Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,490 members, 7,819,784 topics. Date: Monday, 06 May 2024 at 11:16 PM

Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway - Travel (3) - Nairaland

Nairaland Forum / Nairaland / General / Travel / Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway (33810 Views)

Video Of Trains Being Test Run On The Red Line Tracks In Lagos. / The New Trains That Will Be Used For Lagos-Ibadan Railway And Their Specs / Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 7:29am On Feb 06, 2019
fee dee fee is showin their real mindset now....

they just want to win...thats all they care about....

not actualy to better nigeria....nigerian airways collapsed,apc tried to revive it and even tried to compensate former workers....
pension scheme collapsed,now its been revivide....

npower and tradermoni is vote buyin....??...how should we understand that statement....??

why didnt they had the same idea too...

fee dee fee would still be in charge today if they would just stop this pettiness and be reasonable for once....

their leaders carried away by police like petty thieves and they still have no shame....??

3 Likes

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by LordCenturion(m): 7:30am On Feb 06, 2019
CityNGR:
WEE YOU KIP QUAYET!! WAKANDA NONSENSE ASSEMBLAGE OF APPARITION ARE THESE?

I SAID IT BEFORE THAT YOU ARE A BROWN ENVELOPE REPORTER.... I HAVE PROOFS!!




SEE SOUTH AFRICA BELOW


Lies will not kill you, have you been to South Africa before?, I normally take train to the place of my work in joburg and their train is just like normal trains in Nigeria, the only difference is that their own is electric one

4 Likes

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by b1naryc0de: 7:30am On Feb 06, 2019
CityNGR:
WEE YOU KIP QUAYET!! WAKANDA NONSENSE ASSEMBLAGE OF APPARITION ARE THESE?

I SAID IT BEFORE THAT YOU ARE A BROWN ENVELOPE REPORTER.... I HAVE PROOFS!!




SEE SOUTH AFRICA BELOW

So you're comparing Nigeria today to South Africa ?

That's some wild thought.

If this railway development is true then I'll say the FG should be given the deserved commendations. One step at a time.

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Nobody: 7:32am On Feb 06, 2019
wait o they call all this Moving Coffin Train. thubser fire buhari and his supporters. this one nah train chai.

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 7:37am On Feb 06, 2019
emperorblog21:
wait o they call all this Moving Coffin Train. thubser fire buhari and his supporters. this one nah train chai.


then use a bycicle.....who cares....i dont like trains anyways....i prefer drivin myself....

2 Likes

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by jaxxy(m): 7:38am On Feb 06, 2019
CityNGR:
WEE YOU KIP QUAYET!! WAKANDA NONSENSE ASSEMBLAGE OF APPARITION ARE THESE?

I SAID IT BEFORE THAT YOU ARE A BROWN ENVELOPE REPORTER.... I HAVE PROOFS!!




SEE SOUTH AFRICA BELOW


Don’t blame him. What u show are electric powered trains, we don’t have stable power supply like SA probably why we opted for fuel/diesel ones he showed.
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 7:41am On Feb 06, 2019
jaxxy:



Don’t blame him. What u show are electric powered trains, we don’t have stable power supply like SA probably why we opted for fuel/diesel ones he showed.

and why dont we have stable power supply like SA....??

who is to blame for that....??

we have a system that doesnt even allow stable power supply like SA....

we have a system of gragra....

first the mindset of nigerians have to change....

it can not be that a movie barely released days ago is copied and sold on the streets....which type business wan thrive like that if we dont respect each other....

see that other guy postin betting rubbish all over the place....this is the mindset of common nigerians.....

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Gggg102(m): 7:44am On Feb 06, 2019
versashee:
This post was done when the PDP supporters we still asleep. We were still asleep because we have found peace of mind.


See the dead train they re giving Nigerians in 2019.
We don sufffer sha.

I run a drycleaning service and i am willing to Dryclean the clothes of this Confused president for free so he can be on his way back to Daura.
Which train did they give Nigeria before then?
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by sampeaka: 7:45am On Feb 06, 2019
get your game play is just fix score line call or whatsapp me

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by bestpunterever: 7:46am On Feb 06, 2019
I collected my pvc yesterday and it's for next level

2 Likes

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Gggg102(m): 7:47am On Feb 06, 2019
sinola:


sometimes,i wonder of what economic importance is that route in Nigeria...Had it bn they had channelled that project from Lagos to Abuja or even from Lagos to Portharcourt,it would have bn of a great relief to travellers and even tourists.Anyway,its my take though.
The full route is Lagos to Kaduna.

