Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,194,120 members, 7,953,464 topics. Date: Thursday, 19 September 2024 at 04:44 PM

Analysis On The Use Stage Of Well Furnace - Nairaland / General - Nairaland

Nairaland Forum / Nairaland / General / Analysis On The Use Stage Of Well Furnace (133 Views)

Analysis On Damage Factors Of Dry Screw Vacuum Pump / The use of water in spells / Hi Nairalanders, A Fellow Needs A Help On How To Overcome Stage Fright (2) (3) (4)

(1) (Reply)

Analysis On The Use Stage Of Well Furnace by hhm1020: 11:39am On Sep 10, 2020
There are several stages in the operation of a well furnace:
Furnace installation, exhaust and temperature rise:

1, after the well furnace to the temperature insulation 0.5~1h, make the temperature uniform, into the parts, hanging parts should be more than 10mm gap, to ensure that the gas unblocked.

2, the parts must be placed in the effective heating zone of the furnace tank, the upper end should not exceed the exhaust pipe, the lower end should keep a certain distance from the intake pipe, after installing the furnace exhaust time is about 20~60min.

3. The sample should be placed in three different positions: upper, middle and lower.

4, after the installation of the furnace, should immediately send infiltration agent exhaust (ethanol drops), when the temperature of the furnace to the specified temperature, in the outlet of the exhaust gas, such as the flame does not point, should increase the amount of infiltration agent or timely clean up the pipe pile.

5, the new furnace and the new fixture should be pre-nitriding treatment for 3~5h.

Insulation stage:

1. Check whether the ammonia decomposition rate and flow rate are normal at any time. When the furnace temperature meets the requirements and the ammonia decomposition rate is unstable, adjust the flow rate of ammonia gas, increase the flow rate, reduce the decomposition rate, and increase the decomposition rate.

2. In some nitrification tanks, the ammonia decomposition rate increases during long-term use. In order to stabilize the ammonia decomposition rate, 800~960 C 2~4h denitrification treatment is required after the furnace is shut down.

Furnace cooling:

Parts with high fatigue strength requirements shall be oil-cooled and silver-gray parts shall be required on the surface. Under the protection of ammonia or cracking gas, the lifting tank shall be cooled to 200 C before opening the tank to retrieve the workpiece.
Related products:
Vacuum Brazing Machine For PCD Diamond Tools
Other related products:
Liquid Ring Vacuum Pump

Dry screw vacuum pump

(1) (Reply)

Real Madrid And Barcelona At Opposite Ends Of The Scale This Summer / Let's Stop Being Hypocritical. / Jobfan Recruitment Service

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 10
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.