Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 8:24pm On Mar 12, 2018 |
galaxi: I supervised this project myself and i have spent 11m but this is because i used the best of materials(expensive tiles,pop round the house,casement window,stainless rail,metro tile roofing sheet is also costly etc. I think if less expensive materials are used you should get to this point with 6m to 9m. The actual cost of the house is dependent on your choice of material. See attached image! Please what was the cost of your external door. � |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 11:10am On Mar 09, 2018 |
galaxi: I supervised this project myself and i have spent 11m but this is because i used the best of materials(expensive tiles,pop round the house,casement window,stainless rail,metro tile roofing sheet is also costly etc. I think if less expensive materials are used you should get to this point with 6m to 9m. The actual cost of the house is dependent on your choice of material. See attached image! Please what was the cost of your external doors |
Properties › Re: BEST QUALITY IMPORTED BULLETPROOF SECURITY DOORS AT REDUCED PRICES FOR HOMES by couragemath: 10:59am On Mar 09, 2018 |
CrixusD: GET THE MOST BEAUTIFUL DOORS WITH GREAT SECURITY, BEAUTY AND SAFETY, DESIGNED WITH THE VERY BEST OF ISREALI'S INTELLIGENCE. WHAT MORE CAN YOU ASK FOR?
ARMORED & STEEL BULLET-PROOF SECURITY DOORS Custom made by the Finest craftsmen in Isreal, these fully welded steel frame security doors protect your family and investment from Gunshots and Fire. They come in different designs and ratings, such as Decorative, Regular, Fire-rated(ability to withstand fire for 30,45 or 60 minutes).
STANLEY STEEL/AMERICAN STEEL/SUN DOOR The finest steel finishing there is in door design, comes in different ranges such as Decorative, Panel & Flush, Powder Coated, Wood finishing, Etc.
MDF & HDF The best of wooden doors available. Durable, Long-lasting and Classy designs.
All doors Features include high quality double cylinder security locks, hinges and door closers. Heritage style spindles, corner scrolls and rails can be specified.
• Tamper Proof Hinges
• Specify RHH or LHH
WARRANTY: 1 YEAR
Please call 08052747514
Company delivery Available ...................................................................................................................................................
See Different Sizes and Prices below.
 Was the cost of a bullet proof door now |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 2:05pm On Mar 04, 2018 |
kenazuu: Like others have said, it depend on your design, taste and finishing. I am presently working on one, my brother is by his Grace considering the cost of things now. Things I can remember cos at a point I lost count on keeping record. 4 bedroom bungalow with two sitting rooms, all room ensuit and big kitchen.
Total sqm is 200.
Roofing using longspan .45mm , wood and labour including transport=980k
POP= 3500*200= 700k Window casement and burglaries= 630k Conduct and Wiring plus labour= 600k but wire was stolen so I will have to do the wiring again Tiles plus labour= 1m 4500 blocks @ 170 = 765k Laying of block= 247k Plastering in and out= 320k Casting of parapet ( cement,granite, iron rod, wood and labours) =580k
Garman floor= cannot remember how much
Total numbers of cement used for foundation, laying of blocks, plastering, cement for tiles. Not included cos I cannot remember again.
Toilet seats= 5 @ 65k= 325k Doors for toilets with store = 6 @ 23k=138k Internal room doors with kitchen = 6@30=180k Wall screeding 300 Sam @ 300= 90k excluding materials Exit doors 2 (3ft) @ 85k each and 4ft @120k =290k excluding installation
Also mechanical (plumbing work) forgotten amount spent
Soak away, facing security house. Cannot remember amount spent.
I and am still trying to finish.
Please how many bags of cement was used for plastering and what was the cost of labour |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 2:20am On Feb 24, 2018 |
Please was the cost of plastering a 4 bedroom bungalow. 3 bathroom. Please help with the number of cement, sand and labour. Thank you everyone. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 4:14am On Feb 06, 2018 |
The attached is estimate I was giving for casement window. Please is the prices reasonable. Thanks everyone.
|
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 9:33pm On Feb 05, 2018 |
|
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 6:59am On Jan 29, 2018 |
|
Properties › Re: Roofing Sheets: The Cost Of Various Types Of Roofing Sheet In Nigeria by couragemath: 5:03pm On Dec 26, 2017 |
From the first time I spoke with you, I knew that you will be the one to do my project. Your honesty and dedication is highly commendable. Is great to know that we still have trust worthy and honest Nigerians. Please Mr Ayuub continue with your good job. I highly recommend Mr Ayuub for your roofing project and you will not be disappointed! |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 4:53pm On Dec 26, 2017 |
My Ayuub did such a good and honest job. I never saw him, but he carried out an honest job with his staffs. Is glad to know that we still have honest Nigerians. I highly recommend him for your roofing project! |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 6:13am On Dec 11, 2017 |
galaxi: Thank you for your reply. So in all both wood and tile how much did you spend. I think your project is bigger than mine. I just want to have an idea of the cost before commencing because I do not want a situation were the wood is exposed. I rather just wait instead of doing the wooden aspect and not been able to afford the roofing sheets. Once again thank you for your reply and is deeply appreciated!