Lagos to Ibadan will connect to Abuja to Kaduna.

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 7:48am On Feb 06, 2019
sampeaka:
get your game play is just fix score line call or whatsapp me

police should arrest you and flog you day and night...everything about you is fraud....

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by jaxxy(m): 7:48am On Feb 06, 2019
dadark:


and why dont we have stable power supply like SA....??

who is to blame for that....??

we have a system that doesnt even allow stable power supply like SA....

we have a system of gragra....


We don’t have stable power supply becos of the incompetence of all our previous governments till date. U know the history.

It’s either we use fuel trains or forget about them totally till stable power is available. That’s the sad reality here.

2 Likes

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 7:50am On Feb 06, 2019
jaxxy:



We don’t have stable power supply becos of the incompetence of all our previous governments till date
. U know the history.

It’s either we use fuel trains or forget about them totally till stable power is available. That’s the sad reality here.

atleast we both agree on that....they dont care about improving nothing....they just want to play oga and madam....

i call them modern slave keepers....

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by 77up(m): 7:50am On Feb 06, 2019
CityNGR:
MORE FROM ETHIOPIA
Addis Ababa, the capital of Ethiopia, has now an operating light rail system. The first line commenced operations on September 20, 2015, while second line is still under construction. The significance of this rail system should not be undermined, given this is not Europe where every large city has effective public transport system.

Almost every large city in Africa suffers from heavy traffic, and transport systems are nothing short of chaotic. Addis Ababa has now shown that brand new rail infrastructure can be built within a densely built city. The next challenge is it to be an operational success
The way this good news got you angry no be here,must you people always look forward to read bad news.Why cant your looting party pdp import all those you uploaded? just imagine that obasanjo has done the good one and jonathan follow suite on the better then buhari willhave no choice than to go for the best else, they even killed the one we have .


But my little prayer for nigeria this morning is that " who ever want bad news for her ,then that bad news shall comes from their family" amen.

2 Likes 1 Share

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by hollywater: 7:52am On Feb 06, 2019
Another propaganda.

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by foreshore(m): 8:11am On Feb 06, 2019
AutoReportNG:
In our earlier reportage, we broke the news that the federal government has paid for some locomotive trains. These trains will be used for the Lagos-Ibadan Railway and for the Abuja-Kaduna railway respectively.

AutoReportNG did a review of the trains the federal government is buying, their images and their specs and these may interest you.

1. NDJ3 Quasi-high Speed DMU

[img]https://2.bp..com/-hHmxhxpuu80/XFo47_sqW5I/AAAAAAAAX5A/P1kvTcB-LDEk71xbUGZtwnVJv5vjA4uegCLcBGAs/s1600/NDJ3%2BQuasi-high%2BSpeed%2BDMU.png[/img]

NDJ3 “Harmony and the Great Wall” DMU is developed under the transportation demand of Beijing Olympic Games, which commutes between Beijingbei and Yanqing. This DMU is a “2 motor-cars and 7 trailing cars” unit with one motor-car at each end and seven trailing passenger cars fixed in between. The locomotive is equipped with 12V280ZJ diesel engine. The Maximum running speed is 160km/h.

Based on mature technologies, long-term operation and inspection results that got from medium and large overhaul, the performance and reliability of main components such as diesel engine, bogie frame, car body, traction motor used for NDJ3 DMU have been well verified. It is well suited for long steep grade.

Since NDJ3 DMU was formally put into operation in 2008, this train set has been running safely and reliably for 8 years and was well recognized by customers, It was awarded the first Prize of Scientific & Technological Progress of China Railway Society in 2009.

Basic parameters of diesel motor-car:

Purpose
Passenger transport

Rail gage
1435mm

Transmission mode
AC-DC transmission

Axle arrangement
A1A-A1A

Axle load
21t

Max. Service Power of the engine
2760kW

Max. Operating Speed
160km/h

Constant speed
59.3km/h

Maximum starting tractive effort
187.3kN

Continuous tractive effort
121kN

Minimum curvature radius negotiated
145m

Capacity of fuel tank
5500L

Locomotive length
20990mm


2. DF8B High-Power Freight Diesel Locomotive

[img]https://3.bp..com/-_efZTyHasrc/XFo4mAhi-7I/AAAAAAAAX44/X4Quuase-5IKoJQQdv6yyh9qRe68l-5ygCLcBGAs/s1600/DF8B%2BHigh-Power%2BFreight%2BDiesel%2BLocomotive.jpg[/img]

DF8B diesel locomotive, as the mainline freight diesel locomotive with the highest power for single diesel engine in China, is the ideal traction power for speedup of heavy mainline freight transportation. Equipped with 16V280ZJA diesel engine, JF204D synchronous main alternator and ZD109C traction motor, the locomotive has speed of more than 90km/h at maximum constant power. It was awarded “Second Prize of MOR Scientific & Technological Progress” and Jiangsu Province Excellent New Product “Golden Ox Prize”.

