Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,321 members, 7,819,101 topics. Date: Monday, 06 May 2024 at 11:15 AM

Trade Nigeria Thumps Up To Fg's Support For Dr. Okonjo-iweala's Ambition - Nairaland / General - Nairaland

Nairaland Forum / Nairaland / General / Trade Nigeria Thumps Up To Fg's Support For Dr. Okonjo-iweala's Ambition (117 Views)

NAF: Defence Minister Assures On FG Support For Enhanced Fleets Recapitalisation / We Are Praying For Dr Patrick Ifeanyi Ubah Again, As The Legal Battles Began / Neither Am I Ready To Work With Pres. Muhammad Buhari - Dr Okonjo Iweala (2) (3) (4)

(1) (Reply)

Trade Nigeria Thumps Up To Fg's Support For Dr. Okonjo-iweala's Ambition by asiaafrica: 2:47pm On Jul 17, 2020
Trade Nigeria threw their weight behind the Minister of Industry, Trade and Investment, Richard Adeniyi Adebayo’s decision to inaugurate a campaign team for Dr. Ngozi Okonji-Iweala who is vying for the position of director general of the world trade organization.

The Trade Nigeria president, Hon. Nwabueze Buchi George, applauds and commends the decision of the Minister and the Federal Government at large, for their unbridled desire to support Dr. Okonjo-Iweala quest for the position of Director General of the World Trade Organization.

The Trade Nigeria gaffer further said, this decision of the Federal government will go a long way to create an image of confidence, acceptability and a working synergy between the federal government and Nigerians working in Diaspora.


The Minister of Industry, Trade and Investment, Richard Adeniyi Adebayo, on Wednesday in Abuja, said the setting up of a Campaign team was key in ensuring that the Nigeria's candidate emerge as the Director-General of WTO.

He noted that the decision of President Muhammadu Buhari to nominate Dr. Ngozi Okonjo–Iweala as Nigeria’s candidate for the position of Director- General of WTO was taken in good faith, given the overriding consideration of the need to host Africa’s chance and for the promotion of gender mainstreaming at the world’s top trade post

He was optimistic that the Nigerian candidate would emerge as the next Director General of WTO, based on her capabilities and wealth of experience at the highest level of World Bank as a Development Economist, Diplomat and one of the Africa’s most trusted technocrats.

“An eminently qualified candidate in the person of Dr. Ngozi Okonjo Iweala with proven leadership, bold reformer, skillful negotiator with abilities to broker numerous agreements that would promote fair trade should be selected for the position of the Director General of the WTO; I am confident that Dr. Ngozi Okonjo – Iweala possesses the qualities to lead the most important global multilateral body", he opined.

He therefore charged the team to develop winning strategy for the candidate and also called on stakeholders, media, public, private and trading partners to give necessary support that she requires to emerge as the WTO Director General for the term 2021 – 2025.
“My belief is that the team will intensify its level of dedication over time to ensure that we achieve success”, he stated.

Minister of State, Amb. Mariam Yalwaji Katagum, who is the Team Leader of the Campaign Strategy team assured of the full commitment of members of the team to deliver on its mandate, saying “We must all get to work as a team in the most strategic and professional manner to deliver on this important assignment in line with the Terms of Reference”, she stated.

1 Share

Re: Trade Nigeria Thumps Up To Fg's Support For Dr. Okonjo-iweala's Ambition by Nobody: 2:59pm On Jul 17, 2020
Patriotic, commendable
Re: Trade Nigeria Thumps Up To Fg's Support For Dr. Okonjo-iweala's Ambition by Ayoade333: 3:03pm On Jul 17, 2020
TECHNICALITY IN BUILDING AND INSTALLATION OF COLD ROOM, NEVER GIVE A COLD ROOM PROJECT TO A QUAKE ENGINEERS

