Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 5:01pm On Jun 10, 2022 |
So much rain in this region of the country is very challenging. However, we are trying as much as we can to push through. Just before the close of work today rain started falling after terrible 4hrs sun.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 8:58pm On Jun 10, 2022 |
We will continue tomorrow with other works on site. |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 11:53am On Jun 11, 2022 |
Concrete works now Lintel and Colums
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 4:11pm On Jun 11, 2022 |
Working at this time in the east is quite challenging. But we are doing our best as always
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 4:12pm On Jun 11, 2022 |
Without wasting much time. We have started preparing for decking. Starting with the decking rings/stirrups
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 3:22am On Jun 12, 2022 |
Good morning Viewers. Keep following up with us for more update. We will continue with our works on colum and Lintel today. Rain was much yesterday. We had to stop concrete works. |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 8:08am On Jun 12, 2022 |
Result of the area we poured concrete before the rain.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 2:09pm On Jun 12, 2022 |
More work updates from here Results and going forward of the concrete works we did yesterday. Leveling ongoing simultaneously. We are doing 3 coaches as against 2 coaches initially planned. Client wants more headroom for the decking. For finishing concepts on POP designs.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 3:45am On Jun 13, 2022 |
Picture update. Earlier yesterday. The Duplex has an open Kitchen design. Picture 1 and 2 - Main Sitting room Picture 3 and 4 - Showing the Flat Area
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 1:30pm On Jun 13, 2022 |
So far on the ground floor we have used over 3700 Blocks of 9 inches and still counting. Our leveling is 3 coaches of blocks after lintel.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 4:36pm On Jun 13, 2022 |
Leveling works ongoing still
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 9:44pm On Jun 13, 2022 |
Consistency is Key. Regardless. Thank you for those watching and following up silently too. We see and notice your presence on the page views. We will definitely continue to update the thread as work goes on here. 1 Like |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 3:33am On Jun 14, 2022 |
Keep following |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by BiigTee: 6:48pm On Jun 14, 2022 |
Welldone.. Diligently following 1 Like |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 4:56am On Jun 15, 2022 |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 5:00am On Jun 15, 2022 |
We have successfully completed the application holding leveling. Total blocks purchased was 4200 pieces in all. Decking stage is next and we have equally made some procurements for a start. Bamboo here are sold at 750 but they are full length as compared to Lagos own. Lagos is selling for 650 the last I bought 3 months ago but this one here is x2 Lagos size. So Lagos building material market is quite expensive when it comes to wood and a few other things down here. There are only but a few building materials in Lagos that I will say are better of than here but they are barely significant when it comes to cost. Though some practice in the east here are different too than Lagos. Like when you buy stuffs here you pay for loading and Offloading yourself. You pay for transport yourself. Just the few procurements done yesterday costed 40K transport and 20K loading and Offloading.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 5:04am On Jun 15, 2022 |
Decking materials. We have got already 350 pieces of planks. 300 pieces of Bamboo sticks. 250 pieces of 2x3x12 wood. 4 Bags of nails. 16mm 12mm 10mm 3 roles of binding wires. Set for the decking works now.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 5:06am On Jun 15, 2022 |
In preparation for the decking works Some 3D models have Been established to show a few adjustments on the design. The entrance area to the flat have been worked upon. See the updates on the design and watch out for the construction ASAP
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 6:20am On Jun 15, 2022 |
Would be sharing the 3D Model of the Decking Slab here today!!! Stay tuned.it's becoming interesting the more. Designing and Building In real time 3D and Life Construction simultaneously. Every element is represented. |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 9:58am On Jun 15, 2022 |
Good morning Viewers. As promised. This is the next stage of works 3D Model of the proposed DECKING construction
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 11:57am On Jun 16, 2022 |
Decking works update
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 3:08pm On Jun 16, 2022 |
More perspective view of the Building One of our biggest challenge so far in this project is steady rainfall. Today, it's been raining since morning till now.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 9:02pm On Jun 16, 2022 |
Good evening Viewers |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 7:53pm On Jun 17, 2022 |
Iron works on beams ongoing Its basically beam formation we are doing at the moment
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 2:47am On Jun 18, 2022 |
Good morning |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 6:34am On Jun 18, 2022 |
Still on the Beams. Duplex area now. Lots of Beam formation The bedrock that carries the decking slab.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 2:45pm On Jun 18, 2022 |
Keep following. It's getting more interesting. |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 8:25pm On Jun 18, 2022 |
Final irons arrived Today. 380 Pieces of 12mm Lengths. 30 Lengths of 16mm supplied today 35 Lengths of 10mm more added though from estimated too. Bamboo sticks. 1x12x12 planks 2x3x12 woods 1 Bag of nail.
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 5:13am On Jun 19, 2022 |
We continue today. We will be updating our work progress. Stay tuned |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 6:14am On Jun 19, 2022 |
We are going to be forming the cantilivers on the building as well as forming other components of the building elements that will sustain the decking works. Electrical works and plumbing works are gonna start ASAP. |
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 1:50pm On Jun 19, 2022 |
Update on the floor Matt
|
Re: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(m): 6:00pm On Jun 19, 2022 |
We are seriously pushing the decking works despite the rain fall here. View of the flat area
|
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (15) (Reply)
Terrace Building Design / Properties For Sale / Elegushi Kingdom Proposes $300m Imperial City
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28 |