Nairaland Forum / Nairaland / General / Politics / Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work (14385 Views)
David Umahi Inspects The Abuja-Kaduna-Kano Road / FG Sets Dates For Completion Of Lagos-Ibadan, Abuja-Kano Expressway / Abuja-Kano Road: PDP Calls For Review Of ₦2.12 Billion Per Kilometre Cost (2) (3) (4)
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Officialgarri: 5:30am On Nov 21, 2020 |
Agbegbaorogboye:Stop bringing your basic arithmetic into contract process. There are processes that a project has to go through if you are reviewing a contract. This includes the design Another award letter that will pass through ministry justice, procurement and so many others... It's not just about increasing the numbers of workers on site only 2 Likes |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by prigoz(m): 5:56am On Nov 21, 2020 |
When will Buhari and his kitchen cabinet admit any fault than blaming anybody. Am yet to see. If they are tired, they all including empty brain president should resign let the youth take over. Nonsense 1 Like
|
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by mmsen: 6:25am On Nov 21, 2020 |
A road like that should have been three lanes from inception. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Jamesbiodun(m): 6:34am On Nov 21, 2020 |
See excuse o |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Agbegbaorogboye: 6:49am On Nov 21, 2020 |
Officialgarri:Now you're deviating from your initial post. This one you're talking about now is contact award process. It's the same whether it's two lanes or three lanes. You seemed to insinuate the contract completion time will be extended because it's now three lanes. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by lagosrd: 7:05am On Nov 21, 2020 |
iwaeda: They just wake up one day and feels they deserve to alter an approved work. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by femi4: 7:24am On Nov 21, 2020 |
Golan007:May be the third lane is for brt |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Mars16(m): 8:36am On Nov 21, 2020 |
Is alright as far as it will be completed before 2023. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by MRSAWEDOFF: 10:40am On Nov 21, 2020 |
https://www.youtube.com/watch?v=ndE4TJDq9hA Passengers in an Abuja-kaduna bound train lamented after their train broke down on the middle of nowhere for over 2 hours without any help coming from Railway cooperation. The visibly distraught passengers had no option than to disembark from their coaches, wilt some sitting down on the rail tracks as they patiently wait for technicians to come fix the train. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Theyveed(m): 10:49am On Nov 21, 2020 |
Golan007: Read again, Fashola said the road approval for 3lanes was rejected. He was not happy about the length and process it took to get an approval that was eventually rejected. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by McTominay(m): 12:01pm On Nov 21, 2020 |
Fashola that could not oversee the construction of Lagos/Ibadan express way is in charge of construction/ works... SMH, joker's! |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by snoopz: 12:16pm On Nov 21, 2020 |
where were the senators when the 2 lanes idea was made?
in short the money spent on consultancy for the 2lanes don waste be dat not surprised and disappointed wasteful government |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by COMPAQ(m): 1:17pm On Nov 21, 2020 |
So just like that because senate requested and president agreed, a road just changes from 2 lane to 3 Lane overnight! No serious analysis was done with respect to vehicle flow on that road, long term demands etc. That axis already has train planned, which should be the long term focus for passenger and freight, yet the senators selfishly wanted it expanded to enjoy their luxury vehicles. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by COMPAQ(m): 1:19pm On Nov 21, 2020 |
MRSAWEDOFF: Government should remove itself from running these train services otherwise by 2025 mark my words, it would have fallen to pieces. |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by EvenBlogger: 5:06pm On Nov 21, 2020 |
inoki247: |
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Kagarko(m): 6:24pm On Nov 21, 2020 |
Golan007: Fashola Is very s2_pid. He's been economical with the truth. He's only trying to shift the goal Post. Right from the award of the contract it was designed for three Lane brother. I don't blame him I blame PMB for not sacking him for failure to finish the work as an when due. |
Governor Zulum Gifts N500 Million To Departing IDPs In Bakassi Camp (Photos) / 74 Groups Stage Solidarity Walk For Atiku In Katsina / John Ayoh: How I Collected $600,000 Bribe For Emefiele
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 22 |