Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,812 members, 7,827,986 topics. Date: Tuesday, 14 May 2024 at 08:44 PM

Documenting The Construction Of A Mini Event Centre - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Documenting The Construction Of A Mini Event Centre (3503 Views)

Can ₦2M Finish The Construction Of A 2-Bedroom Flat? / The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process / Roofing A Mini Event Hall Without Pillar (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:55am On Jul 03, 2022
Happy Sunday to everyone.

We are doing the column formworks, casting of the columns and today we are kicking off earth filling of the backstage and hall areas.
While tomorrow, we set out other parts of the building which we haven't done due to want of space.

Please keep following.

1 Like

Re: Documenting The Construction Of A Mini Event Centre by UC92: 7:05am On Jul 03, 2022
We have some isolated pad foundation at the center of the mini halls.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:54pm On Jul 11, 2022
It has been raining since these few days.
Earth filling ongoing.
We may not be buying laterite as the rubbles and earth on site may be enough.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 3:12pm On Jul 14, 2022
Good day good nairalanders.

We have successfully completed the earth filling and placement of rubbles as hardcore for this structure.
Iron fitting for beams to connect the columns together and placement BRC wire mesh ongoing.
Materials are being delivered to site for casting of the oversite concrete.

We budgeted
200bags of cement.
90 tons of granite.
80 tons of sharp sand.
14 rolls of 4mm BRC wire mesh.
85 lengths of 16mm for beams.
10mm available from the Left over purchased before.

All earth filling material was from the demolished building and some part of the excavated earth.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 3:29pm On Jul 14, 2022
We will be working on the approach risers and risers to the individual halls soon.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:31pm On Jul 14, 2022
Materials arriving site.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 2:09pm On Jul 17, 2022
We are concreting already.
Procured nig pipes for wastes and PPR for supply.
Re: Documenting The Construction Of A Mini Event Centre by UC92: 2:21pm On Jul 17, 2022
Concreting.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 2:32pm On Jul 17, 2022
Installation of waste pipes going on concurrently.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 2:36pm On Jul 17, 2022
Procured nig pipes and PPR.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 3:49pm On Jul 19, 2022
Oversite concrete done.
Formation of ground floor walls ongoing.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 4:00pm On Jul 19, 2022
More blocks will be delivered to this site tomorrow and erection of the walls will continue.
Please stay tuned.

1 Like

Re: Documenting The Construction Of A Mini Event Centre by UC92: 1:20pm On Jul 22, 2022
We are making progress on the erection of our ground floor walls.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 1:44pm On Jul 22, 2022
More pictures.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 8:07am On Jul 27, 2022
Good morning great people.
The weather has not been so favorable but we are pushing it.
Column reinforcement are being installed and carpenters are preparing their formworks.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 8:12pm On Jul 30, 2022
Lintel works ongoing.
We have started procurement of materials for the suspended floor slab.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:48pm On Aug 12, 2022
Updates.

Formation of the beam formworks for the suspended floor slab ongoing.

Our isolated columns are going to be precast. The moldings are ongoing too.

Fins are growing up.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 7:00pm On Aug 12, 2022
The approach is gradually taking shape.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 4:29pm On Aug 17, 2022
We are making progress.

Slab formworks on going.

Bending of stirrups.

Installation of precast columns.

Re: Documenting The Construction Of A Mini Event Centre by joycluv: 6:24am On Aug 27, 2022
[quote author=UC92 post=114117703]We commenced casting of the foundation footing and blinding for column base today.[/qu

This your foundation looks very neat ooo!
Please what's the depth and the thickness of the blinding?
Re: Documenting The Construction Of A Mini Event Centre by UC92: 9:55pm On Aug 28, 2022
[quote author=joycluv post=116098279][/quote]
We did 150mm (6inches) concrete thickness for the footings and 450mm (18inches) for the column base as stipulated in the design.

Thanks sir/ma for following our thread.
Re: Documenting The Construction Of A Mini Event Centre by UC92: 10:05pm On Aug 28, 2022
Happy Sunday Nairalanders, we are still pushing on with our project, keep following for updates.

Slab formwork 90percent done, ready to receive nylon sheets. This is to help prevent loss of concrete nutrients.

Iron fitters are doing their work already, we are using TMT rods.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 10:34pm On Aug 28, 2022
More pictures.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 7:14pm On Sep 01, 2022
#Progress.
We quickly did casting of our first staircase for easy access to the first floor, this would eliminate waste of doing a wooden flight.

Iron works still ongoing.
Laying of nylon sheets on formworks.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 7:24pm On Sep 01, 2022
More pictures

Re: Documenting The Construction Of A Mini Event Centre by UC92: 9:09pm On Sep 09, 2022
We are making adequate preparation to carry out concreting of the suspended floor.
Formwork is ready.
Iron fittings done.
Plumbing piping ready.
Electrical piping yet to finish.

We have two R.C stairs on this project. One serving the backstage and the other serving the reception. Both have been completely cast for easy access of labourers for casting. No wooden flight hence no waste.

We will have to extend all the column rebars before we cast.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 9:18pm On Sep 09, 2022
Let's see the exterior.

Granite is ready.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 8:46pm On Sep 21, 2022
Good evening sir/ma.

We are done casting the suspended floor slab and have commenced the formation and erection of the walls.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:38am On Sep 22, 2022
More picture update.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:48am On Sep 22, 2022
I will be doing a thread on a semi detached block of flats I am currently working on at Atali, Obio-akpor L.G.A Rivers state. Please follow up.
Link will be dropped soon.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:16pm On Sep 28, 2022
Block work is almost at the lintel course here.
Iron fitter has resumed work for lintel.

We have invited some steel roof specialist to tender for the roof fabrication. Will keep you all updated.

Thanks for following Sir/ma

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:29pm On Sep 28, 2022
Structural 3D showing the steel truss system.

1 Like

(1) (2) (3) (Reply)

*product Of The Day* ===☆☆☆===☆☆☆=== *summit Homes, Sangotedo* *☆☆===☆☆☆===☆☆☆= / Get Your Stone Coated -metal Roofing Tiles Here In (abuja) / I Want To Add A Second Storey To My Existing House

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.