Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,608 members, 7,827,291 topics. Date: Tuesday, 14 May 2024 at 10:13 AM

Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures (946 Views)

Buhari’s Scorecard Decidedly Not Good Enough - Punch Editorial Board / 50 Achievements Of Akeredolu Within 3 And Half Years (Photos) / Buhari's Scorecard. No.25 Is Very Commendable, Almost Made Me Cry. (2) (3) (4)

(1) (Reply) (Go Down)

Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by Nobody: 8:09am On Dec 17, 2018
As at ...October 2018
In what can be described as a response to the fourteen (14), posers raised by the Atiku Presidential Campaign Organisation, was on Friday disclosed to newsmen by the Personal Assistant to President Muhammadu Buhari on New Media, Bashir Ahmad.

Presidency has listed all the ongoing and completed projects done by President Buhari across all the 36 states in the country.

Read below:

Abia State

Rehabilitation of Enugu-Port Harcourt Road Section 1, Umuahia-Aba Township Rail/Road bridge crossing.

Amaudo (Ntalakwu-Bende) Flood & Erosion Control Project

Cassava processing Plant

Rehabilitation and Reconstruction of Enugu-Port-Harcourt dual carriage way Section 1, Lokpanta-Umuahia Tower, Abia.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along umuahia- Bende – Ohafia Road

Adamawa State

Reconstruction off Yola Mubi Bridge at Kaa’aShiwa and Mile 30- Kwambla Road

Rehabilitation of Gombe-Numan-Yola road, phase 1,

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ngurore Mayobelwa road

Akwa Ibom State

Construction of Ididiep-Ekpeyong 10.125km asphalt pavement.

University of Uyo Erosion and Flood Control Project

IkotEbok/ Mobil Pegasus School Flood and Erosion Control Project

Ikot-Ekpene Transmission sub-station

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ete-Abak road

Anambra State

Nanka Recent Landslide Project, Phase 1

Remediation Works on Nanka/Oko Gully Erosion Control.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nnewi – Ekwulobia – Umunze – Ibinta Road

Bayelsa State

Construction of Ogbia Nembe 25km road.

Sagbama Erosion Rehabilitation Works

Cassava processing Plant

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Mbiama – Yenagoa Road

Bauchi State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Bauchi – Gombe Road

Rehabilitation of Boto Dam, Tafawa Balewa LGA, Bauchi State

Construction of Road in Boto Town, Tafawa Balewa LGA, Bauchi State

Benue State

Construction of Loko-Oweto Bridge over River Benue in Nasarawa and Benue States.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Makurdi – Nasarawa State Border Road

Rehabilitation of 120 Poles Solar Street Lights on Katsina-Ala Bridge

Rehabilitation of Street Lights on Makurdi Bridge at Makurdi

Cross River State



Dualisation of Odukpani – Itu – Ikot Ekpene Road in Cross River 9.7 Km/ Akwa Ibom State with a spur to Ididep 12.2 Km.

Gully Erosion Control Project at Eastern Naval Command Headquarters

Rehabilitation of Aleshi-Ugep Road, Iyamoyun-UgepSectionin Cross River State.

Cassava processing Plant

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Calabar – Oban – Ekang Road

Delta State

Completion of the Itakpe – Ajaokuta – Warri (Aladja Jetty) Railway Line and from Aladja to Warri town Port, Refinery and from Itakpe to Abuja.

Establishment of Pilot Briquetting Plant

Construction of 23.6km Asphalt Gbaregolor Ogulagha road with 2 bridges measuring 651m.

Construction of Tebu-Gbokoda pavement road network for the Olero Creek indigenes covering about 6 communities.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Amukpe – Eku – Abraka – Umutu – Agbo (Edo State Border)

Ebonyi State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Afikpo – Okigwe Road

Edo State

Auchi Poly-Ekperi-Uzea-Ohe with a spur to Fugar-Afuda-Usugbenun road Section 1 and a pedestrian bridge at Auchi poly gate.

Construction of Ekpoma-Uhiele 31.1 km road in Esan West.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Benin – Auchi – Okene Road

Construction of 46.5km Udo Ofunama asphaltic concrete road-7.3m wide.

