Amen amen amen at Hajj. Thanks for the prayers. More photos will follow soon. |
More photos of the plastering will be uploaded as soon as it is made available to me. ![]() |
The current look of what the building looks like at the moment. The internal doors will be fixed and the plastering will continue for the outside portion. It will have the window belts, roman pillars and other things that will beautify the building as it progresses. Thanks again.
|
Rooms that are currently been plastered.
|
...............
|
more photos.
|
As I promised, I have more photos of the completed casement windows that has been fixed. Also with it is the new burglary proof. The plastering has started and the floors has been completed too.
|
.. |
@gen2briz thanks amen. @hajj m. Abi o one can do nothing about that. Thanks again God bless you abundantly amen. |
. |
................ |
The burglary proof that were previously installed will be removed and replaced on @Kolashangone's recommendation. Now to the photo where their was a child working as part of the team. I have asked @kolashagone to please let no child work on the site. I am against child labour. My personal/professional ethics stands against it. So pardon the photos that were uploaded. I shall add more photos as the project progresses phase by phase. Blessings all the way for us all. Amen.
|
More photos of plumbing, pipes, hoses going to link the soak away.
|
My master bedroom's size is 10ft by 14. This was no error from Kola as the previous builder made the big mistake on this one.
|
That picture with that little man got me curious. I had to double check with @kolashangone if he works on the site. He said no. I told him with no remorse that I don't want underage workers on the site before people will crucify me for child labour. ![]()
|
More blocks for the double, more sands for the filling, plumbing materials and works on going.
|
More photos, casements etc.
|
Hi again E-Family, We are back again to push the project a bit further till my finances say no more to the on-going product. Now after travelling home last year to inspect the house. I am happy that the project did commenced. I however choose to stop at the roofing as what was done wasn't what I had anticipated. In lieu of this. I have engaged the services of professionals to continue the job. Contractor is : @kolashangone and his boys. Many thanks to Hajj M for his genuine figure head that he has been on this forum, I appreciate all your recommendations/suggestions so far. Here are pictures of then and now of the project which will further bring a new phase. The burglary proof that was used initially will be changed to a better design that what it was before now. Kola has introduced double walls where necessary to avoid cracking up of blocks when filling it with laterite and filling. Plastering, window casement and all other essentials will go on this project till we put it on hold again till we have gathered enough funds to continue. Thanks again to all members. God bless.
|
Hi guys, Please. I'm in dire need of the materials for the Academic test. Please help forward to vibrantjd@gmail.com please Thanks. |
@nanajec, the full plan is on the front page of the thread. Kindly do have a look. Sorry that I have just replied to your post. I have been away on holidays. |
@Imoci, Thanks for your input. All together total sand filing was 6 big tipper trips. Part of the soakaway that was dug out was used too. @excat, my aunty bought the long span roofing sheet. it was sought from Tower aluminium company. The cost I shall give later as I have non of the paper work for the project yet. @smiley001, thanks and a big resounding amen to that. God bless mate. Big cheers to everyone and their inputs. God bless us all Amen. |
Hi E-Family, Here is more photos on the roofing of the project. thanks to everyone. God bless us all. amen
|
..... |
So next stage of the house. Wood work has been completed. Soakaway completed. Sand filling to the rooms done. Bulglary done. God willing aluminium roofing sheets will follow suit soon. To all the advises and those I worked with offline Nairaland I appreciate everyone. God bless us all. Amen.
|
More photos of the completed lintel stage thats ready for roofing. Soakaway is currently being dugout to fill the rooms. Photo credit goes to adeekiti. Thanks again guys. God bless us all
|
@mufutau55 Thanks for the emal. I got it. I replied you with some queries to your email. God bless. Cheers |
@mufutsu55 Thanks again for your prompt reply, my email is vibrantjd@gmail.com thanks. Oh well Ogun state lands seems to be easier to purchase and could become another mega place to live like Lagos, Abuja and Calabar. No offense on the aforementioned tho |
Thanks very much guys. I do appreciate everyone's inputs. Project is at Ifo. Ogun state. @mufutau55 your roofings is excellent. I'd like to do same. Wouldn't be too much if I kindly ask the total breakdown of your roofing, woodwork plus labour cost please? Thanks in advance. Per your advise I have resolved to using long span aluminum roofing sheets. Thanks and God bless us all. Amen |
@kolashangone Thats rather a long long process that will eat up more funds that wasnt planned for. It's all good. Will let you know whatever I decided to do before its roofed. Thanks again. Cheers |