Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,199 members, 7,818,664 topics. Date: Sunday, 05 May 2024 at 09:15 PM

Sanwo-olu Administration Achievement (2019-date) In Traffic Management & Transpo - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Sanwo-olu Administration Achievement (2019-date) In Traffic Management & Transpo (292 Views)

Projects Completed By Sanwo Olu's Administration in Lagos State / Mid Term Report : Utomi, Others Rate Sanwo-Olu's Administration High / Nigerians Should Make 2019 Date Of Freedom, Says Muslim Group (2) (3) (4)

(1) (Reply) (Go Down)

Sanwo-olu Administration Achievement (2019-date) In Traffic Management & Transpo by Horlalek(m): 7:26am On Nov 21, 2021
Below are Lagos State Governor Sanwo-Olu Administration’s achievement (2019-date) in Traffic Management & Transportation.

Sanwo-Olu Administration Achievement (2019-Date) In Traffic Management & Transportation - autojosh
Since he came into power in May 29, 2019, the Lagos State Governor, Mr. Babajide Olusola Sanwo-Olu (BOS), has fulfilled some of the promises he made during election campaign.

In addition to several ongoing projects across the State, the administration of Sanwo-Olu has also been credited for completing several projects worth billions of dollars that he inherited from his predecessor, Akinwumi Ambode.

Sanwo-Olu Administration Achievement (2019-Date) In Traffic Management & Transportation - autojosh


Below are the achievements of BOS Administration achievements (2019-date) in Traffic Management & Transportation.

• Completed and commissioned Ikoyi network of roads.

• Completed and commissioned Oniru network of roads, Victoria Island.

• Completed and commissioned Ijede Road Phase 1 in Ikorodu.

• Completed and commissioned 1.4 km dual carriage Pen- Cinema Bridge, Agege.

• Completed and commissioned Tedi-Muwo and Link Bridge, Lagos-Ogun boundary roads in Alimosho and Agbado-Oke–Odo and access roads.

• Completed and commissioned 31 network of roads in Ojokoro Local Council Development Area (LCDA).

• Completed and commissioned the 13.68 kilometers Oshodi-Abule-Egba BRT corridor.

• Completed and commissioned Mafoluku Bus Terminal.

• Completed and commissioned Yaba Bus Terminal.

Sanwo-Olu Administration Achievement (2019-Date) In Traffic Management & Transportation - autojosh
• Reconfigured 6 Junction/Roundabouts at Allen, Ikotun, Maryland, Lekki and Ajah (under Traffic Management Intervention Plan -TMIP).



• Launched 500 units of First and Last Mile (FLM) buses.

• Injected 100 high-medium capacity busses for standard routes

• Lagos Bus Service Limited (LBSL) celebrated the 10 million passenger ridership as an unprecedented landmark achievement.

• Created 700 jobs for Lagosians via LBSL operations.

• Did 110 palliatives and 361 sectional rehabilitations on roads across the state.

• Rehabilitated over 832 inner roads via the Lagos State Public Works Corporation (LSPWC).

• Reconfigured 6 Junction/Roundabouts under Traffic Management Intervention Plan (TMIP).

Sanwo-Olu Administration Achievement (2019-Date) In Traffic Management & Transportation - autojosh
• Painted a total number of 30 roads, approximately, 428.97 Kerbs and Medians.

• Marked 64 roads, approximately 100.66kms through which over 3,000 youths were engaged.

• Inaugurated, kitted and deployed 1,017 new LASTMA officers to various locations as Traffic Managers.

• Commenced Cashless Toll Payment at the Lekki-Ikoyi Link Bridge in order to reduce traffic gridlock along the axis.

• Launched Articulated and Allied Vehicle Number Plates [AVNP] for safe motoring in the metropolis.

• Added 65 high capacity buses to the existing fleet to ease commuting.


• Commissioned eight new ferries, which have ferried over 305,000 passengers since the commencement of commercial operation in February, 2020.

• Launched a mobile application designed to facilitate easy access to water transportation services in the State.

• Kicked off the Clean-up Campaign on waterways.