Yes it is a four bedroom bungalow but i built it to my taste!
Rooms are very big and all suite with double parlor and a visitors toilet at the front varander.
If you do not have a big burget i advice you stay away from metro tiles, it's expensive. I think with 1m you can get long span roofing sheet. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 4:54am On Dec 10, 2017 |
galaxi: Thanks for this. Is this a 4 rooms bedroom bungalow. And was the price of the various roofing tiles. #2850 is above my budget. I’m budgeting at least 1m for just the roofing tiles. Is that reasonable.
That is the image of a similar project,total sqm is 501 and i bought 1 sqm at #2850 and labour 180 per sqm. Atleast 200k - 250k should be able to get the other components you need.
The actual cost of roofing sheets is dependent on the total square metres of your house and also the material you chooses to use. |
Properties › Re: How Much Will A 5 Bedroom Duplex Cost? by couragemath: 12:51am On Nov 16, 2017 |
ever811: oga you lie..how how much will it cost to purchase the following alone..blocks,chipping stones,... ...cement for casting of foundation trenches,dpc slab,first floor slab,laying of blocks ,plastering, suckaway and tailing job.rood,wood for lintels,slab and roofing.roofing sheet..electrical material plumbing materials,..etc..baba 9m is just no where close pls..bellow is a bungalow we are currently working on,..the total cost for this bungalow is 52mill.... @ever, please what was the cost of roofing. Wood included. You mentioned 52mil...you meant 5.2milliom right! |
Properties › Re: ROOFING: REPLICA OF YOUR PROJECT (Cost & Sqm Of Stone Coated Roof Tile Used). by couragemath: 11:54pm On Nov 13, 2017 |
Lanre4uonly: PROJECT LOCATION: Ijede road, Ikorodu, Lagos State.
PROJECT DURATION: From 10-11-2017 To 11-11-2017.
SQUARE METER: 514sqms
ROOF PANEL: BOND DESIGN with 50years warranty.
GAUGE:0.55mm
COLOR: CHOCOLATE BROWN
Total Cost Estimate:#2,042,150 (Including rain/water collector materials).
For your quality stone coated roofing tiles from New Zealand and South Korea.
CALL/WHATSAPP LANRE: 07036136517.
OWNER'S COMMENT: See screenshot below.
Thanks so much for your patronage. @lanre Does this amount include wood. I have a 4 bedroom with 2 seating rooms and 3 bathrooms. Can you tell me the cost of roofing… I’m not sure of the sqm. Let me know as soon as possible if we can work together |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 12:11am On Nov 02, 2017 |
Please guys I'm still waiting for a reply |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 12:27am On Oct 27, 2017 |
kenazuu: Like others have said, it depend on your design, taste and finishing. I am presently working on one, my brother is by his Grace considering the cost of things now. Things I can remember cos at a point I lost count on keeping record. 4 bedroom bungalow with two sitting rooms, all room ensuit and big kitchen.
Total sqm is 200.
Roofing using longspan .45mm , wood and labour including transport=980k
POP= 3500*200= 700k Window casement and burglaries= 630k Conduct and Wiring plus labour= 600k but wire was stolen so I will have to do the wiring again Tiles plus labour= 1m 4500 blocks @ 170 = 765k Laying of block= 247k Plastering in and out= 320k Casting of parapet ( cement,granite, iron rod, wood and labours) =580k
Garman floor= cannot remember how much
Total numbers of cement used for foundation, laying of blocks, plastering, cement for tiles. Not included cos I cannot remember again.
Toilet seats= 5 @ 65k= 325k Doors for toilets with store = 6 @ 23k=138k Internal room doors with kitchen = 6@30=180k Wall screeding 300 Sam @ 300= 90k excluding materials Exit doors 2 (3ft) @ 85k each and 4ft @120k =290k excluding installation
Also mechanical (plumbing work) forgotten amount spent
Soak away, facing security house. Cannot remember amount spent.
