Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,596 members, 7,809,159 topics. Date: Friday, 26 April 2024 at 02:00 AM

President Buhari Delivers Dam Project Abandoned For 27 Years - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / President Buhari Delivers Dam Project Abandoned For 27 Years (25447 Views)

President Buhari Delivers His Speech At UN Conference Summit (Pictures) / Buhari Delivers His Polling Unit At Daura, Katsina For Tinubu / President Buhari Delivers Address At Bola Tinubu's 12th Colloquium (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

President Buhari Delivers Dam Project Abandoned For 27 Years by idealogical: 3:53am On Jan 27, 2019




The Zobe Regional Water Supply Scheme in Katsina abandoned for 27 years has been revived, completed and delivered by President Muhammadu Buhari.

The News Agency of Nigeria (NAN) reports that the dam, which was started in 1992, was revisited by the present administration to improve access to potable water for Katsina metropolis and environs
.

At an inspection visit to the site on Friday, the Minister of Water Resources, Mr Suleiman Adamu restated the desire of the present administration to complete all abandoned water projects.

According to him, the Federal Government is excited about progress made in the LOT 1 of the project, expressing hope that the State Government will hasten the processes to reticulate the water to homes.

“I came for inspection and celebration, because this project was started in 1992, and we want to celebrate the collaboration with the State Government that we have been true to our words in completing all ongoing projects.

“I was so pleased that this has happened, we are excited that water will start flowing into Katsina and its environs before the end of January, and that has been accomplished.

“This project has been waiting for 27 years, we are glad that we are coming to the tail end of this project. There is still work to be done, but there is sufficient water to start flowing into the communities,” he said.


Mr Ibrahim Mai-Maje, Consultant of the scheme, said the Zobe Water supply scheme was specifically targeted at bringing water from Zobe River to Katsina Local Government Areas.

He said three years ago, an MoU was signed between the state government and FG to bring water from Dutsinma, saying the water pumps, treatment plants, among others, had been completed and tested.

Mai-Maje said no fewer than six LGAs of Dutsinma, Kankia, Charanchi, Katsina, Bindawa, Kurfi would benefit, adding that no less than 37,000 cubic metres of water would be treated and pumped to homes.

“What is needed now is the Katsina State Government’s responsibility, this has been done since 1992, there is supposed to be an outlet that takes water into the state, then from there to other parts.

“The remaining connection from Dutsinma and to other Local Government Areas is the responsibility of the State Government and they have reached an advanced stage for the consultant to complete the work,” he said.

He added that the State Government was aware that it ought to put in remaining valves and fittings toward proper water reticulation.

Mai-maje said the pumping into main Katsina tank have been tested and washed to test distribution channel network to the state, adding that the State Government has begun processes to see that water gets to the populace.

The Deputy Governor, Alhaji Mannir Yakubu, commended the efforts of Federal Government and President Muhammadu Buhari for extending support towards completing all ongoing and abandoned water projects in the country.

‘We thank the President and the ministry for giving this project life and bringing it to this stage, we will also do our own part.

“It is certainly a project that we must honour our own part of the agreement, because the Federal Government has honoured her own part.

“Really, this is going to bring a lot of relief, not only to Katsina and Dutsinma, but also to all the towns along the routes,” Yakubu said.

NAN reports that the Federal Government had released N12 billion for onward implementation of Zobe Dam in Katsina State as part of its efforts to boost water supply across the country.

Zobe dam has the potential to irrigate about 8,000 hectares of arable land and also be used for regional water supply.


https://www.today.ng/news/politics/president-buhari-delivers-dam-project-abandoned-27-years-190516

20 Likes 3 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by olametrix(m): 5:22am On Jan 27, 2019
Under normal circumstances, they are not to be praise becouse thats their normal duty,
So i dont see reason to praise him

42 Likes 5 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Aufbauh(m): 5:23am On Jan 27, 2019
The task to bring Buhari back come FeBuhari 16 must be seen as a task to consolidate the gains of good governance for a better tomorrow.

It's not an easy task laying a foundation but, when it is set up the superstructure does not take time to be notice.
Project 4+4 = 8 should be a task that must be done.

144 Likes 11 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Kissup(f): 5:24am On Jan 27, 2019
,
Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Timi1990(m): 5:24am On Jan 27, 2019
Lies grin

5 Likes 1 Share

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by hakeem4(m): 5:24am On Jan 27, 2019
Why do previous government stop projects, is it that Nigeria is broke or what ?

27 Likes 1 Share

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by helinues: 5:25am On Jan 27, 2019
27 good years?

Simply means Pdp did nothing for the 16 years..

Pdp, never again in Nigeria

134 Likes 9 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Rollins777(m): 5:25am On Jan 27, 2019
Hmm
Re: President Buhari Delivers Dam Project Abandoned For 27 Years by BuhariAdvocate: 5:27am On Jan 27, 2019
Its shall never well with PDP and their well wishers.

107 Likes 9 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by iammo(m): 5:27am On Jan 27, 2019
undecided


If only Obasanjo and Jonathan did half of this things for Southerners, we would have been following them like the way Northerners follow buhari like zombie.

The guy is the new Awolowo to the Northerners, from mabila dam, barough inland river port,kaduna dry port, to this one, dude even hoodwinked Nigerians out of $25m to explore Oil in the North, and they kept lowkey on the discovery next thing we heard was plans to build refinery in katsina, while Southerners speak big big grammars like nepotism, claninsh, his people are close to enjoying 24hrs light


The fact is that all politicians are all corrupt, while Nigerians call it bribe, Americans call it lobbying, nigerians call it loot, americans call it donation to campaign fund and charity foundation donation.

