PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 8:00am On Jan 06, 2023
Good morning y'all.... We're on site this morning to comence with the day's work as wall painting continues....

Pictures and videos updates will come in much later.... cool

I also, want to use this medium to appreciate y'all for staying with us till this very moment.

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 8:14pm On Jan 05, 2023
We're making progress on the wall painting....

See video below :


https://www.youtube.com/watch?v=pYWIFN1-gEQ
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:47am On Jan 05, 2023
Good morning guys, we're on site this morning to commence with the day's work as wall painting continues...

Video and pictures updates will follow much later.... cool

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 6:25pm On Jan 04, 2023
So we commenced with the wall painting on the interior spaces today....

See video below :


https://www.youtube.com/watch?v=pu4cm6K8Mg4
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op):
visaclick:
Hahaha, I am looking at your build practice and laughing real hard here. Sir was a Structural design done for this building? Do you even understand the kind of soil you are dealing with here, what is the BC if I may ask because why will you do such a foundation for this kind of land, I'm disappointed bro Architects should stick to drawing and shouldn't be constructing without an engineer on site. Anyways that's between you and your client and when the wall cracks begins im two years time.
Thanks for ur input sir, if you understands building designs/construction very well, you'll know before now that a structural drawings isn't required for bungalow design except for high rise buildings. A structural drawings is only required when your designs have a suspended floor which maybe 1-deck, 2-deck, 3-deck etc.... Also, to ascertain the type of foundation to use on any project, there's what is called Soil Test which can be carried out on site and a structual drawings doesn't provide such details... Thanks
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 8:48am On Jan 04, 2023
feelme3:
Op, shey you no know say you don become Nairaland celeb? You can't just disappear without telling your fans. No try am again. cheesy grin
Happy New Year bro.
Apologies boss cheesy cheesy,

Wish you same Sir. May God's unending blessings and grace be ours this year.
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:27am On Jan 04, 2023
Buharidgeneral:
Good day bros. What's the sqm of the whole land what's sqm of the space occupied with the building.

Why didn't you use hardcore stone for the foundation
Good morning sir, the total sqm of the land is
619,601sqm (apx.600sqm) while the sqm space occupied by the building(s) is 284,957sqm.

For the foundation, we arrived at doing a foundation beam for all the foundation trenches cos of the nature of the soil...
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:22am On Jan 04, 2023
michtob:
Let's see the final Outlook of the house pls
We're arriving at the final outlook boss... Thanks for stopping by
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:22am On Jan 04, 2023
Floki737:
OP, where are you ohhhhh??
good morning boss, we're right on site as we've resumed work for the year. We took a break to go celebrate the yuletide season with friends and family... Thanks for checking up...
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:19am On Jan 04, 2023
Season greetings y'all, we arrived back Akwa ibom late last night as we traveled to edo state on the 23rd to celebrate the Christmas and new year with families and friends...

We duely appolozige for the break...

We're back on site today to commence with the day's work as work begins this morning...
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op):
Meanwhile, We've modified just the design into a 4-bedroom bungalow with exact exterior look. We had requests from some person's that have been following our thread to make modifications as a 4bedroom will be their preferred choice on starting up their building project...

Price for the design still remains thesame, Thanks...

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 2:59pm On Dec 21, 2022
Work progress on the screeding is still on as we'll be rounding up with screeding work today....

See video below for work progress cool


https://www.youtube.com/watch?v=wAP0bPMlIys
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 11:29am On Dec 18, 2022
destiro:
Good evening boss. Please what's your opinion on getting architectural drawings from Mr A. and giving it to Mr B. to build according to exact specifications?
It's not a bad idea provided you trust the person handling the construction project...
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 12:33pm On Dec 13, 2022
Hum2020:
Wow congratulations what nice building pls the guys doing the screeding how much is are they charging per sqm thanks
900 per sqm
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 5:18pm On Dec 12, 2022
onuku:
What type of roofing is that?
High pitched / Hip roof
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 5:06pm On Dec 12, 2022
Hope2023:
U mean u built this with #12m?
The 12m quoted is just for the 3-bedroom bungalow only and doesn't include fencing and concrete stamping on the floor....
That said, it could go higher depending on the quality of materials you want to use for the building and ur taste....

Most times, it's finishing that eats up the chunk of money in building construction... So let's say for example:

If I'm using allumuin roofing, I'll incure more cost than if I'm using stone coated roofing..

Again, if I'm doing pre cast concrete fascia,(parapet) I'll incure more cost than if I'm doing cast-in-situ..

