Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion - Travel (2) - Nairaland

Nairaland Forum / Nairaland / General / Travel / Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion (13471 Views)

The Lagos Red Line Train Is Set For Completion - Seyi Law / Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible / Lagos-Ibadan Railway: The Interior Of The New Trains (Photos) (2) (3) (4)

(1) (2) (Reply) (Go Down)

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by globalresource: 10:15am On Dec 06, 2018
grin
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by efighter: 10:16am On Dec 06, 2018
crownwealth:
Fraudulent element always changing the goal post

We can all see what Buhari has been doing. We can all see the rail tracks from Lagos to Ibadan. How does changing goal post relate to this now? Did he say that he is changing the location of the rail track to Enugu - Owerri? Use your brain.

3 Likes

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by CocoaOla: 10:17am On Dec 06, 2018
Postpone to 2019- 2020 achievement
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by Smile4daddy(m): 10:17am On Dec 06, 2018
Only looters and oppressors are afraid of THE NEXT LEVEL.... they all know, that they can't flow in it because NEXT LEVEL is to recover loots and Jail looters.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by walichenko: 10:19am On Dec 06, 2018
krattoss:
What we need in this country is steady power supply and everything will just fall in place.
I wonder how long before they know this...24/7 light and Nigeria economic problems reduced by 50%

1 Like

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by foreshore(m): 10:23am On Dec 06, 2018
AutoReportNG:
Mr. Rotimi Amaechi, the minister of transportation, has directed the Chinese Civil Engineering Company (CCECC), the contractors handling the Lagos-Ibadan railway, to ensure that the train becomes operational before February 2019.

Amaechi said this on Tuesday during the monthly inspection of the Lagos-Ibadan rail project in Papalanto, Ogun state.

He said the contractors must ensure that the tracks and bridges were completed and the train must make transport sense.

“There must be train on the tracks before February. It doesn’t matter when, but there must be a train on the track that makes transport sense,” the minister said.

“What I mean by transport sense is that it must be able to carry passengers from Abeokuta if not up-to Ibadan, we have agreed that everybody must work towards it.

“The next inspection is on Dec. 18 and that is two weeks from now.

“Before we used to have it once in a month but now it will be twice in a month to ensure that, that is achieved.

“So, we will be back here to ensure that what we have agreed to today will be implemented. The work is progressing rapidly, the weather is no longer an issue, the elements were an issue before but now it is no longer an issue.

“You should know that on the 18th, we would have started campaign, the president has emphasised that we must build infrastructure.”

He said out of 10 bridges, only two was uncompleted, adding that before the next inspection on December 18, one must be completed.

Amaechi said his role as director-general of President Muhammadu Buhari’s campaign won’t affect his work.

He said the president was determined to build infrastructure, stating that the monthly inspection would take place every two weeks to ensure progress on the project.


Source:
https://www.autoreportng.com/2018/12/lagos-ibadan-rail-line-will-be.html


Propaganda and lies, never straightforward. That's the reason we are where we are now.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by cdqyehyeh(m): 10:23am On Dec 06, 2018
bantudra:
you cant rush constructions...alot of mistakes happens when you rush constructions....
i think u'v let Nigeria slow pace at construting roads makes ur thinks this rushing.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by supereagle(m): 10:25am On Dec 06, 2018
AutoReportNG:
God bless Naija

God bless PMB/PYO who love common Nigerians.

1 Like

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by bantudra: 10:26am On Dec 06, 2018
cdqyehyeh:

i think u'v let Nigeria slow pace at construting roads makes ur thinks this rushing.

you know nothing...in europe you need months to finish just some part of a road...i know what am talkin about....
i am a construction worker myself....

1 Like

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by Reference(m): 10:27am On Dec 06, 2018
fyneguy:


The biggest lie told to Nigerians. Steady power supply alone wont do it.

Abi oh. Power without ideas leads only to truancy... any sort of power.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by supereagle(m): 10:27am On Dec 06, 2018
[quote author=walichenko post=73598433]I wonder how long before they know this...24/7 light and Nigeria economic problems reduced by 50%[/quote

We need good transport system, both of them are important for our economy to improve. ]

1 Like

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by PStacks(m): 10:28am On Dec 06, 2018
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by JuanDeDios: 10:35am On Dec 06, 2018
AutoReportNG:
Mr. Rotimi Amaechi, the minister of transportation, has directed the Chinese Civil Engineering Company (CCECC), the contractors handling the Lagos-Ibadan railway, to ensure that the train becomes operational before February 2019.

