konkonbilo:Jesus,our country has became one of d worst place in d world, i have realised that people does anything because of money so bad |
ogochukwu247:why should u kill it,they r not harmful as u can see how they r treated in south african. or are u hunger for meat |
metronaija:I'm sorry for d igbos which im one of them . quick money and competition to make it in life has landed him in life jail if not firing. my people never learn any lesson. I'm not sorry at all |
Hei,oga Tiger,pls o how many square metre aluminium roofing sheet have u used in roofing that house?thanks |
bekee72:God don they do his work on my project small small.sinse I can be able to take it to decking, I believed it's completely done |
bekee72:the blocks on ground |
spyder880: |
spyder880: |
hi my people,how many blocks can one bag of cement lay,both 9 and 6 inches?thanks spyder880: |
hi my people,how many bocks can one bag of cement chuck,both 6 and 9 inches?thanks nameoh: |
thanks spyder880: |
thanks for d info spyder880: |
My man welldon,do u mean that house is like two flat up and down,please can u say how many blocks u use on the up stage? God bless |
hi bross,i am not a builder,but the litle knowledge i have base on my own,because i am building such in lagos.my foundation,german floor,two soak away without the cover took me around 2.4million.so i think the foundation alone is about 2.1 or 2.2million.i used the soak away sand to comlete the filling.and it took me another around 2million to carry it to three blocks after lintel,including all the block work,36 pillers.you can check the pic in my post,bekee72.itjust recently. |
p[quote author=9ijaMan]oga 9IJaman,i hail,i no trust my brother wey de do my project anymore,the guy na greedy person.i have a quotation of about 2million for decking 2 flats,one 3bedroom and one 2bedroom all ensuit size of deck area 40f x 80f.they are together.its in lagos.i think 2million is toomuch,just to know if 2m is ok or not.thanks u bross. |
ok,good.thanks. |
hi,u know say have no building experience.I thought that its the whole plan.am sorry I don't have it with me hear,because the original approval document is in Nija.but what I just want to have an idea of approximate amount am looking at.but according to the quotation my builder gave me.its about #2,200,000..I beg make una help,because we de surfer to get money here. |
hi,mr spider i sent the house drawing to your email.am waiting for you.the reason is that i want to buy iron rod now because the price is good now.12mm and 16mm is 110k per ton.when i did the foundation,its fucking expensive then,last year april. |
what about using only 12mm iron in deck work.and do u think 6 tons is too much or less? |
the 350k is for all the decking labour.one question,what do u think about 3 blocks after lintel as u see.is it wrong? |
Hi,every one.na where i reach be this.i need advive for the decking.it 40ft by 80ft deck.and the lintel is being chained round.the biulder asked for,6tons 12mm,400 planks,180 bags cement,labour 350k,blumber and electrical 200k.these are my major challenge.i have not jet talk about banboo,sand,granits and others.the house is in lagos.and i live abroad,Finland. that is the house pic.its one 3 bedroom and one 2 bedroom all ensuit.that is 2 flat up and 2 down.hope to hear from u.mr spider i hail oooo.
|
bekee72: hi my people?I want Ur suggestions in decking 40ft4 x 80ft 4.what I am not sure are these materials,6tons 12mm rod.180 bags cement.450 planks 1x12x12.200 wood 2x3x12.30tons granite stone.1 trip stone dust.workmanship #350,000.plumbing and electrical work #200,000.notice,we laid 3 blocks after lintel.these are the major part I needed your brain.I am waiting to hear from u guys.God bless.
|
hi my people?I want Ur suggestions in decking 40ft4 x 80ft 4.what I am not sure are these materials,6tons 12mm rod.180 bags cement.450 planks 1x12x12.200 wood 2x3x12.30tons granite stone.1 trip stone dust.workmanship #350,000.plumbing and electrical work #200,000.notice,we laid 3 blocks after lintel.these are the major part I needed your brain.I am waiting to hear from u guys.God bless. |
bekee72: can 1 million five hundred thausand naira secure foundation and german floor of 2 wing 3 bedroom flat in a lavel dry land.the plan is 4 flat upstair.gono be gratefull to hear from you.[color=#006600][/color] |
yes,i have done foundation and german floor.its 2 flat up and down in lagos.they have laid 3750 blocks to the level before lintel,the next thing is to do the 36 pillers and the lintel.i will be traveling to Nija next month to see with my eye.i will trh to post it if i know how to do it |
i mean till 2 blocks after lintel.#400k. |
tonjon: @9ijaman do you have an idea of the cost for a 4 bedroom twin duplex in ajah(dry land) from foundation to finishing.I will await your urgent reply |
i need advice.i am about to do pillers work and lintel work of oné 2 bedroom and oné 3 bedroom grand floor.we have laid about 3750 blocks to lintel.it has 36 pillers,all ensuit.these are the iron he said we needed,16mm rod 68 pieces.12mm rod 96 pieces.8mm rod 33 pieces.he asking for all the labour blocks work,casting,capentry and iron bender #400,000.is it too much?i need your advice.thanks. |
i have tried to post the latest pic of my house but i dont know how to do it anymore.my house has gone . moře than that.the pic u saw has took mě about #2,500,000,000 including german floor and soak away.we have laid 3,750 blocks to lintel level already.i am coming to Nija. next month to do the iron work and the casting of pillers and lintel |
pls can anyone tell mě how much for every labour of taking 4 flat up stairs to lintel.i mean 2 up 2 down.block work,iron work and others casting.my builder ask #400,000. |
bekee72: can 1 million five hundred thausand naira secure foundation and german floor of 2 wing 3 bedroom flat in a lavel dry land.the plan is 4 flat upstair.gono be gratefull to hear from you.[color=#006600][/color]can any body tell me how many blocks of 9 an 6 inches needed for the pic here.i mean from dpc of one 2 bedroom and one 3 bedroom all ensuit to two blocks after lintel? |
blink182: okcan 1 million five hundred thausand naira secure foundation and german floor of 2 wing 3 bedroom flat in a lavel dry land.the plan is 4 flat upstair.gono be gratefull to hear from you.[color=#006600][/color] i needed a building ideal,but no body responded.anyway,about my 2 wing of 2 flat down and 2 flat up.i took a risk to start the project without being their because i live abroad,no chance for me to be present because of my work,my brother is the one taking care. the foundation and german floor has been completed last week,the builder extimated 1.8 million for it but it took me about 2.3 million.not easy. can ancan any oné tell mě any ideál for decking 4 flat which is oné 3 bedroom and oné 2 bedroom.all ensuit.thanks.yone update me on what and how much it going to take me to the level before decking?gono apreciate it,thanks. i am building a storey building of one 3 bedroom flat and 2 bedroom flat down and up,all ensuit.i have now finish the german floor.can any one educate me on how many iron rod of kinds needed and cement, granits, sand,wooods and blocks and other to 2 block after lintel.it has 32 pillers. notice,altogether four flat.thanks. [quote author=ni nomore updates? i ve following ur thread and l would like to know how much spent so far? pls treat as urgent. i use ur cost breakdown for my budget. Thank u[/quote] nife07: Hi Syder880, wats up? no more updates? i ve following ur thread and l would like to know how much spent so far? pls treat as urgent. i use ur cost breakdown for my budget. Thank u nife07: Hi Syder880, wats up? no more updates? i ve following ur thread and l would like to know how much spent so far? pls treat as urgent. i use ur cost breakdown for my budget. Thank u Meringe: My mAn, what's the cost as moment. |