Again, there are varieties of tiles that are cheaper and costlier than others... Same goes for windows, doors, pop as against pvc, screeding as against not screeding, electrical fittings etc...

So you can see that at the end of it,

Mr A can convinietly build this with 12m, while

Mr B who likes luxury and taste will end up spending 18-20m in building same bungalow...

That was why i stated in the first quote that it Depends
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 12:26pm On Dec 12, 2022
Video extract on the work progress for the wall screeding...


https://www.youtube.com/watch?v=u4p86GrKRbM
PropertiesRe: I Want To Buy A Land In Abuja But A Friend Is Advising I Wait After Election by AsomArchitectNG(m): 8:24am On Dec 12, 2022
Why ? Oga land doesn't depreciate, go and buy the land immediately if you have ur cash before extra 1m go enter........
We're currently building a 3-bedroom residential accommodation at oron Akwa ibom, and we've successfully taken it to finishing stage... See my signature for project updates
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:12am On Dec 12, 2022
Good morning my people, we're on site this morning as we'll continue work with the wall screeding...

I'll bring in Pictures and video updates later. Thanks y'all.

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 4:09pm On Dec 11, 2022
Work progress on the wall screeding


https://www.youtube.com/watch?v=EqdLGnPfxRk
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 2:18pm On Dec 11, 2022
Video of the masters wc/bath equipped with a shower and bathtub as we now have water running inside the house cool cool


https://www.youtube.com/watch?v=K4oEe2lpgGo
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 2:07pm On Dec 11, 2022
Wall screeding starts....

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 2:05pm On Dec 11, 2022
Wall screeding paint

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op):
michtob:
Nice job you're doing
Thanks boss cool
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:45pm On Dec 10, 2022
video showing view from outside with our branded sticker on the gate pillar cool


https://www.youtube.com/watch?v=4loV3dd7ltM

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 7:42pm On Dec 10, 2022
Concerte stamped floor cool

PoliticsRe: How True Is This Video? APC National Chairman Stripped by AsomArchitectNG(m):
This isn't good at all... Let's not get involved in politics of hate or bitterness, that's one area the western world is ahead of us....
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op):
Polished concrete stamp cool

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 12:17pm On Dec 09, 2022
Polishing and washing of the concrete stamped floor ongoing....


https://www.youtube.com/watch?v=NMxw_kiCeO8
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op): 1:48pm On Dec 08, 2022
Washing of the concrete stamped floor ongoing

PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op):
michlins:
I don't know where you live and how much land costs. All these added up will not be as high as the value of the land you will waste if you do a five bedroom with masters as bungalow.

When you factor in the fact that half plot of land is about 10-15ml, you will know what is what
I can design a 5-bedroom bungalow to fit in thesame sqm a 4-bedroom will cover... There are some 4-bed designs that'll cover more sqm than even a 5-bedroom... It's all about space management in the design...

For instance, a 3-bedroom bungalow can fit into a 50ft × 100ft plot size, so also a 4-bedroom would fit into same plot size and a 5-bedroom bungalow design....
PropertiesRe: Construction Of A 3bedroom Bungalow With Bq In Oron Akwa Ibom by AsomArchitectNG(op):
michlins:
when you factor in the area surface of the land which it will consume. Land which you can use to build something else, you will realize it's better to build up. The cost difference will be very marginal
Smiles...

Like i stated earlier they ain't even mate in terms of cost implication as a duplex will cost way higher...

Now let's analyze..

1.) For a bungalow you only need 12mm rods for the wall pillars as it doesn't entails you doing a base

While,

For a duplex you'll need a 16mm rods which cost is almost times two of 12mm rods..

2.) A bungalow doesn't require internal wall pillars as all you'll be needing is just surrounding wall pillars

While

For a duplex you'll have to introduce internal wall pillars which is also done with 16mm

3.) You don't need a foundation base for a bungalow

While

For a duplex you must introduce a foundation base on every pillar points in the building

4.) You don't need to deck a bungalow

While

A duplex requires decking on which amount spent for just decking alone can take up a bungalow building from foundation to roof stage in most cases

5.) While doing lintel for a bungalow, it's not necessary you chain the internal walls

While

For a duplex it's necessary you do chain round beam on both the external and internal walls because of the decking(load coming ontop it)

6.) For a bungalow you're only doing plastering, tiling, screeding, painting etc... on just the ground floor

While

For a duplex you'll have to do plastering, tiling, screeding, painting etc... on both the ground and first floor...

So you can see that the cost implication for a duplex is way higher.. I can even go on and on analyzing...