New technologies such as microcomputer control system, large-screen color liquid crystal display, dynamic brake unit for self-load test at full power and etc., are utilized in this locomotive. It is modern in electric control technology and excellent in dynamic performance.

DF8B diesel locomotive is widely used in state railway and industrial and mining companies, this locomotive is designed by taking DF8B diesel locomotive as prototype. It has been exported to Venezuela, Iran, Guinea and so on.

Basic locomotive parameters:

Purpose
Freight transport

Rail gage
1435mm

Transmission mode
AC-DC transmission

Axle arrangement
Co-Co

Axle load
25t

Max. Service Power of the engine
3680kW

Max. Operating Speed
100km/h

Constant speed
31.2km/h(28.2km/h)

Maximum starting tractive effort
520kN

Continuous tractive effort
340kN(369kN)

Minimum curvature radius negotiated
145m

Capacity of fuel tank
9000L

Locomotive length
22000mm

3. DF11G Quasi-high Speed Passenger Diesel Locomotive

[img]https://4.bp..com/-rnHowsZCPH4/XFo4Sq3ariI/AAAAAAAAX4s/W8dIAwnAvecM3DCJ7kMNmtq1x9hBAOOkQCLcBGAs/s1600/DF11G%2BQuasi-high%2BSpeed%2BPassenger%2BDiesel%2BLocomotive.png[/img]

DF11G double-heading quasi-high speed passenger diesel locomotive is specially developed for grand speedup of railway. Currently, it is the main diesel locomotive run on China railway. It is equipped with 16V280ZJA main diesel engine for traction, Lonworks network control is utilized, speed monitoring system is set up for running safety and dynamic brake device is incorporated with full-power self-load function. Auxiliary diesel generator set with power supply functions for passenger cars is also equipped.

The double-heading locomotive is of enough power reserve, superior performance of starting and accelerating, guaranteed reliability of key components, which is suitable for long routing.

Basic locomotive parameters:

Purpose
Passenger transport

Rail gage
1435mm

Transmission mode
AC-DC transmission

Axle arrangement
2(Co-Co)

Axle load
23t

Max. Service Power of the engine
2x 3610kW

Max. Operating Speed
170km/h

Constant speed
83.5 km/h

Maximum starting tractive effort
2x 193kN

Continuous tractive effort
2 x 125kN

Minimum curvature radius negotiated
145m

Capacity of fuel tank
2x 7500L

Locomotive length
2x 22200mm


4. DF7G Diesel Shunting Locomotive

[img]https://3.bp..com/-g98KrkuFFnc/XFo4Df5HZiI/AAAAAAAAX4o/x4qgsmaapggJTUolOYVNdChcRnmsEZyiQCLcBGAs/s1600/DF7G%2BDiesel%2BShunting%2BLocomotive.jpg[/img]

DF7G AC-DC electric transmission diesel shunting locomotive is mainly used for marshalling and shunting operations in large and medium sized marshalling yards. It is equipped with 12V240ZJ diesel engine, its main components are interchangeable with the ones of DF4 and DF5, and its components are most suitable for DF4. Based on DF5, improvements on generalization, serialization, modularization, standardization have been made. It adopts modular construction of outside corridor and underframe load-bearing, diesel engine with stepless speed adjusting gear; The main transmission system adopts two excitation systems of PLC constant power excitation and original excitation of power adjustable resistance.

The auxiliary system of the locomotive adopts auxiliary electrical transmission, the cooling fan and air blower of traction motor driven by AC motor. The control system adopts color liquid crystal display, with the functions of data display, fault diagnosis, detection and records, etc.