Amaechi said this on Tuesday during the monthly inspection of the Lagos-Ibadan rail project in Papalanto, Ogun state.

He said the contractors must ensure that the tracks and bridges were completed and the train must make transport sense.

“There must be train on the tracks before February. It doesn’t matter when, but there must be a train on the track that makes transport sense,” the minister said.

“What I mean by transport sense is that it must be able to carry passengers from Abeokuta if not up-to Ibadan, we have agreed that everybody must work towards it.

“The next inspection is on Dec. 18 and that is two weeks from now.

“Before we used to have it once in a month but now it will be twice in a month to ensure that, that is achieved.

“So, we will be back here to ensure that what we have agreed to today will be implemented. The work is progressing rapidly, the weather is no longer an issue, the elements were an issue before but now it is no longer an issue.

“You should know that on the 18th, we would have started campaign, the president has emphasised that we must build infrastructure.”

He said out of 10 bridges, only two was uncompleted, adding that before the next inspection on December 18, one must be completed.

Amaechi said his role as director-general of President Muhammadu Buhari’s campaign won’t affect his work.

He said the president was determined to build infrastructure, stating that the monthly inspection would take place every two weeks to ensure progress on the project.


Source:
https://www.autoreportng.com/2018/12/lagos-ibadan-rail-line-will-be.html


Don't let them go and do "hurry hurry" work o.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by agboaustine: 10:40am On Dec 06, 2018
APC is a disgrace to the Nigeria with promise and fail of their time
nothing is working since APC won presidential seat 2015
everyday complain of PDP
when will APC leaders think for four years you keep on complaining, when you present unqualified candidate as a presidential
candidate of your party Nigerians are now wise
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by contigiency(m): 10:40am On Dec 06, 2018
crownwealth:
Fraudulent element always changing the goal post

Only if the real fraudulent ones like PDP were serious and anxious to deliver like this for the 16 years, may be by now we would been focusing on another thing.

2 Likes

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by emonkey(m): 11:04am On Dec 06, 2018
Never mind, we all know it is not feasible because it is the fault of PDP

It has not been possible becaus of 16 years of PDP
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by dannycom(m): 11:17am On Dec 06, 2018
February 2019 is already nocking at the door, no problem
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by openmine(m): 11:56am On Dec 06, 2018
Rail Constructions should never be rushed.....just a little miscalculation due to pressure and it will become a fatal disaster in the future!

The minister is trying so hard to insert this project as part of what the president has achieved.....
As much as this is a laudable project,it must not be rushed....

Let the construction company be the ones responsible for setting a timeline for the completion of such projects....

Not everything should be used to play politics esp when it has to do with human lives!

3 Likes

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by kayjay69(m): 1:06pm On Dec 06, 2018
Sad really, this project is said to be worth $1.5bn. No need to talk about the overall quality cos that's another debate in itself . In reality, this project can't be worth more than $200-300m. Drawing from my generous prior stated figure, that same amount will build 5 similar projects and quicken the pace of development across the country. It will also sooner lessen the burden on our already jampacked highways.

But then here we are, our collective intelligence has been beaten to the point where a section of Nigerians will tell me to shut up and be grateful they even did this one. Some will think I am supporting the opposition and paid to do so. Others don't simply care. The truth is the truth regardless of who is in power. We must strive to ask the right questions and hold our leaders accountable at the ballot. We must never settle for less, only a slave thinks this way.

I really want and hopes Nigeria succeeds. But with the slow pace of development in the face of an exploding young population, ignorance on the part of the general populace coupled with high levels of corruption at all levels (within and without govt) sincerely I fear the worst. We are not where we should be, we are still very far away.

AutoReportNG:
Mr. Rotimi Amaechi, the minister of transportation, has directed the Chinese Civil Engineering Company (CCECC), the contractors handling the Lagos-Ibadan railway, to ensure that the train becomes operational before February 2019.

Amaechi said this on Tuesday during the monthly inspection of the Lagos-Ibadan rail project in Papalanto, Ogun state.

