Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 2:44pm On Nov 26, 2023
More site updates from here.
Still at the concrete works.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 11:23pm On Nov 26, 2023
Keep following
Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 6:02pm On Nov 28, 2023
More site update on lintel and colum works.
Though leveling is already ongoing from the back simultaneously.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 6:02pm On Nov 28, 2023
Leveling update.

Re: 5 Bedroom Duplex - Ibadan Project by MAGNIS55: 12:32am On Nov 29, 2023
I sincerely appreciate the great job you are doing, Engr.

Please, I would like to find out how many tons of gravel, the number of bags of cement and trips of sand used for the decking and the amount each, if possible please.

Thank you. I am having an interesting time going through the work from the beginning to this time.

I am preparing to embark on a similar project in Uyo soon, and it's important I have a fair idea of what it entails.

Remain blessed.

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Adedward(m): 12:49am On Nov 29, 2023
Dennis3D:
Leveling update.
hmmm, after roofing carcass u will still have some days left out of the 26 days with this level, well done,

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 12:29pm On Nov 29, 2023
MAGNIS55:
I sincerely appreciate the great job you are doing, Engr.

Please, I would like to find out how many tons of gravel, the number of bags of cement and trips of sand used for the decking and the amount each, if possible please.

Thank you. I am having an interesting time going through the work from the beginning to this time.

I am preparing to embark on a similar project in Uyo soon, and it's important I have a fair idea of what it entails.

Remain blessed.

Thanks for your comment.

As for your question. Well the price of these items varies from location to location and so it will not be advisable to use Ibadan price to compare with Uyo.

However there are peculiar questions that I can help you ask and answer. Things like, what's the type of granite we use and they're sizes. I can give you that depending on the use you want to use it for when you begin your project.

As for sand we have various types which are for various uses too on site.
- Sharp sand (Mainly for construction)
- Filling sand
- Laterite/Red sand
- Plaster sand

They are used for various reasons too on site.

The tonnage of sand and granite comes in the following, 5, 10, 15, 20 and 30 Tons respectively.

Again, your requirement determines the tonnage to go for.

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 12:31pm On Nov 29, 2023
Adedward:
hmmm, after roofing carcass u will still have some days left out of the 26 days with this level, well done,

Yes that's our target

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 12:34pm On Nov 29, 2023
We have started our roof gutter construction.

We ain't doing our regular parapet for this project because we are using a hidden roof design which is not flat hidden roof that us common.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 7:22pm On Nov 29, 2023
We have had a productive day today and we have made really good progress
'What we have to do here is tasking, but we are up for it".

Stay tuned with us as we share work updates soonest.
Re: 5 Bedroom Duplex - Ibadan Project by MAGNIS55: 8:49pm On Nov 29, 2023
Many thanks, Engr for the insight. I appreciate you

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 1:53pm On Nov 30, 2023
MAGNIS55:
Many thanks, Engr for the insight. I appreciate you

Thanks very much.
Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 1:55pm On Nov 30, 2023
More work updates from here.
We are constructing the roof gutter form works and iron works.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 8:42pm On Dec 02, 2023
We are preparing to do concrete works tomorrow on the roof gutter.

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 4:32am On Dec 03, 2023
Keep following up with us.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 5:26pm On Dec 04, 2023
Roof Gutter concrete works.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 5:28pm On Dec 04, 2023
Roof Gutter concrete works now completed.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 5:10am On Dec 06, 2023
Building is taking final shape now

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 5:11am On Dec 06, 2023
Plumbing works ongoing simulationeously.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 4:35pm On Dec 07, 2023
Final roof coping works being done now.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 7:01pm On Dec 07, 2023
We are commencing roofing works tomorrow

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Adedward(m): 7:24pm On Dec 07, 2023
Dennis3D:
We are commencing roofing works tomorrow
well done boss,

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 10:41am On Dec 08, 2023
Good morning Followers.
Thank you for following us so far.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 1:41pm On Dec 10, 2023
Roofing works.

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 3:16am On Dec 11, 2023
Gradually rounding up the roof carcass.

Re: 5 Bedroom Duplex - Ibadan Project by Beframia: 12:44pm On Dec 11, 2023
Dennis3D:
Gradually rounding up the roof carcass.

Were these woods treated in any way?

1 Like

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 10:17am On Dec 13, 2023
Beframia:


Were these woods treated in any way?

Oh Yes they were...

Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 10:19am On Dec 13, 2023
We have now officially completed the roof carcass.

Re: 5 Bedroom Duplex - Ibadan Project by Beframia: 7:52pm On Dec 13, 2023
Dennis3D:


Oh Yes they were...

Great! Didn't see the usual black stains of used engine oil. What chemical was used for the treatment?
Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 8:00pm On Dec 14, 2023
.
Re: 5 Bedroom Duplex - Ibadan Project by Dennis3D(m): 8:01pm On Dec 14, 2023
Beframia:


Great! Didn't see the usual black stains of used engine oil. What chemical was used for the treatment?

See images above.
You will see the wood treated there.

(1) (2) (3) (4) (5) (6) (Reply)

Looking To Own Land By The Beachside For Business Purposes?call +2349030188831 / SOLD! Foreign HDF Doors, Not Fixed, Location Asaba. Call 09058818181 / With N5m Initial Deposit, Own This Luxury 4 Bedroom Duplex With BQ

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 33
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.