Azura 450MW Independent Power Project

Provision of Street Lights at Benin – Sapele Interchange along Benin – Sapele Road

Ekiti State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ado – Igede – Itawure – Osun State Border Road

Enugu State

Rehabilitation of Enugu–Onitsha dual carriageway.

Obinagu/Akpulu/ EnuguezeUmunneobagu Soil Erosion And Flood Control Project

Soil Erosion, Flood Control and Road Improvement Works at Federal College of Education, Eha-Amufu

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nsukka – Adani – Anambra State Border Road

Federal Capital Territory, Abuja

Murtala Muhammad and Umar Musa Yar’Adua express ways

The Circle Road that envelopes the Central Business District.

The Nyanya-Gbagalape road

The Abuja Rail Mass Transit system. The total length of the rail double track laid is 45.245 kilometres

ICT innovation Hub

2MW solar power plant

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along kaduna road.

Provision of Street Lights at Giri interchange along Abuja – Lokoja Expressway

Provision of Street Lights at Kakao, Old Toll Gate along Abuja – Kaduna Road

Abuja – Kaduna Standard Gauge Railway

Imo State

Construction and Dualization of Port Harcourt/Owerri Road Junction.

Rehabilitation of Washed Away Internal Road and Rebuilding of Nwaorie Bridge at AlvanIkoku College of Education

Construction of Isinweke Oriaha, Uboma Road: a 16km road awarded in 2012, and picked by the Buhari-led administration.

Umuoki-Umuowasi Erosion Control and Road Improvement Works.

Cassava processing Plant

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ihiala – Umuduru Road interchange at EzeudoAmaokpa and Zimuzo Roads

Jigawa State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kano State Border – Garki – Gukel – M/Madori – Hadejia Road

Kaduna State

215MW Dual-Fired Plant in Kudenda

Rehabilitation of Ilorin-Jebba-Mokwa-Birnin-Gwari-Kaduna Road Section 1

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Zaria – Pambegua

Katsina State

Daura Township Erosion Control, Phase 1

Daura Township Erosion and Flood Control Project, Phase II

Katsina Wind Farm which has an installed capacity of 10.175MW

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Katsina – Batsari – Safana Road

Construction and construction of Daura Township Roads

Kebbi State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kalgo – Bunza – Kamba – Peka Road

Kogi State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Okene – Ibillo Road

Nigeria

Remediation of Lead Contaminated Sites in Shikira, Rafi Local Government Area

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kontagora – Tegina Road

Rehabilitation of 120 Poles Solar Street Lights on Jebba Bridge, Jebba

Lagos State

The construction work on the Lagos – Ibadan Railway Standard Guage Rail line with extension to the Lagos Port Complex at Apapa, Lagos.

Lagos Shoreline Protection/ Rehabilitation Works

Gully Erosion Works at Magodo, Lagos State

Oghere Ahmed Erosion Control Works

Establishment of Pilot Lagos State Briquetting Plant

ICT innovation Hub

Rehabilitation, Reconstruction and Expansion of Lagos-Ibadan dual carriage way, Section 1, Lagos-Sagamu.

Rehabilitation, Reconstruction and Expansion of Lagos-Ibadan dual carriage way.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along 3rd Mainland Bridge (Oworo Toll Gate)

construction of 60-room Hostel block for Artisans and Craftsmen at Onikan.

Ogun State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Abeokuta – Sango Ota Dual Carriageway

Plateau State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gimi Road

Rivers State
Port Harcourt International Airport...Completed

Rehabilitation and reconstruction of the moribund Rail system in the Port Harcourt port.

Construction of KAA-ATABA Road and Bridges: Originally awarded in 2012, Kaa-Ataba road connecting to Andoni/Opobo LGA was picked up by President Muhammad Buhari’s administration.

Dredging and Reclamation of 600 Hectares of swampy land with 60 million cubic meters of sand at the Onne Port, Port Harcourt, Rivers State, to enable port expansion at the Ocean terminal.

