Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,559 members, 7,816,351 topics. Date: Friday, 03 May 2024 at 10:02 AM

How To Get Building Plan Approval In Lagos State. - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / How To Get Building Plan Approval In Lagos State. (867 Views)

My Experience With Building Approval In Lagos / How To Get Building Plan Approval In Lagos State. / DEVELOPER ADVICE How To Get Building Plan Approval In Lagos (2) (3) (4)

(1) (Reply)

How To Get Building Plan Approval In Lagos State. by Treash(m): 3:19pm On Sep 27, 2019
How to Get Building Plan Approval in Lagos State.

The Lagos State Physical Planning Permit Authority (LASPPPA), a parastatal under the Ministry of Physical Planning and Urban Development is in charge of Development Permit in Lagos State. Your land must have a Certificate of Occupancy (CofO) before your building can be assessed by the appropriate authorities.

Step One: Get Architectural Drawings, Building Plan and Survey Plan.

Contact a certified architect that is aware of Lagos State building plan approval peculiarities to prepare a design and plan for you.

Tips:
Ensure that the rooms are cross ventilated.
Room sizes must not be less than 3m x 3.6m.
Ensure that the scaling is properly done.
Use legible lines.

Step Two: Get Demand Notice from the District Officer and Make Payment.

Send your architectural drawings, building plan, title documents and survey plan to the district office for assessment and vetting after which it will be marked for approval. After getting an official government assessment and endorsement of your design, you’ll be required to pay a fee which is calculated based on your proposed design. Pay the fee at the bank. Carefully read and follow the instructions on the Payment Advice.

Tips:
The Payment Advice contains the Revenue Code and Agency Code that you will use to fill the bank teller.
Avoid paying into a wrong account or using a wrong code
Avoid time wastage due to the issuance of a receipt. Paying cash is faster than paying with cheques. Use any bank with fast internet connectivity.

Step Three: Confirmation of Receipt at the Accounts Department of the District Office.

The accountant at the Physical Planning office will log on to LASG system to confirm your payment.

Tip:
Don’t wait until last minute to confirm your receipt because internet connection might be slow or unavailable.

Step Four: Inspection by the District Office

A team from the District office will inspect your site to be sure that your land and other attributes of the building corresponds to what you have in the documents you presented. The Site Inspector, Charting officer, Architect and Site Engineer will write their reports. A difference in land size or other attributes presented on the plan and the actual land attributes could lead to problems.

Tips:
Clearly indicate the beacon numbers as shown on the survey plan on block work on the site.
Monitor them so that they don’t visit the wrong site.

Step Five: Submission of Documents

The following documents are required for building plan approval in Lagos State:

�5 sets of Architectural Drawing.
�5 sets of Mechanical and Electrical Drawings (If applicable).
�5 sets of Structural Drawing and Calculation Sheets.
�5 Copies of Survey Plan and 1 original.
�Certified true copy of the Certificate of Occupancy/Consent (Title Document).
�Confirmation Letter from Lands in Lieu of Consent (if applicable).
�Letter of supervision from COREN registered engineers for the structural drawings.
�Environmental Impact Analysis Report (if applicable).
Soil Test report (if applicable).
�Site Photographs.
�Development Levy receipt.
�Evidence of payment of assessment fees.
�Land Use charge, Tenement Rate receipt or sworn affidavit in lieu of tenement rate.
�Evidence of payment of ground rent (if Applicable).
�Copy of Demand Notice for current year ground rent (if applicable).
�Clearance Letter from L.U.A.C. (if applicable).
�Clearance letter from Housing, Fire, Transportation, and Drainage (if Applicable).
�Copy of Confirmation letter from NTDA (if applicable).
�2 Passport Photograph of Applicant(s).
�Electronic tax clearance of applicant (with a copy of last payment receipt for tax).
�Copy of certificate of incorporation (if the applicant is a company).
�Two directors tax clearance (if the applicant is company name).
�Evidence of Pay as You Earn of the company. (If applicable).
�Copy of most recent company tax clearance.

Tips:
�Ensure that you have all the necessary documents, especially tax and structural drawing papers, to avoid unnecessary delays of the approval process.
�Ensure that your tax papers are up-to-date as tax verification will be done at LIRS.
�Generally, for bungalows or one-storey buildings, you can get your building plan approval within 6 weeks if you have complete documents. Also, your Architect, Surveyor or any other knowledgeable member of your building team can help you get your building plan approved.

Barr Ayo Adeolu Aderinto
08068088866, 09090803205.
ay4u888@gmail.com


[source: http://castleshub..com/2018/04/5-step-guide-to-get-building-plan.html]
Re: How To Get Building Plan Approval In Lagos State. by Treash(m): 5:05pm On Sep 29, 2019
Call us
Re: How To Get Building Plan Approval In Lagos State. by Treash(m): 11:28am On Nov 04, 2019
Waiting still

(1) (Reply)

Brand New Tastefully 3bedroom Flat @ Opic Estate +pictures / Trillion Park Estate Alatishe Bogije Ibeju Lekki Lagos. Land For Sale / Land + 3 Bed Room Bungalow For Sale

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 15
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.