I and am still trying to finish. @Kenazuu thanks for your post. please I have a question with regards parapet and roof. was your parapet precast before been installed. Here is the quote I was given for parapet 50 bags of cement 40 rods 35 bamboo wood 12 1 by 12 1 role of binding wire 16 pieces of long quarter rods Sundos gravel 6 yards of chicken net. labour 150k Please is this reasonable. Secondly with regards roofing. I was given this quote for wood if I am roofing with metro tile 25pieces of 3 by 4 150pieces of 2 by 4 110pieces of 2 by 3 650pieces of 2 by 2 2bags each of 3inch and 4inch nail labour 150k for aluminum roofing sheets he quoted 25pieces of 3 by 4 130pieces of 2 by 4 130pieces of 2 by 3 250pieces of 2 by 2 please everyone I need your contribution. He could not tell me the estimate of the metro tile or aluminum since the wooden aspect have not been done. does anyone know the cost of metro tile/aluminum for a four bedroom bungalow. Thank you everyone. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 4:05am On Oct 22, 2017 |
Please I need a reply for my questions previously asked. Thank you guys |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 1:02am On Oct 20, 2017 |
Please was the cost of casting a lintel (4 bedroom bungalow with 8 pillars). Labour and material included. Also I will also like to have an idea of the cost of a roof parapet. The bags of cement needed and also the rod. Thank you everyone for your help. You guys have been so helpful. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 1:51pm On Oct 15, 2017 |
Does anyone know the cost of roofing a 4 bedroom bungalow with aluminum roofing sheets. Thank you. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 10:15am On Oct 10, 2017 |
couragemath: Thanks for the info @ayodele. I’m really grateful at @ayodele thank you so much. You have been so helpful. Please can you give me your email so can email you Secondly how much is town planing. They came and size our work equipment yesterday and they are saying I pay 170000 naira to approve my plan/drawing. Guys please I need your response. Thank you. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 12:16am On Oct 07, 2017 |
ayodele234: 16 trips of red sand at 8,000 each and 25,000 naira for labor Thanks for the info @ayodele. I’m really grateful |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 4:46pm On Oct 02, 2017 |
ayodele234: pay 35,000 for german floor labor and use 15 bags of cement @ayodele please what is the cost of filling the foundation, labour included. Thank you. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 2:23am On Sep 30, 2017 |
please guys, what is the cost of german floor and how important is it. thank you once again! |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 12:16pm On Sep 28, 2017 |
ayodele234: 12,000 naira to dig the soak away Thank you @ayodele. I really appreciate this info. I just found out that a tipper load of red sand is 8k |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 11:19pm On Sep 27, 2017 |
Thanks to you guys. Foundation went so well. Is funny how people try to exploit you but thanks to you guys for your contribution. Now that the foundation is done, does anyone know the cost of digging a 10 feet soakaway. Someone told me 70k. I was thinking of digging the soak away so I can use the sand for filling. Secondly, how many tipper load of sand will be needed for the filling. My foundation is really high (5 coach of block). At this stage, how much should move the progect from the foundation to lintel level. It has 8 pillars because of parapet. Thanks again to you guys. Persons like me really appreciate your Precious time and contribution |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 11:20pm On Sep 20, 2017 |
ayodele234: mould your own block. Pegging is 8k, digging and pouring should be 8 persons at 3500 each. Laying of blocks is 50 naira per block Thank you so much for this insight. I just discussed with the guy that I have made my research and he was so surprised. And he has agreed to do the work based on your quote. Is so surprising how people exploit their fellow man. Thank you guys for the response!!! |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 10:56am On Sep 19, 2017 |
Here is the estimate
|
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 10:32am On Sep 19, 2017 |
Thanks chukazu for the reply. Please the attached below is the quotation given me from foundation to dpc. Is this okay guys. Thank you. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 11:08am On Sep 18, 2017 |
thank you @chukazu and others for your contribution. I really appreciate men like you taking out time keeping people informed. As said by chukazu, I calculated that moulding blocks is really cheaper than buying. but is it reasonable to pay someone 8k for moulding 10 bags of cement. please I look forward to you guys reply. Thanks once again. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 7:46pm On Sep 16, 2017 |
Is it reasonable to dig a foundation with 45000 thousand naira. the guy drawing my plan say that will be the amount for a 4bedroom bungalow . And also he says it cost 55naira to set one block. is it cheaper to buy blocks than moulding. Please everyone I need your contribution. Thank you for your time. |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 2:32am On Sep 15, 2017 |
Thank u @kenazuu for your time. You mentioned you used 4500 blocks. Was that from foundation to roof. Thank you and I'm so happy for you |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath(op): 4:25am On Sep 13, 2017*. Modified: 4:25am On Feb 06, 2018 |
Please was the estimate of getting this attached file from the foundation to roof stage. Block work and labour all included. Please your contributions are highly appreciated. Thank you! |