Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Born2conquer: 8:58am On Sep 15, 2021 |
Bukad: |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Born2conquer: 9:01am On Sep 15, 2021 |
InvestmentMood:9.5M won’t even work for the skeleton |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by kiddkash(m): 9:51am On Sep 15, 2021 |
lanas:after a plan is built, 1 trailer load of cement which is 600 bags @ N2,100,00 is bought, plus trips of sand and gravel, water then hire an excavator to dig. they use your plan to dig the square foundations how you want. day 1. an excavator comes and digs it. it does not take 2 hours, then the laborers will use shovel to correct any mistake. you can start building the or leave it till the next day. day 2. the next day, concrete mixer mixes concrete and pours in barrow which the laborers use to do first base. also the iron castings used to do pillars would be set as well. it takes up to four hours for it to dry. but not very well you don't need it completely dried although some people do. after like six hours max. laborers up to 30 starts laying the blocks. it is then left to dry completely for 1 day day 4. concrete mixer comes back to mix concrete which would be used as German floor, which is the top of foundation. with plumbers working side by side to lay pipes that will connect to septic tank and gutter. it is then left for 2 days to dry. day 7. all the pillars for down stairs are erected day 8. in the morning the laborers starts laying blocks. by the end of the day, the down stairs is built. after that, it is left for 2 days to dry day 11/12. carpenters lays the woods for decking and tarpaulin and welders lays the iron casting for the decking and plumber passes pipes to kitchen and bathroom and toilet. plus electricians passes pipes for electricity. plus bamboo that will hold the decking is placed underneath day 13. concrete mixer mixes mortar and laborers pours it all over the decking plus step/stair case and then left for 3 days to dry. also the septic tank is built plus the decking for the septic tank is done day 17. pillars on the top are built day 18. the woods for decking and bamboo are removed, then laborers lays the block to roofing level. and left for a day and half to dry. day 20. carpenters come and do skeleton for the roofing day 21/22. the laborers plaster the entire house with mortar or cement mixture. day 23. plumbers connect kitchen sink and water pipes and electricians wires the house day 24. the roofing/zinc is done day 25. German floor or concrete floor is done all over the compound alongside the people laying tiles, laying it all over the rooms. day 27/28. fillers are applied to the building and then the painters paint the building (now I hope I was able to explain it stage by stage to you) people who aren't able to do it quick enough, could maybe have other financial obligations elsewhere which is why it is not done or the contractors want to milk you for more money which is why they delay it and tell you stories. also check nairaland where 1 storey building was done in 3 weeks 5 days for pictorial evidence https://www.nairaland.com/4646207/fastest-one-storey-building-construction |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by kiddkash(m): 9:56am On Sep 15, 2021 |
Crossroad1:after a plan is built, 1 trailer load of cement which is 600 bags @ N2,100,00 is bought, plus trips of sand and gravel, water then hire an excavator to dig. they use your plan to dig the square foundations how you want. day 1. an excavator comes and digs it. it does not take 2 hours, then the laborers will use shovel to correct any mistake. you can start building the or leave it till the next day. day 2. the next day, concrete mixer mixes concrete and pours in barrow which the laborers use to do first base. also the iron castings used to do pillars would be set as well. it takes up to four hours for it to dry. but not very well you don't need it completely dried although some people do. after like six hours max. laborers up to 30 starts laying the blocks. it is then left to dry completely for 1 day day 4. concrete mixer comes back to mix concrete which would be used as German floor, which is the top of foundation. with plumbers working side by side to lay pipes that will connect to septic tank and gutter. it is then left for 2 days to dry. day 7. all the pillars for down stairs are erected day 8. in the morning the laborers starts laying blocks. by the end of the day, the down stairs is built. after that, it is left for 2 days to dry day 11/12. carpenters lays the woods for decking and tarpaulin and welders lays the iron casting for the decking and plumber passes pipes to kitchen and bathroom and toilet. plus electricians passes pipes for elctricity. plus bamboo that will hold the decking is placed underneath day 13. concrete mixer mixes mortar and laborers pours it all over the decking plus step/stair case and then left for 3 days to dry. also the septic tank is built plus the decking for the septic tank is done day 17. pillars on the top are built day 18. the woods for decking and bamboo are removed, then laborers lays the block to roofing level. and left for a day and half to dry. day 20. carpenters come and do skeleton for the roofing day 21/22. the laborers plater the entire house with mortar or cement mixture. day 23. plumbers connect kitchen sink and water pipes and electricians wires the house day 24. the roofing/zinc is done day 25. German floor or concrete floor is done all over the compound alongside the people laying tiles, laying it all over the rooms. day 27/28. fillers are applied to the building and then the painters paint the building (now I hope I was able to explain it stage by stage to you) people who are able to do it quick enough, could maybe have other financial obligations elsewhere which is why it is not done or the contractors want to milk you for more money which is why they delay it and tell you stories. https://www.nairaland.com/4646207/fastest-one-storey-building-construction |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Mayorsky07(m): 12:15pm On Sep 16, 2021 |
Why should you quote me bad, just to promote your service. Thunder go soon knack you ElectofGod: |
(1) (2) (3) (4) (5) (6) (Reply)
Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) / Pictures Of My On Going Building. / Simple Guild To The Construction Of Timber Roof Truss In Nigeria
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 30 |