• Handed 15 brand new vehicles and 26 motorbikes to the Traffic Enforcement Team.

• Recommenced construction work on the strategic Lagos/Badagry Expressway; and first phase of the road from Agboju to Trade Fair already completed.

Governor Sanwo-Olu Commissions Onikan 5-floor Multi-level Car Park - autojosh
Multi-level parking space
• Commenced reconstruction and upgrading of strategic roads such as the 6.05 kilometer Phase 1 Road from Itamaga to Ewu Elepe town, the 7.8 kilometers Owutu-Agric-Ishawo Road Phase 1 and Bola Tinubu-Igbogbo-Imota Road.


• Short-listed 8 contractors for the construction of the 4th Mainland Bridge.

• Commenced the construction of 19.39-kilometre road network in Ijegun-Ijagemo and Ijedodo in Ojo Local Government.

• Massive repair on the Ojota stretch of Ikorodu Road and Motorways – Kudirat Abiola Way, Apongbon Highway and Lekki-Epe Expressway from Abraham Adesanya to Eleko Junction among others.

• Reconstruction and upgrading of Igbogbo-Bola Ahmed Tinubu-Igbe Road, Ikorodu – ongoing

• Commenced the rehabilitation of the 660m length loop Road Oregun and construction of two 30m long Bridges across the Odo-Alaro canal.

• Embarked on the construction of the Agric-Access Road, Phase II, Igando, and the Deep Sea Port road and the Lekki-Ijebu-Ode-Ore Expressway.

Sanwo-Olu Administration Achievement (2019-Date) In Traffic Management & Transportation - autojosh
• The rehabilitation of Oba Sekumade Road is on-going, while Ipakodo, Ikorodu; Ijegun-Egbe Road and Ishuti Road, Igando has been completed.

• Completed the Samuel Ekundayo/Toga road in Badagry LGA, Ishefun-Camp Davies-Ijon road network in Alimosho LGA, boundary roads with bridge (Phase II) to complement the network of twenty-one roads and two bridges in the axis.

• Completed the Aradagun-Imeke-Iworo-Ajido-Epeme road(phase II) to complement the earlier concluded phase 1.

• Commenced the Multi-level facility (car park) Onikan designed to accommodate 384 cars is at 83% completion, and another multi-Agency office complex with a capacity for over 700 vehicles.

• Embarked on the rehabilitation and upgrading of the 6km phase I of 11 km long Ijede road.

Sanwo-Olu Administration Achievement (2019-Date) In Traffic Management & Transportation - autojosh
• Embarked on the construction of Lekki Regional Road, which include the Lekki free trade zone, Lekki Ports, Dangote Petrochemical Plant, Lekki Airports etc

• Embarked on 90 palliatives and 261 sectional rehabilitations in Agege; Ajeromi Ifelodun; Alimosho; Amuwo-Odofin; Apapa; Badagry; Epe; Eti-Osa; Ifako-Ijaiye; Ikeja; Ikorodu; Kosofe; Lagos Island; Lagos Mainland; Mushin; Oshodi-Isolo; Shomolu and Surulere.

• Restricted activities of motorcycles & tricycles in six LGAs & nine LCDAs to ensure safety of lives.

• Completed and commissioned the new Vehicle Inspection Services headquarters; and deployed USSD Service (*554*381#) for verification of road worthiness certificate.

Lagos Governor Sanwo-Olu Commissions Four Roads, Totaling 6.62Km, To Ease Lagos-Ogun Traffic -

Copied!
autojosh

1 Like

Re: Sanwo-olu Administration Achievement (2019-date) In Traffic Management & Transpo by Horlalek(m): 12:23pm On Nov 21, 2021
The only working Governor in Nigeria currently
Re: Sanwo-olu Administration Achievement (2019-date) In Traffic Management & Transpo by Abrahamobic(m): 1:50am On Dec 31, 2021
RIP cry

(1) (Reply)

FOUR FRAUDS THAT ARE FATAL FOR THE 1999 CONSTITUTION..... ~ CHINWEIZU / Why I Blame Buhari For Ipob / When’s Sharia Law Being Abondoned In The North

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 17
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.