Purpose
Shunting and transfer operation for the industrial and mining companies or rail line

Rail gage
1435mm

Transmission mode
AC-DC transmission

Axle arrangement
Co-Co

Axle load
138t

Max. Service Power of the engine
1840kW-2200kW

Max. Operating Speed
100km/h

Constant speed
17.6km/h

Maximum starting tractive effort
442.1kN

Continuous tractive effort
317kN

Minimum curvature radius negotiated
100m

Capacity of fuel tank
6000L

Locomotive length
19400mm


Source:
https://www.autoreportng.com/2019/02/lagos-ibadan-railway-see-trains-that.html



Because Buhari and APC are old, this is the best they can offer while there are better trains

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by yemi15(m): 8:14am On Feb 06, 2019
CityNGR:
WEE YOU KIP QUAYET!! WAKANDA NONSENSE ASSEMBLAGE OF APPARITION ARE THESE?

I SAID IT BEFORE THAT YOU ARE A BROWN ENVELOPE REPORTER.... I HAVE PROOFS!!




SEE SOUTH AFRICA BELOW

What did you expect from an "educated" slave that thinks this is an achievement? SMH.
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by okeynelson: 8:16am On Feb 06, 2019
helinues:
Better than nothing Better than the money been shared within few people
4+4 = 2023
na only spirit go vote for burari ooo.... weyreh 4-4=2023 olodo oshi...
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Resistivity56(m): 8:17am On Feb 06, 2019
nice and welcome development as you can live in Ibadan and work in Lagos

Check my signature to migrate to Canada

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by helinues: 8:18am On Feb 06, 2019
okeynelson:


na only spirit go vote for burari ooo....
weyreh 4-4=2023 olodo oshi...

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Quorax: 8:20am On Feb 06, 2019
dadark:


thinkin that private investors will build new stuffs for una is wrong....they are only good in maintening stuffs already around and keep it running....

its not their job to build new stuffs for you....

it seems you nigerians misunderstood what privatization realy means....

You should have directed this to the person I quoted. undecided
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 8:25am On Feb 06, 2019
Quorax:


You should have directed this to the person I quoted. undecided

i guess you misunderstood the concept of privatisation too....many nigerians were clappin when fee dee fee was privatisin so many things....

i was amongst the very few that was against it....

i knew it will end in a mess.....
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Chitumu: 8:30am On Feb 06, 2019
CityNGR:
WEE YOU KIP QUAYET!! WAKANDA NONSENSE ASSEMBLAGE OF APPARITION ARE THESE?

I SAID IT BEFORE THAT YOU ARE A BROWN ENVELOPE REPORTER.... I HAVE PROOFS!!




SEE SOUTH AFRICA BELOW
THESE ARE INTRACITY TRAINS, ABUJA HAS THAT. U DUMBASS.

1 Like

Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Quorax: 8:31am On Feb 06, 2019
dadark:


i guess you misunderstood the concept of privatisation too....many nigerians were clappin when fee dee fee was privatisin so many things....

i was amongst the very few that was against it....

i knew it will end in a mess.....
I repeat, you should direct your comments to the guy I quoted cos I asked him on which tracks are the private companies going to put their trains?

Free me Biko
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 8:33am On Feb 06, 2019
Quorax:
I repeat, you should direct your comments to the guy I quoted cos I asked him on which tracks are the private companies going to put their trains?

Free me Biko

nooo,i no go free you....feel the heat too....

hahahaha.....dont mind....
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Nobody: 8:35am On Feb 06, 2019
We haven't even set our eyes on the trains yet and this grasshopper is already doing post about trains that FG might order, since when did you become procurement engineer for the FG. Other African countries are not even making noise about the speed trains that they have ( Ethiopia and South Africa ) it's these pieces of junk you are making noise for. I no blame you, knowing Nigerian Government very well, they will import one scrap at an exorbitant price.
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Quorax: 8:37am On Feb 06, 2019
dadark:


nooo,i no go free you....feel the heat too....

hahahaha.....dont mind....
cry cry cry
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by dadark: 8:40am On Feb 06, 2019
Quorax:
cry cry cry

okay okay....have a nice day....happy now....??
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by bigiyaro(m): 8:42am On Feb 06, 2019
it's amazing how some people are able to celebrate mediocrity. no wonder okrika market dey move.

(1) (2) (3) (4) (5) (Reply)

The Commissioning Of The Ilaje Bariga Ferry Terminal (Photos) / President Jonathan Launches New E-passport / Maiduguri 45°c: Fire Service Sprays Cool Water To Mitigate The Harsh Weather

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 73
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.