The Ogoni Land Clean-up and remediation project

Cassava processing Plant

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ahoada – Okoku – Okwuzi Road

Taraba State

The Kashimbilla Hydropower plant

3050MW Mambilla Hydro Power Plant

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Jalingo – MutumBiyu – Wukari Road

Nasarawa State

Completed the Inner Southern Expressway (ISEX), which is the expressway providing rapid East-West movement to the southern flank of the city linking the Abuja-Keffi road

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Lafia – Makurdi Road

Kwara State

Rehabilitation of Ilorin-Jebba-Mokwa-Birnin-Gwari-Kaduna Road Section 1.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ilorin – Ganmo – AjaseIpo, Road

Installation/Rehabilitation of Street Lights on Ilorin-Ibadan Expressway Geri Alimi) Spur, Ilorin

Rehabilitation of Street Lights on Ogbomosho –Ilorin road, Spure Geri Alimi by (Eyienkorin) Ilorin

Oyo State

Dualisation of Oyo-Ogbomosho-Ilorin Oyo-Ogbomosho-Ilorin, Section II (OyoOgbomosho).

Kudeti Flood Control Works

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ogbomosho – Dogo – Igbetti Road

Construction and rehabilitation of Iseyin – Okeho

Provision of Street Lights at Ogbomosho Interchange along Ibadan – Ogbomosho – Ilorin Expressway, (Phase II) Ogbomosho

Ondo State

Cassava processing Plant

Construction of 13KV transmission line and 132/33KV Substation at Okitipupa, Ondo.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ore – Okitipupa Road

Osun State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ibadan – Ife Dual Carriageway

Construction and rehabilitation of Elentere Apipontoro Road

Gombe State

Rehabilitation of Gombe-Numan-Yola road, phase 1.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gombe – Dukku – Darazo Road

Kano State

Dualisation of Kano-Maiduguri road section iv, (Potiskum-Damaturu)

Dualisation of Kano-Katsina Road phase 1.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along KwanarDumawa – KunyaBarubaJigawa State Border Road

Construction and Rehabilitation of Saminaka – Doguwa

Construction and Rehabilitation of Doguwa – Tiga

The execution of Kano – Kaduna Rail line

Lagos – Kano Railway Modernization Project

Sokoto State

Rehabilitation of Sokoto-Tambuwal-Jega road-Kotangora/makera road in sokoto/Kebbi/Niger States.

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kajiji – Jabo – Zamfara State Border

Yobe State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Damaturu – Dapchi – Bayamari Road

Zamfara State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gusau – TalataMarafa – Sokoto State Border Road.

https://www.vanguardngr.com/2018/10/breaking-presidency-lists-ongoing-completed-projects-across-36-states/

2 Likes 1 Share

Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by nothingspoil70: 8:23am On Dec 17, 2018
God bless APC God bless PMB
2019 is sure

3 Likes 2 Shares

Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by manutdrichie(m): 8:28am On Dec 17, 2018
Why do we need an APC customized eyeball before we can see the project

1 Like

Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by yerokunphilips: 8:38am On Dec 17, 2018
manutdrichie:
Why do we need an APC customized eyeball before we can see the project
Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by quickberry3(m): 8:48am On Dec 17, 2018
grin

God bless PMB/PYO

1 Like 1 Share

Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by quickberry3(m): 8:49am On Dec 17, 2018
manutdrichie:
Why do we need an APC customized eyeball before we can see the project


Because you are allergic to good things

3 Likes

Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by deboysben(m): 9:26am On Dec 17, 2018
On going till what end


Frauds everywhere
Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by GavelSlam: 9:31am On Dec 17, 2018
This government dey try biko.
Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by Flatties: 9:40am On Dec 17, 2018
The list is not complete

This are two I've plied and are not on the list

Otukpo otukpa road

Loco oweto- Otukpo road
Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by otosa(m): 9:55am On Dec 17, 2018
Ekiti State

Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ado – Igede – Itawure – Osun State Border Road
Federal government is a scam[color=#990000][/color]
Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by REDshouse(m): 10:19am On Dec 17, 2018
APC is a GOAL....
Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by efighter: 10:28am On Dec 17, 2018
IPOB miscreants, come and disprove these ptojects.
Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by Nobody: 8:42am On Dec 31, 2018
angry angry angry

Re: Re: Buhari Scorecard in 3 and Half Years-Part 1-Infrastructures by abc115: 8:48am On Dec 31, 2018
grin angry grin

(1) (Reply)

2019 : Buhari Sponsoring Some Presidential Aspirants / Fr. Mbaka Endorses President Buhari And Gov Ugwuanyi For Second Term / Ooni Of Ife Denies Buhari, Asks Nigerians To Vote Whomever They Want

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 30
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.