1, COLD ROOM equipment compressor unit assembling and installation-we are professional fabricated compressor rack factory over 10 years.
2, COLD ROOM equipment evaporators installation
When selecting the hanging point position, firstly consider the best position for the air circulation, and then consider the direction of the cold storage structure.
The space between the evaporator and the cold room panel should be bigger than the thickness of the evaporator.
All the hangers of the evaporator should be fastened, and the bolts and hanging bolts should be closed with a sealant to prevent air leakage.
When the evaporator is too heavy, using a 4 or 5 angle iron to make the beam. The beam should span to another roof and wall panel to reduce the weight.
3, Refrigeration equipment piping installation technology
The diameter of copper pipe should strictly match with the interface diameter of compressor suction and exhaust valve. When the condenser and compressor are separated more than 3 meters, the pipe diameter should be increased.
Keep the distance between the condenser suction air side and the wall over 400mm, and keep the distance between the outlet and the obstacle more than 3 meters.
Discharge pipe and return pipe should have a certain slope. When the condenser position is higher than the compressor, the discharge pipe should be sloped to the condenser and a liquid ring should be installed at the compressor discharge mouth to prevent the gas cooling to liquid and returning to the mouth after compressor off.
The U-bend should be installed at the exit of the evaporator air return pipe. The air return pipe should be sloped toward the compressor to ensure oil return smoothly.
The expansion valve should be installed as close as possible to the evaporator. The solenoid valve should be installed horizontally. The valve body should be vertical and we should notice the direction of the liquid.
after the completion of the welding of the entire refrigeration system, to do airtight experiments, high-pressure side of nitrogen filling 1.8MP. The low-pressure side is filled with nitrogen 1.2MP. During filling, soapy water is used for leak detection. Carefully check the welding, flange and valve. The pressure is kept for 24 hours.
4, Electrical system installation
The selection of wire must have a safety factor. The temperature of the wire surface must not exceed 4 degrees during the compressor unit operating or evaporator defrosting .
5, Whole refrigeration equipment system commissioning
Check all valves in the refrigeration system if it is in the normal open state or not, especially the exhaust stop valve. Do not close it.
Open the cooling water valve of the condenser. If it is an air-cooled condenser, turn on the fans. Check that if the amount of water and the air flow rate meet the requirements or not.
the electrical control circuit should be tested separately in advance, we should pay attention to whether the power supply voltage is normal before starting.
Whether the oil surface of the compressor crankcase is in the normal position or not, it should generally be maintained at the horizontal centerline of the oil monitor.
Why choose us?
Your Cold Room Expert....KOL-LEK1 NIG LTD
..CONTACT US 08037110658 OR WHATAP US @ 08188892835TECHNICALITY IN BUILDING AND INSTALLATION OF COLD ROOM, NEVER GIVE A COLD ROOM PROJECT TO A QUAKE ENGINEERS

1, COLD ROOM equipment compressor unit assembling and installation-we are professional fabricated compressor rack factory over 10 years.
2, COLD ROOM equipment evaporators installation
When selecting the hanging point position, firstly consider the best position for the air circulation, and then consider the direction of the cold storage structure.
The space between the evaporator and the cold room panel should be bigger than the thickness of the evaporator.
All the hangers of the evaporator should be fastened, and the bolts and hanging bolts should be closed with a sealant to prevent air leakage.
When the evaporator is too heavy, using a 4 or 5 angle iron to make the beam. The beam should span to another roof and wall panel to reduce the weight.
3, Refrigeration equipment piping installation technology
The diameter of copper pipe should strictly match with the interface diameter of compressor suction and exhaust valve. When the condenser and compressor are separated more than 3 meters, the pipe diameter should be increased.
Keep the distance between the condenser suction air side and the wall over 400mm, and keep the distance between the outlet and the obstacle more than 3 meters.
Discharge pipe and return pipe should have a certain slope. When the condenser position is higher than the compressor, the discharge pipe should be sloped to the condenser and a liquid ring should be installed at the compressor discharge mouth to prevent the gas cooling to liquid and returning to the mouth after compressor off.
The U-bend should be installed at the exit of the evaporator air return pipe. The air return pipe should be sloped toward the compressor to ensure oil return smoothly.
The expansion valve should be installed as close as possible to the evaporator. The solenoid valve should be installed horizontally. The valve body should be vertical and we should notice the direction of the liquid.
after the completion of the welding of the entire refrigeration system, to do airtight experiments, high-pressure side of nitrogen filling 1.8MP. The low-pressure side is filled with nitrogen 1.2MP. During filling, soapy water is used for leak detection. Carefully check the welding, flange and valve. The pressure is kept for 24 hours.
4, Electrical system installation
The selection of wire must have a safety factor. The temperature of the wire surface must not exceed 4 degrees during the compressor unit operating or evaporator defrosting .
5, Whole refrigeration equipment system commissioning
Check all valves in the refrigeration system if it is in the normal open state or not, especially the exhaust stop valve. Do not close it.
Open the cooling water valve of the condenser. If it is an air-cooled condenser, turn on the fans. Check that if the amount of water and the air flow rate meet the requirements or not.
the electrical control circuit should be tested separately in advance, we should pay attention to whether the power supply voltage is normal before starting.
Whether the oil surface of the compressor crankcase is in the normal position or not, it should generally be maintained at the horizontal centerline of the oil monitor.
Why choose us?
Your Cold Room Expert....KOL-LEK1 NIG LTD
..CONTACT US 08037110658 OR WHATAP US @ 08188892835
TECHNICALITY IN BUILDING AND INSTALLATION OF COLD ROOM, NEVER GIVE A COLD ROOM PROJECT TO A QUAKE ENGINEERS

