Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,788 members, 7,817,269 topics. Date: Saturday, 04 May 2024 at 09:08 AM

Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible - Travel (2) - Nairaland

Nairaland Forum / Nairaland / General / Travel / Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible (21421 Views)

Port Harcourt-Aba-Maiduguri Eastern Railway Corridor Construction Speeds Up / Eastern Rail Operations: NRC Loses N1.04bn In 5yrs / Lagos-Ibadan Railway: 2018 No Longer Feasible, Fixes New Date For Completion (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Eriokanmi: 6:02pm On Dec 21, 2022
...no more feasible but the one from Katsina to Maradi in Niger Republic is still ongoing abi? Any southerners reading this message and still wishing to vote them is in need of urgent brain check

4 Likes 1 Share

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by MrCGPA(m): 6:03pm On Dec 21, 2022
If you are a Southerner and still Planning to Vote any Northern Presidential Contenders then you must Check your Brain. Railway Could be made to Niger Republic but South East and South South isn't possible. The Place the Nigerian Crude Oil originated from doesn't need development through rail.

2 Likes

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by pacesetting: 6:04pm On Dec 21, 2022
But the rail to Niger republic was feasible. Imagine the nonsense.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by AbBlackLaw: 6:05pm On Dec 21, 2022
Just imagine the joke, our brother Amaechi after pursuing your presidential election bid by delivering rail projects for other regions, your own state and region is the only place recieving excuses. What a pity

1 Like

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by tishbite42: 6:05pm On Dec 21, 2022
BOLATINUBU01:
Is not necessary


God bless PMB
God bless ASIWAJU BOLA AHMED TINUBU
Lol
He'll beg for their votes
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by shedy03(m): 6:06pm On Dec 21, 2022
BOLATINUBU01:
Is not necessary

Really? Remember, Maiduguri is the state of shetima
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by deji17: 6:06pm On Dec 21, 2022
IPOB success.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by nedu666: 6:11pm On Dec 21, 2022
Iimagine using fake vandalism as an excuse when the actual cause is an over inflated $12 billion narrow gauge project.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by ebuclassic18(m): 6:11pm On Dec 21, 2022
Blaze14k:


Obviously they used and dumped him
He knows what his doing, they didn't dump him rather his part of the plan
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by emmykk(m): 6:12pm On Dec 21, 2022
There is no problem with that should Atiku or Obi wins they will do the Maiduguri -porthacourt axis of the railway.

Mewhile they are treating the NE ,SE and SS with disrespect.

When Good luck was there he was busy developing North, Ameachi also develop north so they we begin to see their inefficiency in the scheme of things
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by boldtruthalways: 6:12pm On Dec 21, 2022
Shame on Amaechi.....he's been used and dumped.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Espelbengz(m): 6:12pm On Dec 21, 2022
You don't mean it Mr contractor! Lol


DaddyFreeze2020:
The Japaneese, Germans and Chineese can construct Railway lines from places like Maiduguri to Lagos in less than 12 months.

Governance in Nigeria is rather filled with lack of determination by politicians to undertake and execute massive projects.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by ebuclassic18(m): 6:13pm On Dec 21, 2022
Then why did they dismantled the old rail at least it was manageable this guys are wicked
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Espelbengz(m): 6:13pm On Dec 21, 2022
How? Let me know why shame is on him..

boldtruthalways:
Shame on Amaechi.....he's been used and dumped.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by ShinnBet: 6:13pm On Dec 21, 2022
Sambo had in September while inspecting the work done so far, disclosed that the contractor in charge of the project, China Civil Engineering and Construction Company (CCEC) had often complained of incessant attacks on its workers around the Abia State axis of the rail corridor.

Why is this useless govt always constructing infrastructure in foreign soil?

First Niger Republic , now Biafra .
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by wizelink(m): 6:14pm On Dec 21, 2022
Unbelievable!!!. How come Boko boys, iswap guys, and others wey dey kpai people anyhow for north no stop the rail line that leads to Niger Republic?

Abel FG tell us another story

2 Likes

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Nonexisting1: 6:15pm On Dec 21, 2022
Joke is on Amaechi and all urchins of Southern origin except Southwest.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by lexy2014: 6:17pm On Dec 21, 2022
BOLATINUBU01:
Is not necessary


God bless PMB
God bless ASIWAJU BOLA AHMED TINUBU

Why is the rail line not necessary?
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by lexy2014: 6:19pm On Dec 21, 2022
AbBlackLaw:
Just imagine the joke, our brother Amaechi after pursuing your presidential election bid by delivering rail projects for other regions, your own state and region is the only place recieving excuses. What a pity

Would amaechi have been able to execute any project with the presidents approval? I really don't understand how some of you think
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Ofunaofu: 6:23pm On Dec 21, 2022
grin
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by IGBOSON1: 6:25pm On Dec 21, 2022
ecolime:

He's been retired already. When last have you heard from him since the APC primaries?

Don't wine with the devil dem no go hear. APC will use and dump you.

Where are the likes of Rochas, Umayi, Akpabio, etc. today?

A gallery of daft and gullible southern politicians who are yet to know the slippery and power-hungry nature of the people they’re dealing with! They actually thought they were dealing with fair-minded people! Right from the time of Zik, Awo, GEJ and the aforementioned lot, southern politicians have always been taken for mugs by these people!

1 Like 1 Share

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by delpee(f): 6:29pm On Dec 21, 2022
dynicks:
Amaechi right now in deep thoughts thinking of what to say and how to present himself when he finally wants to retire back to his hometown...

Well, he has no control over vandalism and issues of insecurity. Those are core reasons why the project is being abandoned. Who wants to give a loan for a project with a high chance of failure? This isn't Amaechis fault really. The people should caution themselves and show commitment.

2 Likes

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Yankee101: 6:29pm On Dec 21, 2022
But niger republic is?

1 Like

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by StreetFight: 6:29pm On Dec 21, 2022
Yes nah
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Buksaylor: 6:30pm On Dec 21, 2022
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by ScamHunter: 6:31pm On Dec 21, 2022
Millimann:
They have used and dumped Amaechi.

At least southeast got the second Niger bridge

SE got nothing. That bridge had mostly been paid for by Jonathan's administration.
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by PHIPEX(m): 6:31pm On Dec 21, 2022
Big shame on Amechi, after all the sycophancy he still could do anything for his Rivers and the East but was defending railway to Niger Rep.

Umahi and Soludo have taken over from him, when they are done using them they will trash them as usual. Okorocha who was insulting everyone in the East few years ago calling us "iberiberism"has gone mute after they showed him another colour.

Thank God they didn't even build it, why build standard guage elsewhere but want to build narrow guage for the East??

2 Likes

Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Nolevel666: 6:32pm On Dec 21, 2022
Railway wey dem go loose sell give aboki piece by piece

Trust Nigerians
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by Nackzy: 6:33pm On Dec 21, 2022
After they've spent 430 million dollars on Consultancy
Re: Sambo: Port Harcourt-Maiduguri Eastern Rail Line No Longer Feasible by VEHINTOLAR: 6:34pm On Dec 21, 2022
Ipob billionaires from ALAMbra state will build a replica of the one in Japan for them ! Chai, Igbo see ya lives; losing out right,left and centre ! All your smartness no pass 2×2 container business,mumu people ! This is what you get when you can't reason beyond emotions !

1 Like

(1) (2) (3) (4) (5) (Reply)

New Visa Policy For Nigerians Traveling To Indonesia, NDLEA To Be Involved / BDC Outlets At International Airports In Nigeria Run Out Of Dollars / FG To Introduce Solar-Powered Keke And Motorcycles In 2019

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.