Bplenty's Posts
Nairaland Forum › Bplenty's Profile › Bplenty's Posts
1 2 3 4 5 6 7 8 9 10 (of 12 pages)
@dereklcopeland Thanks sir. |
@Londoncool, Good on you for commencing the work on your project. Well done sir. |
@teebawse If you follow through the thread its on one of the pages boss. Cheers |
The inner nets for the bulglary guard has finally been fixed by the window guy @mufutau55 Hajj introduced to me. I am quite pleased with the job and the project has come to halt for now due to cash been exhausted. We will see how far we go again before the end of the year to try and do the fence works and gate house.
|
Absolutely sir @abbeyboy2o15 |
@abbeyboy2o15. Thanks there is alot to learn from here. |
@abbeyboy2o15 The plan of this project is in the first page of the thread. Foundation was around 400k sir. I hope this helps. Cheers |
@Abbeyboy2o15 Can you please remind me what it was again sir? Im sorry I have been a lot busy with work lately. |
Front, sides and rear look of the building.
|
@mufutau55, Thanks Hajj everything is nicely done indeed sir |
The door has finally been fitted and corrected from the previous that was spoilt by @kolashangeone and his boys. Black cement been added to the black and gold tiles for the living room. And the full photo of the building from a front view.
|
Frontage has been done. More photos to follow.
|
@pseudomonas Brother I feel your pain. It can only get better. Once your not on site these things tends to happen. The only way is to find someone capable of looking after the project for you is the way to go. Hope it gets better. |
Kitchen tiles after its been cleaned. Tiled hall way that connects the three other rooms. Door to the visitors toilet has also been fixed and its 2.5 mtrs wide. The stair case to the main entrance has also been tiled.
|
More photos
|
Pictures of the toilets and wash hand basins
|
@Pseudomonas Im a bit confused about what your asking. Can you clarify abit further please. Cheers. |
Follow up toilet photos. The doors have been widened. Bigger and better for the 3 doors that @kolashangeone and his boys ruined. Doors waiting to be fixed.
|
Yea I understand what @mufutau55 is telling you to do. Still see no reason why this cant be done either rectangular view or not @kolashangeone |
@mufutau55 your opinion is well seconded @kolashangeone please kindly use high grade China tiles to same colour and design up to 2/3 ft as I ha earlier suggested. Thanks |
@ricki Estimate is around 900k sir. |
And more photos
|
More photos
|
More pictures of the recently completed tile n skirting work.
|
@larwin Thanks for featuring the project on your thread. Well appreciated. @agarawu23 You want make we tile your room all the way to the top? Lol no lele mk dem finish tile work clean it all up then I go show u your room sir. No worries mate. |
Thanks a great deal @larwin, iwo ni ire kan o. she amin adura. ![]() |
@Larwin Off course you shall be able to recognize the house. It's just gone through a lot of remodeling ni. |
The front porch received some touch up with the wall talls for main entrance.
|
@agarawu23 Thanks for your comment. I appreciate and for next time this will be duly noted. Thanks again sir. @kolashangeone over to you. |
no worries champ @abbeyboy2o15 |
More photos of the completed tiles for the toilet. @abbeyboy2o15 I shall revert back to you before night fall.
|
@. abbeyboy2o15 Thanks for asking, the land is a plot and half. Foundation was around 400k If I could. I could dig up files for you and then get back to you sir. |