Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,544 members, 7,827,032 topics. Date: Tuesday, 14 May 2024 at 05:03 AM

Build This 4 Bedroom Duplex To Carcass in 2 MONTHS - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Build This 4 Bedroom Duplex To Carcass in 2 MONTHS (9167 Views)

See This 4 Bedroom Bungalow Architectural Design / See This 4 Bedroom Bungalow Architectural Design / See This 4 Bedroom Bungalow Architectural Design (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 10:17pm On Dec 09, 2019
Hello Great Followers.

We bring you another 4 Bedroom Executive Duplex with Swimming Pool. The Design can fit in on a half plot of 30/120fit or 30/100fit but as it is on this design. It's on 60/120fit with Swimming poor and other facilities.

One can build this Duplex from foundation to Roofing (Carcass only) on Normal Foundation and on a dry land. Finishing Cost is to client taste and discretion.


GROUND FLOOR
- Ante Room
- Visitor's Toilet
- Large Sitting Room
- Dinning
- Bar
- Kitchen
- Store
- Laundry Room

UPPER FLOOR
- Study Room
- Two Large rooms ensuite
- Master's Bedroom with Walk in Closet
- Family Lounge
- Terrace.

EXTERNAL FEATURES
- Swimming Pool
- Gen House
- Security House
- Car Park for 6 Cars
- Borehole
- Over Head Water Stand
- Soak Away
- And an amazing Landscape

We offer Other services like
- Structural Design with calculation sheets
- Mechanical Design with details
- Electrical Design with energy efficiency and quality calculations
- Plumbing Design with details


We also do construction of our designs with a free BOQ for clients we are doing construction for.


For more details and enquiries - Call or WhatsApp us on 07038166370, 08081465833 dennis3ddesigns@gmail.com or info@dennis3dconstructions.com.ng

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 10:19pm On Dec 09, 2019
We have some other views of the Duplex that shows all that it got
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 10:25pm On Dec 09, 2019
See the Pool Side View - Close Range View

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 6:44am On Dec 10, 2019
Arial view - Because land is scarce we try as much to manage our designs to give the best use a land can have while adhering to the basic principles of designing which is creating space, functionality, beauty, style and technological advancement while appreciating nature through our beautiful landscape.

In design we promote green environment and architecture. Ensuring good Oxygen and airflow in the premises.

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 7:10am On Dec 10, 2019
See Night View of the Design

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 8:50am On Dec 10, 2019
More Views. Close Main Door Entrance

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 12:35pm On Dec 10, 2019
Very Portable and can equally be built on Half plot of 30/120fit

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 12:37pm On Dec 10, 2019
Interested in the plan.
Call or WhatsApp on 07038166370
Or email at dennis3ddesigns@gmail.com or info@dennis3dconstructions.com.ng
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 3:39am On Dec 11, 2019
More Views

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 4:03am On Dec 11, 2019
Note: Cost of construction can vary from location to location. It could be less than this estimated or it could be more based on economic market conditions of demand and supply as at the time of construction.

At Dennis3D Building Designs and Construction Services we offer free consulting for our clients during construction and best advice on the approach and procedures to follow to minimize cost while achieving same goal where possible.

1 Like

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 12:46pm On Dec 11, 2019
We Design and Build with so much accuracy.
One of our projects for a Nairaland client here.

Location: Lakowe, Ibeju Lekki LGA Lagos State

Project Status: Still Ongoing...

1 Like

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 7:51pm On Dec 11, 2019
Check this out and ask questions where necessary and get clarification
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 8:29am On Dec 12, 2019
Plan still available...

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 10:59pm On Dec 12, 2019
See more Views

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 1:48am On Dec 13, 2019
Call or WhatsApp on 07038166370
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 5:59am On Dec 13, 2019
We equally do 3D interior Designs for clients that we do construction for. To enable you appreciate the spaces in the building before its been constructed.

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 6:01am On Dec 13, 2019
A Typical Sitting Room Idea with color pattern.
Remember, we can always try any paint option of your choice that's the Beauty of what we do using 3D Computer Model.

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 12:14pm On Dec 15, 2019
New Day. New Challenges
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 6:28pm On Dec 16, 2019
We are not on break as far as design is concerned
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 11:52pm On Dec 16, 2019
Contact us for reputable design and construction

Another Design - Just to show you how far we can go for you.

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 6:53pm On Dec 17, 2019
Call or WhatsApp us on 07038166370
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 6:53am On Dec 19, 2019
Our work knows no bounds
Safety First.

1 Like

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 10:16am On Dec 19, 2019
Call us
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 6:54pm On Dec 19, 2019
You can always start now. Delay is dangerous and things keep getting higher in the market
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 7:55am On Dec 23, 2019
We design
We build
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 11:55am On Dec 24, 2019
Check us out
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 1:08pm On Dec 24, 2019
wink
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 7:18pm On Dec 24, 2019
Quality Works
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 8:05pm On Dec 24, 2019
We thanks our clients who have worked with us this year

Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 8:57pm On Dec 25, 2019
Design still available
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 11:57pm On Dec 25, 2019
Call
Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(m): 8:14am On Dec 26, 2019
More options

(1) (2) (3) (4) (5) (Reply)

Buy A Plot Of Land For 1M @ Golden Castle Estate (Buy 6 and Get 1 Free)... SOLD / Flats, Miniflats And Room Self Contain For Letting At Mainland Lagos / Identification Of Spyder880 Outside Nairaland.

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 17
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.