"We may..

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Nobody: 3:03pm On Oct 29, 2018
nice
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Tsam96(m): 3:04pm On Oct 29, 2018
Of course most people didn't read the post, and am guessing the OP didn't too.
Nigerians been making assumptions and jumping to conclusions since God knows when

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by jinxet2000: 3:07pm On Oct 29, 2018
If this is the place all the billions have been invested in Nigeria, then Nigeria is in trouble.
People look forward to see the following;
Hospitals equipped with modern infrastructures
New roads in different cities
New companies for youth to work (e.g. min 3 refineries, steel companies)
Second Niger bridge
Seaport at the east

without these few itemized every argument is null.
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by biztip: 3:08pm On Oct 29, 2018
u go and snap 3poctures and come here telling us buhari is doing road. what will send buhari home is more than d roads he is not even constructing. niegerisn have made their minds and just patiently waiting for 2019. out of everyone I have asked abt if they will vote buhari, none has said yes. some even wants to slap me for ever asking them such. buhari should go home its all clear
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 3:09pm On Oct 29, 2018
biztip:
u go and snap 3poctures and come here telling us buhari is doing road. what will send buhari home is more than d roads he is not even constructing. niegerisn have made their minds and just patiently waiting for 2019. out of everyone I have asked abt if they will vote buhari, none has said yes. some even wants to slap me for ever asking them such. buhari should go home its all clear

Part one of same report.

https://www.premiumtimesng.com/news/headlines/289368-special-report-amidst-inadequate-funding-buharis-road-construction-projects-across-nigeria-continue-1.html

This is a fact check focused on roads. There will be other fact checks on other areas of development.

You can keep lying and deceiving yourself about the so called ghosts you asked if they would vote buhari.

Your Atiku is still a learner

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by chinedumoooo: 3:16pm On Oct 29, 2018
Buhari remain the best president,nigeria had produce since 1999.

3 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by DWJOBScom(m): 3:16pm On Oct 29, 2018
Esseite:
Don't be bamboozled by the long rubbish....

take your time to go through the article and you would find out premium times was actually exposing corruption on disbursement and no work done or partially done while ministry of works is not coming forth on the amount released for the contract.



This guys don’t read!
So daft and in a hurry to comment.
It’s now a credible fact that we have kids commenting here

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Bhol28: 3:20pm On Oct 29, 2018
Buterflyle0:


Lmao that I know all too well. Self denial is a symptom of a degenerative mental illness and a lot of them do have it. Especially when they ply some of these roads and actually see the work going on but still choose to deny it. It shows how dark their souls are and how they never do wish well for this country
Even as some of there kinsmen are collecting free 5k,some on 30k allowance/free skills training, their kids in pry schools are having free daily lunch they are denying.

2 Likes

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 3:22pm On Oct 29, 2018
Bhol28:
Even as some of there kinsmen are collecting free 5k,some on 30k allowance/free skills training, their kids in pry schools are having free daily lunch they are denying.

That's the sad reality for genetic liars and hate filled souls. They will deny their own parents just to get at PMB.

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by eneyoduke(m): 3:23pm On Oct 29, 2018
Buhari will now be happy with the media/press
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by biztip: 3:26pm On Oct 29, 2018
Buterflyle0:


Part one of same report.

https://www.premiumtimesng.com/news/headlines/289368-special-report-amidst-inadequate-funding-buharis-road-construction-projects-across-nigeria-continue-1.html

This is a fact check focused on roads. There will be other fact checks on other areas of development.

You can keep lying and deceiving yourself about the so called ghosts you asked if they would vote buhari.

Your Atiku is still a learner
I live in Nigeria. those facts of urs seems to exist only in ur dreams. buhari has done nothing. he has brought more hardship upon Nigerians. ur job of protecting d incompetent one will end by Feb next year when we finally tell him au revoir
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Icon79(m): 3:27pm On Oct 29, 2018
The presidential election is around the corner so we'll start getting all these APC sponsored "Special Reports" by these bunch of shameless brown envelope loving Naija journos angry sad shocked

#Disgusting!


O pari
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 3:40pm On Oct 29, 2018
biztip:

I live in Nigeria. those facts of urs seems to exist only in ur dreams. buhari has done nothing. he has brought more hardship upon Nigerians. ur job of protecting d incompetent one will end by Feb next year when we finally tell him au revoir

Wailing degenerate you may live in Nigeria but you must be a blind resident

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Nobody: 3:42pm On Oct 29, 2018
Buterflyle0:
Waiting for the "APC HAS PAID PREMIUM TIMES" crew to come with their usual nonsense

Meanwhile for those who think this second report is only about northern projects, you can read the first report here by the same premium times.

https://www.premiumtimesng.com/news/headlines/289368-special-report-amidst-inadequate-funding-buharis-road-construction-projects-across-nigeria-continue-1.html

[img]https://media1./images/51a86b2115cd75b972f9bc933fec39cc/tenor.gif?itemid=5701246[/img]

Did you read the report ? Because from my understanding, you are contradicting yourself. Premium time has just exposed the lots of setbacks contractors are facing, but just b cause the first few paragraphs gave you chilled vibes about APC you didn’t go further. Exactly why we are we we are today. You were deceived by the first paragraph.

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Firefire(m): 3:44pm On Oct 29, 2018
Fraudulent show of shame from lost souls

1 Like

(1) (2) (3) (Reply)

Catalogues Of History Makers In Nigeria! / Ngige's Threat To Banks; See Labour Acts Breached By Banks: Know Your Right!!! / Atiku V Tinubu: Presidential Elections Tribunal Reserves Judgement

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 78
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.