1, COLD ROOM equipment compressor unit assembling and installation-we are professional fabricated compressor rack factory over 10 years.
2, COLD ROOM equipment evaporators installation
When selecting the hanging point position, firstly consider the best position for the air circulation, and then consider the direction of the cold storage structure.
The space between the evaporator and the cold room panel should be bigger than the thickness of the evaporator.
All the hangers of the evaporator should be fastened, and the bolts and hanging bolts should be closed with a sealant to prevent air leakage.
When the evaporator is too heavy, using a 4 or 5 angle iron to make the beam. The beam should span to another roof and wall panel to reduce the weight.
3, Refrigeration equipment piping installation technology
The diameter of copper pipe should strictly match with the interface diameter of compressor suction and exhaust valve. When the condenser and compressor are separated more than 3 meters, the pipe diameter should be increased.
Keep the distance between the condenser suction air side and the wall over 400mm, and keep the distance between the outlet and the obstacle more than 3 meters.
Discharge pipe and return pipe should have a certain slope. When the condenser position is higher than the compressor, the discharge pipe should be sloped to the condenser and a liquid ring should be installed at the compressor discharge mouth to prevent the gas cooling to liquid and returning to the mouth after compressor off.
The U-bend should be installed at the exit of the evaporator air return pipe. The air return pipe should be sloped toward the compressor to ensure oil return smoothly.
The expansion valve should be installed as close as possible to the evaporator. The solenoid valve should be installed horizontally. The valve body should be vertical and we should notice the direction of the liquid.
after the completion of the welding of the entire refrigeration system, to do airtight experiments, high-pressure side of nitrogen filling 1.8MP. The low-pressure side is filled with nitrogen 1.2MP. During filling, soapy water is used for leak detection. Carefully check the welding, flange and valve. The pressure is kept for 24 hours.
4, Electrical system installation
The selection of wire must have a safety factor. The temperature of the wire surface must not exceed 4 degrees during the compressor unit operating or evaporator defrosting .
5, Whole refrigeration equipment system commissioning
Check all valves in the refrigeration system if it is in the normal open state or not, especially the exhaust stop valve. Do not close it.
Open the cooling water valve of the condenser. If it is an air-cooled condenser, turn on the fans. Check that if the amount of water and the air flow rate meet the requirements or not.
the electrical control circuit should be tested separately in advance, we should pay attention to whether the power supply voltage is normal before starting.
Whether the oil surface of the compressor crankcase is in the normal position or not, it should generally be maintained at the horizontal centerline of the oil monitor.
Why choose us?
Your Cold Room Expert....KOL-LEK1 NIG LTD
..CONTACT US 08037110658 OR WHATAP US @ 08188892835

(1) (Reply)

Learn A Different To Improve The Performance Of Your Business / Vacancy! Vacancy! Vacancy!!! / Transformational Leadership And Governance

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 50
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.