He said the contractors must ensure that the tracks and bridges were completed and the train must make transport sense.

“There must be train on the tracks before February. It doesn’t matter when, but there must be a train on the track that makes transport sense,” the minister said.

“What I mean by transport sense is that it must be able to carry passengers from Abeokuta if not up-to Ibadan, we have agreed that everybody must work towards it.

“The next inspection is on Dec. 18 and that is two weeks from now.

“Before we used to have it once in a month but now it will be twice in a month to ensure that, that is achieved.

“So, we will be back here to ensure that what we have agreed to today will be implemented. The work is progressing rapidly, the weather is no longer an issue, the elements were an issue before but now it is no longer an issue.

“You should know that on the 18th, we would have started campaign, the president has emphasised that we must build infrastructure.”

He said out of 10 bridges, only two was uncompleted, adding that before the next inspection on December 18, one must be completed.

Amaechi said his role as director-general of President Muhammadu Buhari’s campaign won’t affect his work.

He said the president was determined to build infrastructure, stating that the monthly inspection would take place every two weeks to ensure progress on the project.


Source:
https://www.autoreportng.com/2018/12/lagos-ibadan-rail-line-will-be.html

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by Nobody: 1:07pm On Dec 06, 2018
fyneguy:


The biggest lie told to Nigerians. Steady power supply alone wont do it.

Says who? Do you know how much Artisans pay to run their business with Generators...? Have you experienced 30days of constant Eletricity to see how much impact it has on a Business...? Most multinational corporations spend about %5 on Eletricity to run their businesses, Do you have any idea how much and how far that can go into the development of such Businesses?

2 Likes 1 Share

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by crownwealth: 1:13pm On Dec 06, 2018
efighter:


We can all see what Buhari has been doing. We can all see the rail tracks from Lagos to Ibadan. How does changing goal post relate to this now? Did he say that he is changing the location of the rail track to Enugu - Owerri? Use your brain.


Dumbest from a brainwashed element.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by supereagle(m): 1:31pm On Dec 06, 2018
beamtopola:
And people with no brain are busy supporting these corrupt entities.
Well , this is why we can never move forward because of people who believe in hysteria other than reality. Tribal politic wont leaf us anywhere ny yoruba brothers.

If PDP had started something on railway and completed it, we would have gone far in development. With the era of oil boom, nothing tangible to show for it apart from looting and sharing.

1 Like

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by Nobody: 2:29pm On Dec 06, 2018
fyneguy:


The biggest lie told to Nigerians. Steady power supply alone wont do it.

Steady power alone will do it.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by OLASUNKONMI(m): 2:52pm On Dec 06, 2018
APC government and goal post shiftting are like 5&6.

They will surely use it as a campaign point.
1.)Fight curruption dey no gree fight.
Now na curruptions they rush them (APC).

5 YRS to construct LOCOMOTIVE RAIL. angry
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by OLASUNKONMI(m): 2:54pm On Dec 06, 2018
APC is dead.
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by Nobody: 3:45pm On Dec 06, 2018
Guyman02:
Amaechi should allow this contractor to do a solid job, the way they are forcing him to complete before the elections so as to use the project for political capital could be dangerous for the users, they should allow the cement to cure and set sad

You ar.

1 Like

Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by deleo16(m): 4:07pm On Dec 06, 2018
krattoss:
What we need in this country is steady power supply and everything will just fall in place.
you have said it all
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by Highzyk: 4:19pm On Dec 06, 2018
krattoss:
What we need in this country is steady power supply and everything will just fall in place.

Delusion expressed!
Do you know how cost of transportation (of goods) has terrorised Nigerians? This in addition to, bribery from touts, black touts, customs, local govt touts.

An efficient rail system will alleviate thisb
Re: Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion by 77up(m): 8:32pm On Dec 06, 2018
helinues:
Are they just waking up to reality when we all knew long time ago that January completion is not possible .

At least dey try sha,visible projects not paper work like past governments
You are right , unlike those that have been blinded by hatred .


They can't see anything good about this government just like that fool below you shocked

(1) (2) (Reply)

FG Announces 24-hour Total Closure Of Third Mainland Bridge / Air Peace: No Member Of Our Crew Absconded From Quarantine Facility / Yenagoa - Port Harcourt Road Wrecked By The Flood (pictures)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 49
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.