Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,748 members, 7,809,866 topics. Date: Friday, 26 April 2024 at 04:16 PM

90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites - Travel (3) - Nairaland

Nairaland Forum / Nairaland / General / Travel / 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites (51690 Views)

Lagos-Ibadan Railway: Update From Various Sites As CCECC Begins Test Run / The Lagos Metro-Line Is Almost Completed (See PHOTOS) / Ikeja Bus Terminal That Was Commissioned Has Not Been Completed. See Why (PHOTO) (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by farem: 7:12pm On May 16, 2019
RexTramadol1:
Good work




But not 90%

Oya, make you bring Una facts and figures to dispute this official estimate

1 Like 2 Shares

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by olril17(m): 7:13pm On May 16, 2019
tyup:


Ion knw if ur lying on the rest but

korodu to Sagamu where did you see it done undecided

Lagos to ibadan road is just 40% complete for over 5years.

You can be a mediocre but for we in Ibadan we want nothing but the best and total completion
guy is a liar..
lol..he even included lagos-ota- abeokuta expressway...
one of the worst roads in ogun state.
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Nobody: 7:21pm On May 16, 2019
All this red sand na em i no just understand
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by whallerry(m): 7:26pm On May 16, 2019
olaboy33:
Lagos Ibadan Expressway √√
Lagos Ibadan Railway √√
Oyo-Ogbomosho express √√
Lagos-ota-Abeokuta expressway √√
Sagamu-ore expressway √√
Apapa-Tincan-mile2 -oshodi-oworonshoki expressway √√
Ikorodu-Sagamu road √√


What more can we(south west) ask from buhari in terms of roads?..
Which Lagos-ota-Abeokuta expressway are you talking about please
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by PrinceGeorge1(m): 7:38pm On May 16, 2019
olaboy33:
Lagos Ibadan Expressway √√

Lagos Ibadan Railway √√

Oyo-Ogbomosho express √√

Lagos-ota-Abeokuta expressway √√

Sagamu-ore expressway √√

Apapa-Tincan-mile2 -oshodi-oworonshoki expressway √√

Ikorodu-Sagamu road √√



What more can we(south west) ask from buhari in terms of roads?..


Ur such a dummy
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by StaffofOrayan(m): 7:56pm On May 16, 2019
GrammarNazi1:

...great...

1 Like 1 Share

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Deathisfree: 8:06pm On May 16, 2019
obembet:


I missed u, u are not always online anymore. Hope all is well


Lols. Hunger dey town. He probably got a cleaners job

1 Like

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Deathisfree: 8:09pm On May 16, 2019
Slavery never stop. Blacks doing the hard labours

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by 989900: 8:19pm On May 16, 2019
tyup:


[s]Ion knw if ur lying on the rest but

korodu to Sagamu where did you see it done undecided

Lagos to ibadan road is just 40% complete for over 5years.

You can be a mediocre but for we in Ibadan we want nothing but the best and total completion[/s]

1 Like 1 Share

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by blackslayer: 8:25pm On May 16, 2019
hope the nigerian govt are ensuring nigerian workers acquire these skills from the chinese and improve on them...i hope they are doing that!!!

1 Like

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by blackslayer: 8:29pm On May 16, 2019
tyup:


Ion knw if ur lying on the rest but

korodu to Sagamu where did you see it done undecided

Lagos to ibadan road is just 40% complete for over 5years.

You can be a mediocre but for we in Ibadan we want nothing but the best and total completion

this is the mind set i love! good on you...people that demand the best usually do their best also, generally speaking!

1 Like

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by plaindealer: 8:29pm On May 16, 2019
whallerry:


Which Lagos-ota-Abeokuta expressway are you talking about please



Is it not being rehabilitated and under construction as we speak?

3 Likes 1 Share

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by starpower(m): 8:37pm On May 16, 2019
That ikorodu sagamu is really on track. Took that route last week and am proud of my minister. Thank you BUHARI.
tyup:


Ion knw if ur lying on the rest but

korodu to Sagamu where did you see it done undecided

Lagos to ibadan road is just 40% complete for over 5years.

You can be a mediocre but for we in Ibadan we want nothing but the best and total completion

1 Like 1 Share

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by starpower(m): 8:41pm On May 16, 2019
olril17:

guy is a liar..
lol..he even included lagos-ota- abeokuta expressway...
one of the worst roads in ogun state.
.
The road is currently being reconstructed from Lagos. Time will tell. Work is even ongoing during this raining season.

