Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,606 members, 7,812,987 topics. Date: Tuesday, 30 April 2024 at 01:39 AM

Ambode Has Performed Satisfactorily, Says Buhari - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Ambode Has Performed Satisfactorily, Says Buhari (418 Views)

Yahaya Bello: APC Has Performed Far Beyond PDP’s 16-Year Achievement / Ambode Has Done Well, deserves Second Term - Osinbajo To Tinubu / Ambode Has Made Himself Emperor In Lagos - Sanwo-Olu Campaign DG (2) (3) (4)

(1) (Reply) (Go Down)

Ambode Has Performed Satisfactorily, Says Buhari by Dammylink(m): 9:00pm On Apr 24, 2019
President Muhammadu Buhari on Wednesday commissioned world-class Oshodi Transport Interchange, read more
Re: Ambode Has Performed Satisfactorily, Says Buhari by sarrki(m): 9:01pm On Apr 24, 2019
No Mr President he performed woefully

Eg

Ile zik to Sango Ota toll gate is approximately 20km

Did you know Lagos State Government installed 4 x 35 sq mm armored copper cable to interconnect the Street lights on both side of the road from ile-zik to Ojokoro

That is over 40km if both sides are considered.

Because they didn't extend the street lights to the toll gate they went as far as Ojokoro which is about 16km or thereabout.

Each Street light pole structure had 25m span apart.

There are about 1280 nos of street light polls on that corridor fitted with 250W bulb.

The cost of 1 meter of cable as at time of installation was N12,000 per meter

The cost of each Street light pole with the accessories was around N310,000.

The installation cost for every pole was pegged at N60,000 inclusive of casting and escavation.

Lagos State invested borrowed funds to the tune of

(32,000x 12,000 + 310,000 x 1280 + 60,000* 640)

That is N819,200,000 which is

$2.28 million.

Guess what everything was vandalised under the guise of building a BRT corridor on Ile-zik to toll gate. We don't know the whereabout of the entire infrastructure. Where the cable alone is valued over $1m

As I write the entire road is darker than hell at
Night.

Ambode is a disaster that befell Lagos.
Re: Ambode Has Performed Satisfactorily, Says Buhari by IbyOneGod: 9:04pm On Apr 24, 2019
If so, why did you throw him out? Your governance is a scam.
Re: Ambode Has Performed Satisfactorily, Says Buhari by Amuocha: 9:05pm On Apr 24, 2019
sarrki:
No Mr President he performed woefully

Eg

Ile zik to Sango Ota toll gate is approximately 20km

Did you know Lagos State Government installed 4 x 35 sq mm armored copper cable to interconnect the Street lights on both side of the road from ile-zik to Ojokoro

That is over 40km if both sides are considered.

Because they didn't extend the street lights to the toll gate they went as far as Ojokoro which is about 16km or thereabout.

Each Street light pole structure had 25m span apart.

There are about 1280 nos of street light polls on that corridor fitted with 250W bulb.

The cost of 1 meter of cable as at time of installation was N12,000 per meter

The cost of each Street light pole with the accessories was around N310,000.

The installation cost for every pole was pegged at N60,000 inclusive of casting and escavation.

Lagos State invested borrowed funds to the tune of

(32,000x 12,000 + 310,000 x 1280 + 60,000* 640)

That is N819,200,000 which is

$2.28 million.

Guess what everything was vandalised under the guise of building a BRT corridor on Ile-zik to toll gate. We don't know the whereabout of the entire infrastructure. Where the cable alone is valued over $1m

As I write the entire road is darker than hell at
Night.

Ambode is a disaster that befell Lagos.

Worst governor in HISTORY of Lagos

1 Like 1 Share

Re: Ambode Has Performed Satisfactorily, Says Buhari by sarrki(m): 9:07pm On Apr 24, 2019
Amuocha:


Worst governor in HISTORY of Lagos

A total disaster

1 Like

Re: Ambode Has Performed Satisfactorily, Says Buhari by GraGra247(m): 9:09pm On Apr 24, 2019
Performed satisfactory because they removed and hid the tankers along Oshodi Apapa on the very day of the presidents visit.

Of course check back next day and its tanker business as usual.
Re: Ambode Has Performed Satisfactorily, Says Buhari by johnemeka(m): 9:10pm On Apr 24, 2019
Ok

Re: Ambode Has Performed Satisfactorily, Says Buhari by Jesusloveyou: 9:19pm On Apr 24, 2019
ambode can try again in 2023.
Re: Ambode Has Performed Satisfactorily, Says Buhari by viyon02: 9:59pm On Apr 24, 2019
Ministrail appointment loading

(1) (Reply)

I’d End Apapa Gridlock Within 60 Days In Office – Sanwo-olu / Court Suspends Proceedings Of Okorocha's Case / Rt. Hon. Emeka Ihedioha CON Has Approved The Following Appointments

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 13
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.