While PDP starts projects with the sole aim of looting its funds and abandoning it at the rate of 5% completion
APC inflates cost of a project, so as to get kickbacks from contractors. This means rather than constructing a road at the rate of N32m per kilometer, you get a quotation of N45m, but they complete the projects with great standard and pace

101 Likes 4 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by ainas247: 5:27am On Jan 27, 2019
Hmm... 27 years that figure is alarming ??
Rank your business on Google and get more clients check my profile to see results

4 Likes

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by LordCenturion(m): 5:28am On Jan 27, 2019
There are millions of abandoned projects, especially since 1999,awon oloriburuku, the only thing they know is to loot the nation,, wicked souls

46 Likes 3 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Authoreety: 5:29am On Jan 27, 2019
BuhariAdvocate:
Its shall never well with PDP and their well wishers.

5 Likes 1 Share

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by themosthigh: 5:30am On Jan 27, 2019
Goon one

2 Likes

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by CHRISDMANAGER(m): 5:30am On Jan 27, 2019
Kudos to them but our country is not working security concern..

Meanwhile, ladies and Gentlemen if you want your hair and beard to grow to an enviable hight, check my signature.. You will see a positive result after two-three weeks of application..A trial will convince you!

1 Like 1 Share

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by allthingsgood: 5:31am On Jan 27, 2019
olametrix:
Under normal circumstances, they are not to be praise becouse thats their normal duty,
So i dont see reason to praise him

This is a very evil mentality. Give praiise to whom praise is due. Quit d bad belle

46 Likes 3 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by sassiemyk: 5:33am On Jan 27, 2019
Commissioning a finished Dam that is not finished? The Dam has been commissioned and yet water will soon start flowing. What's the hurry in the commissioning then? Lies and Politics.

2 Likes 3 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by goslowgoslow(m): 5:34am On Jan 27, 2019
olametrix:
Under normal circumstances, they are not to be praise becouse thats their normal duty,
So i dont see reason to praise him
But it was GEJ you will praise him.

34 Likes 3 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by olametrix(m): 5:36am On Jan 27, 2019
undecided i wont blam you becouse you dont know your right, as a nigerian citizen, since you are born what have your profit from nigeria gorvt, not buhari admin only, election is here now they are teasing you with bread and buttr

Guy the fact is this people are toying with everyone




allthingsgood:


This is a very stupid mentality. Give praiise to whom praise is due. Quit d bad belle

7 Likes 2 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by BruncleZuma: 5:36am On Jan 27, 2019
So that was a project that started when he was still smooching with Saint Abacha... whowoodatot.
Re: President Buhari Delivers Dam Project Abandoned For 27 Years by miketayo(m): 5:36am On Jan 27, 2019
allthingsgood:


This is a very evil mentality. Give praiise to whom praise is due. Quit d bad belle

Do they hail u for coming to work? Or for even doing your job?

5 Likes 2 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Benlag: 5:37am On Jan 27, 2019
Kill them with developments ! Osinbajo 2023 ! God punish devil !

37 Likes 4 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Auladimeji(m): 5:37am On Jan 27, 2019
olametrix:
Under normal circumstances, they are not to be praise becouse thats their normal duty,
So i dont see reason to praise him
But your big head will make you to blame him even if a man can't fvck his wife very well

15 Likes 2 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by hundredrivas(m): 5:39am On Jan 27, 2019
No pictures?
Re: President Buhari Delivers Dam Project Abandoned For 27 Years by olametrix(m): 5:40am On Jan 27, 2019
grin you have change your destiny with bag of rice, enjoy it for another 4yrs


Auladimeji:
But your big head will make you to blame him even if a man can't fvck his wife very well

1 Like 1 Share

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by tit(f): 5:40am On Jan 27, 2019
allthingsgood:


This is a very evil mentality. Give praiise to whom praise is due. Quit d bad belle

stop bad mouthing people for their opinion.
if you want to praise Buhari for a plate of kose, go ahead!

2 Likes 1 Share

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by helinues: 5:45am On Jan 27, 2019
olametrix:
Under normal circumstances, they are not to be praise becouse thats their normal duty,
So i dont see reason to praise him

When would you guys realised GEJ himself has already moved on?

When would you guys be aware of Atiku accepting defeats already by cancelling his campaign for now?

When would you guys take note that the next battle for presidency is 2023.

When!!!

23 Likes 4 Shares

Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Agugbadin: 5:45am On Jan 27, 2019
Good for Buhari, the project is in Katina state Buhari's home state
Re: President Buhari Delivers Dam Project Abandoned For 27 Years by Corrinthians(m): 5:51am On Jan 27, 2019
Aufbauh:
The task to bring Buhari back come FeBuhari 16 most be seen as a task to consolidate the gains of good governance for a better tomorrow.

It's not an easy task laying a foundation but, when it is set up the superstructure does not take time to be notice.
Project 4+4 = 8 should be a task that must be done.

3 Likes

(1) (2) (3) (Reply)

Oba Olofa Of Offa Dethroned / Akeredolu’s Order: Ondo Tackles Presidency, As Villa Defends Herdsmen / DSS Wants To Kill Nnamdi Kanu With A Poisonous Vaccine – IPOB

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 37
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.