1 Like

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Detolanny(m): 8:41pm On May 16, 2019
emperorblog21:
THEM NEVER DO MUSHIN-OSHODI OWN O
Don't mind them, let them be lying to themselves. I'm not arguing the completion rate along the Abeokuta-Ibadan axis of the rail {which terminated before the level crossing at Iju (he area where there was a train accident 2 weeks ago involving a stupid keke driver that claimed the lives of all passengers, including the stupid keke driver)} but there's still a whole lot of work to be done on the Iju-Lagos axis of the project. The rail passes through the front of my gate at iju-ishaga and I can categorically tell you guys that that this project can never be ready by December this year. I don't even know why Rotimi Ameachi is in a hurry to deliver this rail project by May 2019 except if they want to do the Ambode magic by commissioning a project that is still WIP. Iju-Fagba is still pending, they are still trying to clear the land from Fagba - Agege, Agege-Ikeja is still untouched, Ikeja-Oshodi is still untouched, Oshodi-Mushin is still untouched, Mushin-Yaba is till further notice. Except if the 90% completion they are talking about is for a different rail project but if it's the same Lagos-Ibadan rail project being handled by the Railway arm of CCECC, then It can't be completed in 2019. They are still battling with the Crictical Path of the project (which is clearing the land, levelling it and pouring granite) not to talk of laying the tracks proper. Even the Station they are building at Agbado Crossing is not even up to 20% completion. I would have posted pictures but it's dark now and light no dey.
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by plaindealer: 8:43pm On May 16, 2019








Reconstruction/Rehabilitation of Gbongan-Iwo-Oyo road in Osun/Oyo States

- Originally awarded in 2011, with 18-month completion period.

- Abandoned around 2014.

- Contractor mobilised back to the site in 2017.

1 Like

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Kyrx(m): 8:47pm On May 16, 2019
Bossjakande:
its not enuf pls. by the time we are done some pple will use 2 legs to jump inside lagoon thierself
I want baba to make road with gold I know is possible. Yoruba is best Yoruba is life. Yoruba land is small london


You people are mostly annoying, must we put tribal sentiments into everything? Please let's be mature.
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by plaindealer: 8:56pm On May 16, 2019
Detolanny:

Don't mind them, let them be lying to themselves. I'm not arguing the completion rate along the Abeokuta-Ibadan axis of the rail {which terminated before the level crossing at Iju (he area where there was a train accident 2 weeks ago involving a stupid keke driver that claimed the lives of all passengers, including the stupid keke driver)} but there's still a whole lot of work to be done on the Iju-Lagos axis of the project. The rail passes through the front of my gate at iju-ishaga and I can categorically tell you guys that that this project can never be ready by December this year. I don't even know why Rotimi Ameachi is in a hurry to deliver this rail project by May 2019 except if they want to do the Ambode magic by commissioning a project that is still WIP. Iju-Fagba is still pending, they are still trying to clear the land from Fagba - Agege, Agege-Ikeja is still untouched, Ikeja-Oshodi is still untouched, Oshodi-Mushin is still untouched, Mushin-Yaba is till further notice. Except if the 90% completion they are talking about is for a different rail project but if it's the same Lagos-Ibadan rail project being handled by the Railway arm of CCECC, then It can't be completed in 2019. They are still battling with the Crictical Path of the project (which is clearing the land, levelling it and pouring granite) not to talk of laying the tracks proper. Even the Station they are building at Agbado Crossing is not even up to 20% completion. I would have posted pictures but it's dark now and light no dey.



The fact that they haven't touched all the roads you mentioned means the ones mentioned are lies and haven't been touched or you just mean if they can't fixed the ones you mentioned, they shouldn't do anything at all unless they start fixing the hundreds of thousands or millions of roads in Nigeria.?

What's the crying completing the railway in 2019 anyway? Last time I checked, work is going on non stop.

You are not making any sense. When they don't you complain, when they finally do, you still complain.

3 Likes

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Nobody: 9:06pm On May 16, 2019
AutoReportNG:
The question on the lips of many Nigerians have been when will the Lagos-Ibadan Railway start work after all the minister promised last year that by May 2019 the train would have been working. In as much as we try to reply series of emails, calls, and messages on the social media, it is expedient to note that we can't answer all the questions as we don't work directly or closely with the minister of transportation, RT. Hon Rotimi Amaechi but we can assure you that work is ongoing at various locations at Lagos, Ibadan, and Abeokuta.

