Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,704 members, 7,816,884 topics. Date: Friday, 03 May 2024 at 07:23 PM

Construction Process Of A Wing Duplex+flat At Ajah - Properties (8) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Process Of A Wing Duplex+flat At Ajah (101170 Views)

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI / . (2) (3) (4)

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (40) (Reply) (Go Down)

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 11:05pm On Sep 06, 2012
DAY 111.....U mean 13m is on high side. Anyway I can't take 13m frm u to deliver this because i know what i face in d process

Re: Construction Process Of A Wing Duplex+flat At Ajah by Humanbeans(m): 8:53am On Sep 07, 2012
Segcy, I'm planning a 4 bedroom duplex. But I will let you know when it's time
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:30pm On Sep 07, 2012
DAY 112

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:33pm On Sep 08, 2012
DAY 113
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 9:07pm On Sep 10, 2012
DAY 114

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 9:41pm On Sep 11, 2012
DAY 115

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 11:19pm On Sep 12, 2012
DAY 116

Re: Construction Process Of A Wing Duplex+flat At Ajah by DesBuild: 7:35pm On Sep 13, 2012
DAY 117

Re: Construction Process Of A Wing Duplex+flat At Ajah by DesBuild: 9:00pm On Sep 14, 2012
For enquiry contact us @;Suite A74, Ikota Shopping Complex, VGC, Lekki, lagos(08023807960, 07042144750, segetony@gmail.com)
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 9:25pm On Sep 15, 2012
DAY 118

1 Share

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 9:30pm On Sep 17, 2012
DAY 11.. AC pipe work
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:29pm On Sep 18, 2012
DAY 120..AC /Gas wire

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 10:12pm On Sep 19, 2012
About to commence plasteringh
Re: Construction Process Of A Wing Duplex+flat At Ajah by ahf(m): 6:15pm On Sep 20, 2012
Your concept of including the AC pipework ahead seems a good one, to avoid any future breaking of holes.

Is this been done for the duplex and the flats?

Are the flats for future renting?

What are the disadvantages of putting the pipework internally? if any?

Another design just crossed my mind, embedding normal plastic trunking in the wall, prior to plastering.
That way, hoses can be passed inside the trunking and covered. this can easily be opened if service is required.
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:22pm On Sep 20, 2012
yes. it was done in both Duplex and flat and flat if for rent(it will be available for rent by Jan. if interested
Re: Construction Process Of A Wing Duplex+flat At Ajah by Aventures(m): 10:06pm On Sep 20, 2012
Another design just crossed my mind, embedding normal plastic trunking in the wall, prior to plastering.
That way, hoses can be passed inside the trunking and covered. this can easily be opened if service is required.[/quote]
Embedding PVC Pipe in the wall for AC conduits like electrical cable wont work because there are abt 4 types(electrical cable. copper hose, water hose,hammerflex )of materials to be trunk togetther and most of them are not flexible, moreover this item are always taped together.. So it is best done the way we saw it done on this tread. Thanks and i hope you wont mind that i poke nose LOL.
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:45am On Sep 22, 2012
Correct!
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 10:16pm On Sep 22, 2012
Visit us @ Suite A74, Ikota Shopping Complex, VGC, Lekki for enquiry...Better still, mail us @ segetony@gmail.com
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:35pm On Sep 24, 2012
DAY 121....Plastering work

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 6:02pm On Sep 25, 2012
DAY 122..

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:24pm On Sep 26, 2012
DAY 123

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:29am On Sep 27, 2012
d plastering work starting frm d decking
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:54pm On Sep 27, 2012
DAY 124....Plastering on going
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:49pm On Sep 28, 2012
DAY 125

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:39am On Sep 29, 2012
DAY 126..Plastering work on-going...pics later in d day
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 9:46pm On Sep 29, 2012
DAY 127...

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:39am On Oct 01, 2012
To my Fellow Proud Nigerian! ..HAPPY INDEPENDENT!
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:13pm On Oct 02, 2012
DAY 128

1 Like

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 8:19pm On Oct 03, 2012
DAY 129...Dear NLander, for ur information: The Client in question is not in town. He does send money on regular basis while he monitor d progress of work via mail on daily basis. So far, we are able to manage his fund without problem. WHY? Because this is our watchword.....INTEGRITY!

Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 7:30pm On Oct 04, 2012
DAY 130

Re: Construction Process Of A Wing Duplex+flat At Ajah by tashan: 12:26pm On Oct 05, 2012
Well done!You're doing an excellet job. Please keep up with the updates
Re: Construction Process Of A Wing Duplex+flat At Ajah by segcymoor(m): 9:31pm On Oct 05, 2012
DAY 131...Plastering on-going
thanks my man

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (40) (Reply)

Cost Of Building A Four Bedroom Bungalow From Foundation. / WATCH THIS SPACE (Electrical Showcase & Review) / Man Builds House With 14,800 Plastic Bottles In Kaduna (pics)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 15
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.