Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:29am On Mar 05, 2020 |
Fellow Engineers and Builders, Join me in this journey as we take on the task of completing a 4 bedroom duplex in Abeokuta... and of course it is a SMART HOME Client: A Nairalander Location: Abeokuta, Ogun State I will try and update everyone daily about site activities and I am open to advice and suggestions. Project Details Ground FLOOR Features some section of the ground floor are existing already but we will be modifying some sections and we will be adding an extension to accommodate an office 1 Main Sitting Room (existing) 1 Dining room void at the top with staircase 1 Bedroom Ensuite (existing) 1 KItchen with a store 1 office with conveniences 1 conference room First Floor Features 3 bedroom ensuite 1 living room with balcony 1 Gym 1 laundry room 1 central Lobby The task at hand is to incorporate the proposed extension and bring it up to the same level as the existing building on site
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:24pm On Mar 07, 2020 |
According to the drawings, a new extension to be joined to the existing structure on site of the proposed duplex and we need to add columns to two different location within the the existing building for the sake of structural stability. Setting out and excavation of the proposed extension part of the building started already 1 Like
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:28pm On Mar 07, 2020 |
We poured the foundation blinding and casted the column footings(1200 X 1200)
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:31pm On Mar 07, 2020 |
I had to be so firm about the depth of my foundation and columns with the labourers, these are areas where they usually do what is most comfortable to them.. |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:37pm On Mar 07, 2020 |
We have started raising the Foundation blocks to DPC level already and hopefully by Monday 9/3/2020, we will start backfilling...
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:41pm On Mar 07, 2020 |
We got two 4000litres of Storex tank @70,000 each for this Project and we are planning to drill a borehole next week 1 Like
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:55pm On Mar 12, 2020 |
We backfilled the foundation of the extension yesterday and we casted the DPC today
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:19pm On Mar 12, 2020 |
Laying of DPM
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:28pm On Mar 12, 2020 |
And so we casted the DPC today , even though the mixing machine we used broke down at some point, but it came back to life
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:32pm On Mar 12, 2020 |
We are using hand moulded Blocks for this project, You can see my guys handling that for me
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Nobody: 8:01pm On Mar 13, 2020 |
Following!! God bless Hardworking Engineers like you |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by peterock100: 11:06pm On Mar 13, 2020 |
Hargbo: Please what is DPC because all I'm seeing is black nylon? |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:16pm On Mar 14, 2020 |
peterock100:The Black Nylon is a Polythene that serve as our DPM (damp-proof membrane) and it is a membrane material applied to prevent moisture transmission. We laid it before casting our concrete slab. 1 Like |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by pman06(m): 9:13pm On Mar 14, 2020 |
Which part of abeokuta is this? Can you tell us how much building such might cost? Or how much is involved. The |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:17pm On Mar 15, 2020 |
pman06:The Location is confidential but the Proposed Budget at the time of inception of this project is 18.5million |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:59am On Mar 16, 2020 |
Present stage of work on site, we have successfully raised the extension to Lintel level
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by peterock100: 12:51pm On Mar 16, 2020 |
Hargbo: Thanks bro |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 2:57pm On Mar 25, 2020 |
Casting of a drainage Wall in front of the house
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 3:39pm On Mar 25, 2020 |
We are done with the Ground Floor and all Structural elements are well placed to receive the First Floor..
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 3:50pm On Mar 25, 2020 |
I estimated the cost of buying woods I needed to cast the formwork for the First floor slab + workmanship to be around 750k.. And to rent the same wood + workmanship is around 320k.. .So I eventually opt for wood rentage to save cost...
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 12:42pm On Mar 28, 2020 |
Cost of Decking Formwork + Workmanship.. 320,000naira
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 5:40pm On Apr 05, 2020 |
My Team was able to finish the Construction of Formwork in Four days
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 5:44pm On Apr 05, 2020 |
During the construction of Formwork, we were able to drill and install a Borehole system on the property for easy access to Water. I need more than enough water to cast the First Floor Slab
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 5:55pm On Apr 05, 2020 |
With the guide of a detailed Structural Drawing, we started Reinforcement arrangement... I gave my Iron Bending team 3days to conclude reinforcement arrangement and my plumbing and electrical team two days and they were able to deliver. My aim was to cast the First-floor slab before the Lockdown begins on Saturday, April 4 in Abeokuta, and we were able to finish all Formwork, Reinforcement, Plumbing and Electrical work on Thurs, April 2, 2020
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 6:09pm On Apr 05, 2020 |
Friday April 3, 2020 We cast the First Floor Slab without any issue, we started the casting around 9 am and we finished around 6 pm in the evening Material Used 45 tons of 3/4 Granite 5 trailer buckets of Sharp Sand 180 bags of cement 2tons of 16mm reinforcement 4tons of 12mm reinforcement 60 nos of 10mm reinforcement 2 bundles of Binding Wire About 9000litres of water Planks and Bamboo for Formwork Equipment Used 2 mixing Machine @ 15K per day 40 nos of Labour 6 Masons Concrete Vibrator
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 6:12pm On Apr 05, 2020 |
more pics
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 6:15pm On Apr 05, 2020 |
and more more pics
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 7:16am On May 03, 2020 |
Happy Corona Lockdown everyone. I leveraged on the Corona Lockdown to start moulding the Blocks I will need to raise the first Floor. Now we have about 4200 blocks ready for use. All things be in equal We will start raising the first floor walls on Monday.. For the 4200 blocks, I used about 140bag of cement to mould it
|
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hum2020: 7:52am On May 03, 2020 |
@Hargbo what a nice job congratulations pls how much did cost you get borehole done thanks |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:05am On May 03, 2020 |
Hum2020:Survey - 30k Drilling and Installation - 600k They will also manage it for a Year, I have been working with them for a while now and they are very good in what they do. Where is your Location? |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by money121(m): 8:17am On May 03, 2020 |
Baba let handle this Roofing project ooo Help my roofing ministry Edakun |
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by money121(m): 8:18am On May 03, 2020 |
Hargbo: Baba let handle this Roofing project ooo Help my roofing ministry Edakun 2 Likes |
Ripe Plots Of Land At Twin Lake Estate,opp Chevron Hqtrs Lekki For Sale / Buy Only Nigerian Made Cables In Your Best Interest ! / Interior And Exterior Wall Screeding
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 32 |