The minister was in Lagos recently where he toured Apapa, Constain, Ebute, Agege and Agbado Stations to see things for himself and see how work is going.

For example, Costain is getting a new Bridge, as part of the Lagos-Ibadan Rail project. The old Bridge will be demolished (it’s too low for the new train), Construction has already started on the new one. Also, Demolitions are ongoing from the site of the Apapa Station to make way for the railway line.

[img]https://1.bp..com/-PlwM8xPmSnQ/XN18cKdtvWI/AAAAAAAAbb8/mJBlFUgiloQq6WNv3jNzgJRue6LwK3ysgCLcBGAs/s1600/Lagos_Ibadan_Rail_Project_001_AutoReportNG.com.jpg[/img]

Recently, the completion of all civil works and this include, embankment, cuttings, culverts, and bridges have been completed, also, out of the 156.8km Lagos - Ibadan Railway, Section 3 of the measured 45km road between chainage DK75 to DK120 has been done and civil works of this section which includes a 6.67 million cu.m of earthworks, 1 major bridge, 2 medium bridges, 5 underpasses, 12 overpasses, and 72 culverts have all been completed. The Bridge at DK77 has been completed too and ready to be used.

So far, the tracks now stand at KM 123, now in Oyo State they promised to get to the final stop (KM 158) in Ibadan by end of May or early June

These are some of the images from the site across the 3 states

[img]https://1.bp..com/-PlwM8xPmSnQ/XN18cKdtvWI/AAAAAAAAbb8/mJBlFUgiloQq6WNv3jNzgJRue6LwK3ysgCLcBGAs/s1600/Lagos_Ibadan_Rail_Project_001_AutoReportNG.com.jpg[/img]

[img]https://2.bp..com/-XXlbbYTvPco/XN18b2JPb5I/AAAAAAAAbb0/HaHvZjJGi5s_oY29b8WxbF6fjHsW9Pe1QCLcBGAs/s1600/Lagos_Ibadan_Rail_Project_002_AutoReportNG.com.jpg[/img]

[img]https://4.bp..com/-N9_m31oMYAw/XN18dDYu4AI/AAAAAAAAbcA/Ex5FNgI79qgKLN9lM_cHs0y12pKQH0yEwCLcBGAs/s1600/Lagos_Ibadan_Rail_Project_004_AutoReportNG.com.jpg[/img]

[img]https://4.bp..com/-SDxNLgqU1EQ/XN18dohSg8I/AAAAAAAAbcE/wF2H98qFtgsAJZkqhdSn7WuPcLLh2d4YgCLcBGAs/s1600/Lagos_Ibadan_Rail_Project_005_AutoReportNG.com.jpg[/img]

[img]https://1.bp..com/-Zt-xd1PLXmo/XN18d6QbLEI/AAAAAAAAbcI/R6NVSFIxoBQhrTnojkOvX_ym1y-3Q3I-QCLcBGAs/s1600/Lagos_Ibadan_Rail_Project_006_AutoReportNG.com.jpg[/img]

[img]https://1.bp..com/-F3zZYUpn2-w/XN18gryZHHI/AAAAAAAAbcc/-uukF1Zd8Jw4q0GQ-ZvGRIS28Mmp8vvkACLcBGAs/s1600/Lagos_Ibadan_Rail_Project_012_AutoReportNG.com.jpg[/img]

[img]https://1.bp..com/-oCqnBrmFQ_0/XN18iOtFSPI/AAAAAAAAbcs/0CXx94tk-pEG_4jdGP0gVBICWgjwA-IfACLcBGAs/s1600/Lagos_Ibadan_Rail_Project_015_AutoReportNG.com.jpg[/img]

[img]https://3.bp..com/-dyO6Z_DKMRI/XN18jf5pLgI/AAAAAAAAbc4/Orb2_DCgYOE1ofEIss6JILD7V5zjWB1DACLcBGAs/s1600/Lagos_Ibadan_Rail_Project_018_AutoReportNG.com.jpg[/img]

[img]https://2.bp..com/-IBO42WIDl1Y/XN18knrKNMI/AAAAAAAAbdE/CB0f6aim-dETmd6KllJUkhUIr7n-dNPNACLcBGAs/s1600/Lagos_Ibadan_Rail_Project_021_AutoReportNG.com.jpg[/img]

[img]https://4.bp..com/-g0D4A3eHau8/XN18llkuGuI/AAAAAAAAbdQ/YvWigAju13MzrTBpquUeIcQeIsNMrSYfACLcBGAs/s1600/Lagos_Ibadan_Rail_Project_024_AutoReportNG.com.jpg[/img]

[img]https://3.bp..com/-eOLb70hEksM/XN18rb79zbI/AAAAAAAAbeM/6EqICzKOiOoLdaDHT5phbV-Q4602TCEXgCLcBGAs/s1600/Lagos_Ibadan_Rail_Project_039_AutoReportNG.com.jpg[/img]

Editorial Note:
We have about 55 images and trust us, we can't upload all the images here, if you have more data or you need to see more images and feedback, kindly check on the source for more amazing and exciting images from this tour.



Source:
https://www.autoreportng.com/2019/05/90-of-lagos-ibadan-railway-has-been.html
I thought campaign is over?!
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by plaindealer: 9:08pm On May 16, 2019
olril17:

what of osun state...
we have not felt any federal presence.. all our federal roads are bad...
so pls don't lump all of us in SW together with your madness...speak for yourself next time.







Federal Housing estate almost completed and Ojutu Bridge in Ilobu Osun, almost completed
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Bluntemperor: 9:18pm On May 16, 2019
Pls,help us ask Mr Amechie-Hon Min.of Transport-which Custain-is itthe one after Stadium in Lagos,for the past 4-months or so nothing is going on,i still passed the place last week,workers are not doing anything visible,in fact the Chinese must have got stocked.Then let's ask Min.of.Works,the extent of work performed on Ikorodu-Shagamu- Road is snail speed.This particular Road should be a lot of interest to the public because most Trailers routes their products to NNPC Under pipelines,hence heavy road traffic.we expect Mr Fashola and Mrs Erewa-the woman in Diaspora.to be interested more in this particular project because of its immense benefits to the Public.Why is it that Contractors don't place the period of Project Starting and Completion on the Road to gauge against time of completion by the public.?This is deliberate.
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by badman007(m): 9:24pm On May 16, 2019
Bitter, sweet.

Happiness and Shame..

If only Buhari understands this feeling.
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by obailala(m): 9:35pm On May 16, 2019
Odingo1:
The problem with Nigeria is that some region want it all and they never want others to get even one thing and they are very happy about that. GEJ started all those project in SW yet they hate him. SW railway, Ibadan express, Ore are all are PDP project, PDP spread project all over Nigeria and where building all simultaneously, you cant compare it when a project is built only in North West and South West, that is not development. The SW jubilating should remember that the money used in building this is coming from Niger Delta oil money.
PDP spread projects all over Nigeria, APC is also spreading projects all over Nigeria. Enough of all this uninformed idle talk.

By the way GEJ did not start Lagos Ibadan rail. Neither did he start the Lagos ibadan Expressway or the benin Ore road. He didnt start any of those any he didnt finish any of them.
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by TGMISKY(m): 9:37pm On May 16, 2019
God bless Nigeria
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by jeff1980(m): 9:40pm On May 16, 2019
We prayed it will not end up as a death trap by maintenance problem
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by ibknaanii80: 9:46pm On May 16, 2019
dedonfranco:
APC don't need South-South & South-East to stay in power for more 30year's. They luv PDP with nothing to show for it. 4year's of Buhari is better than 16year's of PDP.


What have APC done in the last 4 years that superseded this one of the things done by goodluck ( building 9 Federal University). Until we tell yourself the truth ad act on it, progress will be hard to come by.
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by TemmyT002(m): 9:46pm On May 16, 2019
This is freaking cool
Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by rafindo(m): 9:49pm On May 16, 2019
tyup:


Ion knw if ur lying on the rest but

korodu to Sagamu where did you see it done undecided

Lagos to ibadan road is just 40% complete for over 5years.

You can be a mediocre but for we in Ibadan we want nothing but the best and total completion
.


If don't know the road mentioned ,it will be better you keep quiet especially on ikorodu to sagamu road.even though the standard of the road is poor to me base on the fact it is not dual carriage but work has been done up to 45%
.the jubilee to 1st gate section will soon be completed .then from pz onwards ita oluwo to ogijo is on track.from Phoenix to likosi is completed. From lais to vio office has been completed.

1 Like

Re: 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites by Dracas: 9:50pm On May 16, 2019
Amaechi should remember to build some in the south-south and south-east where he comes from.

(1) (2) (3) (4) (5) (Reply)

Pictures Of A Nairalander Trip To Ghana / African Migrant Caught Hiding In Car's Engine In Attempt To Enter Spain(photo) / China’s Biggest Ever Aircraft Carrier In Pictures

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 57
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.